Effective with the December 2018 Letting 454 2019 Standard Spec ifications Section 646 Pavement Marking
646.1Description
646.2Materials
646.2.1 General
certifying that the products supp lied under the contract conform to these specifications. 646.2.2 Glass Beads
AASHTO M247, Type I, except with a minimum of 80 percent true spheres. For each batch of beads actually furnished for the work, submit a certificate of compliance certifying that beads supplied under the contract conform to these specifications.
date, and manufacturer's name and address. 646.3 Construction 646.3.1 General 646.3.1.1 General Marking Revise 646.3.1.1(1) to reinstate langua ge that prohibited removing polymer o verlay material to receive pavement marking. This change was implemented in ASP 6 effective with the December 2017 letting.
specifications as the engineer r equests. Do not mark over a mar king product with less adherence or over chipped or peeled marking. Do not remove polymer overlay materials in areas receiving pavement marking. Use only epoxy pavement marking w here the contract requires mar king placed on polymer overlays.
least one trailing vehicle. Do not use flashing arrow panels to direct traffic to pass. Equip each leading and trailing vehicle with the following:
marking train as specified for 2-way traffic in 646.3.1.1(3) except as follows: - A leading vehicle is not requi red, but use 2 tr ailing vehicles. - The contractor may use flashi ng arrow panels to direct traffi c to pass. Revise 646.3.1.1(5) to require masking over pavement marking when resealing bridge decks. This change was implemented in ASP 6 effective with the December 2017 letting.
conforming to 502.2.11 where removed from structures du ring marking surface preparati on. Seal exposed concrete including grooves for tape. Cover marking duri ng resealing with a system that will not degrade the marking's retroreflectivity when removed. Uncover marking before opening to traffic. 646.3.1.2 Liquid Marking
ends of the marking with a unifo rm cross-section. Do not damage existing marking that will remain in place.
the specified dimensions and t hat the bead application rate is consistent with the specified rate. If on any 0.5-mile section or individual special marking have a calcu lated application rate less than 90 percent of that specifie d, remove and remark this section or sp ecial marking.
marking. Apply permanent marking within 7 days of completing ma inline paving. If the roadway is closed during construction, appl y permanent marking before opening to traffic.
Effective with the December 2018 Letting 455 2019 Standard Spec ifications (4) Protect freshly applied marking until the line is dry or cured enough to prevent pic kup under traffic. Place traffic cones on wet lines immediately behind the marking train or use a convoy of moving vehicles to keep traffic from crossing the wet line. Remove cones promptly after the line dries or cures.
LIQUID MARKING PAVEMENT TYPE THICKNESS BEAD APPLICATION
Paint all 16 8-10 Epoxy SMA, seal coats, and polymer overlays 25 25 Epoxy all other 20 22.5 646.3.1.3 Cold Weather Marking Revise 646.3.1.3 to include tape; epoxy width, thickness, a nd bead rate; and proving period for cold weather marking.
below 50 F. Choose an epoxy marking compatible with field conditions when placed. Do not place permanent epoxy marking if the ambient or pavement temperature is below 35 F unless the engineer allows in writing.
from the department's APL in the exact location and width where permanent marking would be installed. Place epoxy at the mil thickne ss and the glass bead application rate specified for permanent epoxy. Maintain until weather permits permanent placement.
rate exceeds 25 percent of any section of marking. Completely remove and replace cold weather marking with permanent mar king when weather permits. The proving period for the final marking begins after replacement. 646.3.1.4 Removing Marking
item designates water blasting , the contractor may use one or a combination of air blasting, water blasting, and grinding. Provide a dust control system and remov e accumulated sand or other materials. Collect, haul, and dis pose of dust or residue from r emovals.
