1.1 Section Includes
A.Acrylic waterborne pavement marking paint applied as non-temporary: pavement striping, contrast lines, and other related markings.
B.Requirements for Glass spheres or beads.
C.Application of pavement markings.
D.Removal of pavement markings.
1.3 References
A.AASHTO M 247: Glass Beads Used in Traffic Paints
B.AASHTO MP 24: Waterborne White and Yellow Traffic Paints
C.ASTM D 562: Consistency of Paints Measuring Krebs Unit (KU) Viscosity Using a Stormer-Type Viscometer
D.ASTM D 1155: Roundness of Glass Spheres
E.ASTM D 1475: Density of Liquid Coatings, Inks, and Related Products
F.ASTM D 1644: Nonvolatile Content of Varnishes
G.ASTM D 3168: Qualitative Identification of Polymers in Emulsion Paints
H.ASTM D 2805: Hiding Power of Paints by Reflectometry
I.ASTM D 3723: Pigment Content of Water-Emulsion Paints by Low- Temperature Ashing
J.ASTM D 3960: Determining Volatile Organic Compound (VOC) Content of Paints and Related Coatings Pavement Marking – Waterborne Paint
K.ASTM D 5381: X-Ray Fluorescence (XRF) Spectroscopy of Pigments and Extenders
L.ASTM E 1347: Color and Color-Difference Measurement by Tristimulus (Filter) Colorimetry
M.ASTM E 384: Microindentation Hardness of Materials
N.Environmental Protection Agency (EPA) Testing Methods
Q.Manual on Uniform Traffic Control Devices (MUTCD)
R.UDOT Materials Manual of Instruction
S.UDOT Minimum Sampling and Testing Requirements
T.UDOT Quality Management Plans
1.6 Acceptance
A.Provide fixtures such as ball valves, gate valves, or others on paint truck for the purposes of obtaining field samples
B.The Department will:
1.Allow pavement marking paint from qualified manufacturer supplied samples.
2.Sample from the applicator’s yard, at the Department’s discretion for manufacturer quality assurance.
3.Accept samples of paint from the application site for Applicator quality assurance (refer to UDOT Minimum Sampling and Testing Requirements 02765).
C.Stop all agitation before sample is drawn.
D.The Engineer will:
1.Verify quantities applied by either of the following methods:
a.Measuring both paint and bead tanks before and after application.
b.Witnessing the meter readings before and after application. 1) A printout of meter readings instead of witnessing may be accepted at the Engineer’s discretion.
E.Repaint pavement markings failing to meet bead application rates, and dimensional requirements.
F.Price Reductions
1.Price reductions for pavement markings installed below the specified wet mil thickness are outlined in Table 1. Table 1 Price Reduction for Wet Mil Thickness Pay Factor Less than 2 percent below the specified wet mil thickness 1.00 Less than10 percent below the Specified wet mil thickness 0.75 Less than15 percent below the Specified wet mil thickness 0.50 15 percent or more below the Specified wet mil thickness 0.00 * * Repaint pavement markings at the rates specified in 3.2 at no cost to the Department. Do not remove earlier application. Pavement Marking – Waterborne Paint