Incidentals (Items 600-699)

681Temporary Traffic Signals

TX · 2024 Standard SpecificationsBook pages 939940View official source ↗

Article 1 — Description

Furnish, install, operate, maintain, reconfigure, and remove temporary traffic signals .

Article 2 — Materials

Furnish new or used materials as shown on the plans and in accordance with this Item and the pertinent requirements of the following Items (except for “Measurement ” and “P ayment ”).  Item 416, “Drilled Shaft Foundations”  Item 610, “Roadway Illumination Assem blies”  Item 617, “Temporary Roadway Illumination”  Item 618, “Conduit”  Item 620, “Electrical Conductors”  Item 621, “Tray Cable”  Special Specification, “Duct Cable”  Item 624, “Ground Boxes”  Item 625, “Zinc -Coated Steel Wire Strand”  Item 627, “Treated Timber Poles”  Item 628, “Electrical Services”  Item 636, “Signs”  Item 656, “Foundations for Traffic Control Devices ”  Item 680, “Highway Traffic Signals”  Item 682, “Vehicle and Pedestrian Signal Heads”  Item 684, “Traffic Signal Cables”  Item 686, “Traffic Signal Pol e Assemblies (Steel )”  Item 687, “Pedestal Pole Assemblies”  Item 688, “Pedestrian and Vehicle Detectors” Obtain signal equipment at locations shown on the plans if the equipment is furnished by the Department. All materials determined to be in good working condition by the Engineer can be reused on temporary traffic signals. Do not use previously installed materials for permanent traffic signal installations.

Article 3 — Construction

Install traffic signal assemblies in accordance with Item 680 (except for “Measurement ” and “P ayment ”) as shown on the plans. Install electrical services in accordance with Item 628 (except for “Measurement ” and “Payment ”) as shown on the plans. If the Department requires access to the signal by an advanced traffic management systems network, the Department will provide the equipment for installation by the Contractor.

3.1 Operation and Maintenance (O&M). Maintain and operate the temporary traffic signals for the duration of

the Contract. The traffic signal timing plan will be provided by the Department or local entity. Set signal timing as shown on the plans or as directed. If the Department requires access to the signal by an advanced traffic management systems network, the Department will complete the required configuration of the software and hardware after the Contractor has installed the Department -provided equipment. 930 Designate in writing a sufficiently skilled individual responsible for O&M of the temporary traffic signals who is available 24 hr. per day and in transit to the project location within 2 hr. of notification by the Engineer, unless otherwise shown on the plans. Provide backup power for each location at all times , when shown on the plans.

3.2 Reconfiguration. Reconfigure temporary traffic signals as shown on the plans and in accordance with this

Item, as directed. Reconfiguration is any change made to an installed intersection, including relocation of poles, controller, signal heads, or luminaires.

3.3 Removal . Remove all equipment installed for temporary traffic signals as shown on the plans or as directed

in writing. Completely remove poles or other supports used for temporary traffic signals. When approved, concrete foundations may remain 2 ft. or more below finished grade. Backfill the remaining hole with material equal in composition and density to the surrounding area. Replace any surfacing, such as asphalt pavement or concrete riprap, with like material to equivalent condition. Retain all removed temporary signal components, except for those furnished by the Department, unless otherwise shown on the plans .

Article 4 — Measurement

This Item will be measured by each temporary signalized intersection. A signalized intersection is a group of signals operated by a single controller.

Article 5 — Payment

The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Temporary Traffic Signals.” This price is full compensation for:  picking up and returning materials furnished by the Department;  installat ion, O&M , reconfiguration, and removal of the temporary traffic signal consisting of traffic signal pole assemblies, vehicle and pedestrian signal heads, vehicle detectors, pedestrian detectors, traffic signals, portable signals, flasher controllers, and associated equipment, signs, luminaires, ground boxes, conduit, traffic signal cables, conductors, wire strand, and electrical services;  installation and removal of foundations; and  materials, equipment, labor, tools, and incidentals. Electrical energy consumed by the Contractor on an existing Department electrical service will be paid for by the Department. Applications for a temporary utility service will designate the Contractor as the service owner unless otherwise shown on the plans. The Department will reimburse the Contractor the amount billed by the utility for utility -owned service line extensions and consumption charges, plus an additional 5% of the invoice cost will be paid for labor, equipment, administrative costs, superintendence, and profit.

Source: Texas Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, 2024 Edition. Pages 939940 of 1,034.