- If air blasting within 10 fee t of a lane open to traffic, rem ove all dust and other residue continuously while blast cleaning. - If removing existing marking be fore applying new marking, exp ose at least 90 percent of the marking surface. - If removing yellow centerline for no passing zone changes, en sure that the cycling mechanism on line removal equipment produces a uniform cycle or alternatively rem ove by hand.
ultra-high pressure pump and water tank capable of delivering a minimum of 30,000 psi and up to 40,000 psi to water jet nozzles. Provide a vacuum recovery system that contains waste water and debris to provide a clean, damp-dry surface, without a secondar y cleanup operation.
vacuum system to completely collect dust and debris. 646.3.1.5 Proving Period
the work. The engineer will, how ever, conduct post acceptance i nspections periodically during a proving period to evaluate the performance of the marking. The proving period begins on the last day of the month, for all marking pl aced within each calendar month . For paint, the proving period is 180 days. For other marking, the proving period extends through April 15 of the next calendar year or 180 days, whichever is longer. If weat her or road surf ace conditions prevent the engineer from fully evaluating the marking at the end of the proving period, the en gineer may extend the proving period.
failures due to abrasion loss at p rivate entrances and within i ntersections, except fo r roundabouts. The department defines failure as disc oloration, chipping, substrate exposure, or inadequate reflectivity. Color readings need to meet ASTM D6628 . The department measures reflectivity in the direction of travel. Failing reflectivi ty, in millicandelas/lux/m2, is defined as:
Effective with the December 2018 Letting 456 2019 Standard Spec ifications 180 DAY DRY MATERIAL COLOR RETROREFLECTIVITY Paint White < 235 Yellow < 140 Epoxy White < 250 Yellow < 160 Permanent Tape White < 525 Yellow < 380
the engineer deems impr operly constructed . If post-acceptance i nspections uncover evidence of defective material or improper construction, the department may revoke acceptance under 105.11.2.3 . 646.3.2 Long Line Marking 646.3.2.1 General
marking, mark the beginning and e nd of all existing centerlines . After completing the resurfacing, accurately re-mark the centerlines. 646.3.2.2 Liquid Marking Equipment
dimension. Ensure the equipment can do the following: - Applies lines both on the le ft and right sides, not necessarily simultaneously. - Applies 2 lines simultaneously, with either line in a solid o r intermittent pattern, in yellow or white. - Reports a daily-accumulated in stalled length for each gun. - Reports a volume of paint used each day.
646.3.2.3 Grooving 646.3.2.3.1 General
PRODUCT GROOVED DEPTH Grooved Wet Reflective Epoxy 80 +/- 10 mils Grooved Tape 120 +/- 10 mils
segment. Achieve straight alignment with the grooving equipment , not to exceed a 3/8 inch variation in any 40-foot section of travelled way. Use a high-pressure air b lower to clean the groove.
24 hours before cleaning. Before applying the marking, ensure t hat the groove surface is clean and dry.
integrity of the asphalt pavement is inadequate to support grooving operations. 646.3.2.3.2 Wet Reflective Epoxy
double drop system of 5.3 pounds p er gallon of wet reflective e lements with 18-22 pounds per gallon of the following gradation: US MESH PERCENT PASSING 18 65 - 80 30 30 - 50 50 0 - 5
Effective with the December 2018 Letting 457 2019 Standard Spec ifications 646.3.2.4 Contrast Marking Revise 646.3.2.4(1) to no longer require the application of black aggregate on black epoxy.
is not required on the ends. Appl y epoxy at a wet mil thickness of 20. Do not apply glass beads to black epoxy. 646.3.2.5 Permanent Same Day Marking
the final surface is placed or on the same day existing marking is removed. If weat her or pavement conditions prohibit same-day app lications, delineate the travel lanes and provide no-passing signing as the engineer directs. Apply c enterlines as soon as conditions allow. The engineer may restrict operations until this marking is completed.
Remove temporary marking before pl acing same day permanent marking. 646.3.3 Special Marking
plans show. Also apply edge lines, lane lines, and centerlines adjacent to the railroad crossing.
the engineer at least one week before marking so the State Patr ol can provide exact locations.
646.4Measurement
completed and as follows: - The department will measure the Marking Yield Line bid items as each individual triangle in the yield line.
completed.
completed.
