709514.02 Payment for mobilization up to the limitations specified herein will be made in two separate installments. The first installment of 50 percent of the Contract lump sum price for mobilization will be made on the first progress estimate following partial mobilization and initiation of construction work. The second installment will be made on the next progress estimate following completion of substantial mobilization, including erection of the Contractor’ s offices and buildings. Completion of erection of processing plants, if any, will not be required as a condition for the release of the second installment. If the original Contract lump sum price for mobilization exceeds the total mobilization payout limit stated in the table below, the excess will be included on the semifinal estimate. Contract Amount More Than To and Including Total Mobilization Payout Limit $0 $200,000 10% of total contract amount 200,000 1,000,000 $20,000 plus 7.5% (of total contract amount minus $200,000) 1,000,000 More $80,000 plus 5% (of total contract amount minus $1,000,000) No additional payment will be made for demobilization and remobilization because of shutdowns, suspensions of work, or other mobilization activities. When not shown as a pay item, the cost of mobilization shall be included in the price bid for other appropriate items of work. Payment will be made under: ———————————————————————————Pay Item Pay Unit———————————————————————————Mobilization Lump sum——————————————————————————— SECTION 514 – FIELD OFFICE
514.01 Description
This work shall consist of furnishing, erecting, equipping, maintaining and removing upon completion a field office of the type specified for the exclusive use of Department Engineers and Inspectors at a location on the project approved by the Engineer.
514.02 Procedures
The field office and equipment required herein shall remain the property of the Contractor. The Contractor supplied Department field office shall be separated from buildings and trailers used by the Contractor and shall be erected and made functional as an initial operation of the work. The Contractor’ s failure to have the field office functional when work first begins on the project will result in the Engineer withholding payment of the Contractor’ s monthly progress estimate, except that the estimate will not be withheld if the Contractor has shown that the failure is not due to negligence on his part or for reasons beyond his 710514.02 control. The field office shall be operational throughout the duration of the project and shall be removed from the project site upon completion and final acceptance of the project. Furnishings and equipment specified herein shall be maintained in sound and functional condition throughout the duration of the project. The field office shall be weatherproof, tightly floored and roofed, constructed with an air space above the ceiling for ventilation, supported above the ground and anchored against movement. The width of the field office shall be at least 8 feet, and the floor-to-floor ceiling height shall be at least 7 feet 6 inches. If a trailer is provided for the field office, its width shall be at least 7 feet 6 inches and the floor-to-ceiling height shall be at least 6 feet 6 inches. The inside walls and ceilings shall be constructed of Masonite, gypsum board, or other similarly suitable materials as permitted by national and\or local fire and building codes. The exterior walls, ceiling and floor shall be insulated. Field office shall be provided and outfitted as follows according to the type specified. Type I Field Offices shall have an enclosed floor space of at least 500 square feet with 100 square feet of counter space and 120 square feet of overhead shelving. The field offices shall be equipped with the following: Quantity Item 4 Double–pedestal desks, keyed, (approximately 60 inches by 34 inches or at least 2,000 square inches) 1 Plan and drafting table (approximately 30 inches by 96 inches) with an adjustable stool 2 Computer tables - 29 inch height (approximately 48 inches by 30 inches surface area) 3 4-Drawer metal fire protection file cabinets, 15-inch drawer width, minimum UL rating of Class 350 2 2-Drawer fire protection file cabinets, 15 inch drawer width, minimum UL rating of Class 350 2 Rolling Plan racks for 24 by 36 inch drawings with 6 plan clamps 2 Bookcases, 36 inches by 42 inches with four shelves 1 Dry erase board – wall mounted, minimum 15 square feet, with eraser and markers 1 Small frost free refrigerator 1 Small microwave 2 Printing calculators 6 Office Chairs, 2 with casters 3 Wastebaskets 3 Folding conference tables – minimum 36 inches by 72 inches 4 Folding chairs 1 Pencil sharpener 1 Answering Machine 1 Facsimile machine with optional memory and service contract for preventative maintenance, including replacement print cartridges 1 Copy machine with the following features: - Capability of copying 8-1/2” x 11”, 8-1/2 x 14” and 11” x 17” sized originals - Bin sorter - Automatic Feed - Automatic paper size selection - Size magnification/reduction from 200% to 50% of original image size - Service contract with preventive maintenance, including drum replacement and toner supply 1 First Aid kit containing eyes and skin protection for emergencies 2 Smoke detectors with batteries 711514.02 Type II Field Offices shall have an enclosed floor space of at least 400 square feet and shall be equipped with the following: Quantity Item 1 Double–pedestal desk, keyed (approximately 60 inches by 34 inches or at least 2,000 square inches) 1 Plan and