2024 Sp ecifications 616
Article 1 — Description
Test the performance of roadway and high mast lighting systems .
Article 2 — Construction
Perform tests on the lighting system and tests required by Item 618, “Conduit” ; Item 620, “Electrical Conductors” ; and Special Specification, “Duct Cable.” Ensure all components are properly installed. Place the lighting system in operation for a 14-day test period. Burn the lighting system steadily for 48 hr., then cycle the photocell or other control device for 12 days. Pass a 14- day performance test of the lighting system. Replace materials that are damaged or have failed before acceptance. Damaged illumination assemblies, except those damaged by the Contractor, and minor failures of lamps, ballasts, and photocells are not cause for modifying or restarting the performance test. Replace failed or damaged existing lighting system components when caused by the Contractor. The Department will relieve the Contractor of maintenance responsibilities upon passing a 14- day performance test of the lighting system.
Article 3 — Measurement and Payment
The work performed, materials furnished, equipment, labor, tools, and incidentals will not be measured or paid for directly , but will be subsidiary to pertinent Items. The Department will pay for electrical energy consumed by the lighting system.