708512.04 —————————————————————————————————————Pay Item Pay Unit—————————————————————————————————————Flagger service Hour Automated Flagger Assistance Device Hour Pilot vehicle Hour Electronic arrow board Hour Warning light (Type) Day Group 2 channelizing device Day Group 2 longitudinal channelizing device Linear foot Pedestrian barricade device Linear foot Traffic barrier service (Type and/or Standard) Linear foot Traffic barrier service Guardrail terminal (Standard) Each or Linear foot Impact attenuator service (Type) Each Temporary traffic control signal (Location) Lump sum Modify Signal (Location) Lump sum Temporary pavement marking (Type and width) Linear foot Temporary pavement message marking (Size character, Type or class material) Each Temporary pavement symbol marking (Symbol, Type or class material) Each Eradication of existing linear pavement marking Linear foot Eradication of existing nonlinear pavement marking Square foot Temporary pavement marker ([ ]-way) Each Temporary Diversion (Standard and type) Linear foot Aggregate material (No.) Ton Type 3 barricade (Width) Each Temporary sign Square foot Truck-mounted attenuator Hour Portable traffic control signal Lump sum Portable changeable message sign Hour Temporary curb ramp (Type) Each Temporary detectable warning surface (width) Linear Foot Temporary detectable warning strip Linear Foot Portable temporary rumble strip Each ————————————————————————————————————— SECTION 513—MOBILIZATION
513.01 Description
This work shall consist of performing preliminary operations, including: moving personnel and equip - ment to the project site; paying bonds and insurance premiums; and establishing the Contractor’ s offices, buildings, and other facilities necessary to allow work to begin on a substantial phase of the Contract.
513.02 Measurement and Payment
Mobilization will be paid for at the contract lump sum price. This price shall include demobilization. 709514.02 Payment for mobilization up to the limitations specified herein will be made in two separate installments. The first installment of 50 percent of the Contract lump sum price for mobilization will be made on the first progress estimate following partial mobilization and initiation of construction work. The second installment will be made on the next progress estimate following completion of substantial mobilization, including erection of the Contractor’ s offices and buildings. Completion of erection of processing plants, if any, will not be required as a condition for the release of the second installment. If the original Contract lump sum price for mobilization exceeds the total mobilization payout limit stated in the table below, the excess will be included on the semifinal estimate. Contract Amount More Than To and Including Total Mobilization Payout Limit $0 $200,000 10% of total contract amount 200,000 1,000,000 $20,000 plus 7.5% (of total contract amount minus $200,000) 1,000,000 More $80,000 plus 5% (of total contract amount minus $1,000,000) No additional payment will be made for demobilization and remobilization because of shutdowns, suspensions of work, or other mobilization activities. When not shown as a pay item, the cost of mobilization shall be included in the price bid for other appropriate items of work. Payment will be made under: ———————————————————————————Pay Item Pay Unit———————————————————————————Mobilization Lump sum——————————————————————————— SECTION 514 – FIELD OFFICE
514.01 Description
This work shall consist of furnishing, erecting, equipping, maintaining and removing upon completion a field office of the type specified for the exclusive use of Department Engineers and Inspectors at a location on the project approved by the Engineer.
514.02 Procedures
The field office and equipment required herein shall remain the property of the Contractor. The Contractor supplied Department field office shall be separated from buildings and trailers used by the Contractor and shall be erected and made functional as an initial operation of the work. The Contractor’ s failure to have the field office functional when work first begins on the project will result in the Engineer withholding payment of the Contractor’ s monthly progress estimate, except that the estimate will not be withheld if the Contractor has shown that the failure is not due to negligence on his part or for reasons beyond his