drafting table (approximately 30 inches by 96 inches) with an adjustable stool 1 Computer table - 29 inch height (approximately 48 inches by 30 inches surface area) 1 4-Drawer metal fire protection file cabinet, 15 inch drawer width, minimum UL rating of Class 350 2 2-Drawer fire protection file cabinets, 15 inch drawer width, minimum UL rating of Class 350 1 Rolling Plan rack for 24 by 36 inch drawings with 6 plan clamps 1 Bookcase, 36 inches by 42 inches with four shelves 1 Dry erase board – wall mounted, minimum 15 square feet, with eraser and markers 1 Small frost free refrigerator 1 Small microwave 1 Printing calculator 4 Office chairs, 2 with casters 4 Folding chairs 4 Wastebaskets 1 Folding conference table – minimum 36 inches by 72 inches 1 Pencil sharpener 1 Answering Machine 1 Copy machine capable of copying 8-1/2” x 11”, 8-1/2” x 14” and 11” x 17” sized originals 1 First Aid kit containing eye and skin protection for emergencies 2 Smoke detectors with batteries Type III Field Office shall have an enclosed floor space of at least 200 square feet and shall be equipped with the following: Quantity Item 1 Double–pedestal desk, keyed (approximately 42 inches by 30 inches) at least 1,250 square inches 1 Plan and drafting table (approximately 30 inches by 72 inches) with an adjustable stool 1 Computer table - 29 inch height (approximately 48 inches by 30 inches) 1 4-drawer metal fire protection file cabinet, 15 inch drawer width, minimum UL rating of Class 350 2 2-Drawer fire protection file cabinets, 15 inch drawer width, minimum UL rating of Class 350 1 Rolling Plan rack for 24 by 36 inch drawings with 6 plan clamps 1 Dry erase board – wall mounted, minimum 15 square feet, with eraser and markers 1 Small frost free refrigerator 1 Small microwave 1 Printing calculator 3 Office chairs, 2 with casters 4 Folding chairs 2 Wastebaskets 1 Folding conference table, minimum 36 inches by 72 inches 1 Pencil sharpener 712514.02 1 Answering machine 1 First Aid kit containing eye and skin protection for emergencies 1 Smoke detector with batteries
514.03 Measurement and Payment
Field office will be measured in months of actual use by the Engineer and Inspectors and will be paid for at the contract unit price per month. This price shall include furnishing, erecting, maintaining, and removing the field office when no longer required, and providing the facilities, furnishings, equipment, utilities and services as described herein. Payment for periods less than one month shall be based on the pro-rata days during the month that the field office was used by the Engineer and Inspectors, however, payment will not be made for any time in excess of the time limit established in the Contract as extended in accordance with Section 108.04. 714514.03 Installation and service fees for the telephone(s) and high speed Internet service will be paid for by the Department. Payment will be made under: ———————————————————Pay Item Pay Unit———————————————————Field Office (Type) Month——————————————————— SECTION 515—PLANING OR MILLING P A VEMENT
515.01 Description
This work shall consist of mechanically planing rigid or flexible pavement to the designated depth specified in the Contract in preparation for pavement repair or pavement overlay and disposing of milled cuttings in accordance with Section 106.04 or using such cuttings in the work if permitted in the Contract or directed by the Engineer. Rigid pavement will mean hydraulic cement concrete pavement or hydraulic cement concrete surfaced pavements and flexible pavement will mean asphalt concrete or asphalt concrete surfaced pavements herein. Planing as used in this section may also be referred to as milling or grinding.
515.02 Equipment
The Contractor shall perform planing with a pavement planing or pavement grinding machine of a capacity and type that has operated successfully on work comparable to that specified in the Contract. Milling or cold planing equipment shall be capable of accurately cutting to the depth, width, length, and typical section specified in the Contract in flexible pavement or rigid pavement while leaving a uniformly cut or ground roadway surface capable of safely handling traffic prior to pavement repair or overlay placement. The milling equipment shall not damage the underlying pavement surface or structure. The milling machine shall be equipped with an automatic grade control system that will control the longitudinal profile and cross slope of the milled pavement surface as the milling operation proceeds. The ground speed of the machine and the cutting equipment shall operate independently. The machine shall have a self-contained water system for the control of dust and fine particles. The width of the machine shall allow for the safe passage of controlled public traffic while in use. The machine shall have a dust collection system or have a system capable of minimizing the dust created by the planing operation escaping into the atmosphere. The Contractor shall continuously monitor the cutting or grinding head of the machine so as to produce and maintain the creation of a uniformly textured milled surface. Equipment and vehicles in use under traffic shall be equipped according to the VWAPM.
515.03 Procedures
Limitations of operations for planing operations shall be in accordance with Section 108.02 and as specified in the Contract. The Contractor may perform either regular planing or performance planing at his option unless otherwise stated in the Contract. The finished surface for regular pavement planing and performance planing shall