- Marking Removal Lines bid ite ms by the linear foot of line ac ceptably completed. - Marking Removal Special Marki ng bid items as each individual arrow, symbol, or word acceptably removed. The department will coun t removing an RXR symbol as 3 individual symbol removals. Revise 646.4(5) specify measurement of the co ld weather bid items previously in STSP 646-010.
acceptably placed, maintained, and removed. The department will not measure work under these bid items as follows: - If the contractor fails to maintai n and remove the initial marking as required in 646.3.1.3(2) . - If initial marking is placed on d ays when the department is assessing liquidated damages.
646.5Payment
Revise 646.5 to add payment for Cold Weather Marking Epo xy 4-Inch and 8-Inch bid items previously in STSP 646-01. 646.5.1 General
items. ITEM NUMBER DESCRIPTION UNIT
646.1000 - 1020 Marking Line (material) 4-Inch LF
21 - 1999 Marking Line Grooved (material/type) 4-Inch LF
646.3000 - 3020 Marking Line (material) 8-Inch LF
21 - 3999 Marking Line Grooved (material/type) 8-Inch LF
646.4500 - 4699 Marking Line Sam e Day (material) (width) LF
646.5000 - 5099 Marking Arrow (material) EACH
646.5100 - 5199 Marking Word (material) EACH
646.5200 - 5299 Marking Symbol (material) EACH
646.5300 - 5399 Marking Railroad Crossing (material) EACH
646.5400 - 5499 Marking Aerial E nforcement Bar (material) EACH
Effective with the December 2018 Letting 458 2019 Standard Spec ifications 646.5500 - 5599 Marking Outfall (material) EACH
646.6000 - 6199 Marking Stop Line (material) (width) LF
646.6200 - 6299 Marking Yield Line (material) 18-Inch EACH
646.6300 - 6399 Marking Dotted Ex tension (material) 18-inch LF
646.6400 - 6499 Cold Weather Marking Epoxy (width) LF
646.7000 - 7199 Marking Diagonal (material) (width) LF
646.7200 - 7399 Marking Chev ron (material) 24-inch LF
646.7400 - 7599 Marking Crosswalk (material/type) (width) LF
646.8000 - 8099 Marking Corru gated Median (material) SF
646.8100 - 8199 Marking Curb (material) LF
646.8200 - 8299 Marking Island Nose (material) EACH
646.8300 - 8399 Marking Parking Stall (material) LF
646.9000 - 9299 Marking Removal Line (method) (width) LF
646.9300 - 9399 Marking Removal Special Marking (method) EACH
646.9400 - 9499 Marking Removal Plowable Raised Pavement Marker EACH
and for resealing areas of clear protective surface treatments on structures.
temporary marking installed under the contractor option of same -day marking.
resealing areas of clear protective surface treatments on structures. 646.5.2 Cold Weather Marking
marking including maintenance and removal. If the associated Cold Weather Marking bid item is not in the contract, the department will pay for the initial marking, maintenance, and removal as extra work.
Effective with the December 2018 Letting 459 2019 Standard Spec ifications Section 648 Locating No-passing Zones
648.1Description
independently from existing no-passing zones.
648.2Materials
and black on concrete. 648.3 Construction 648.3.1 Equipment
bars with 360 degree visibility, and distance measuring instrum ents (DMI). Ensure that DMI have an accuracy of at least 10 foot per m ile and decrease the measured distance when the vehicle backs up.
appears and disappe ars. Ensure that the obs erver's eye in the t railing vehicle is 42 inches above the roadway. 648.3.2 Locating No-Passing Zones
described in 3-2-2 of the departm ent's traffic guidelines manua l. Do not allow the line-of-sight to extend outside the shoulder and ensure that there are no blind spots within the required sight distance.
500 feet long, extend the zone to 500 feet by lengthening at it s beginning in each traffic direction. Conform to the no-passing zone sight distance requirements as follows: NO-PASSING ZONE MINIMUM DISTANCE[1] POSTED SPEED LIMIT SIGHT DISTANCE BETWEEN ZONES 25 - 30 mph 0.10 miles/528 feet 0.10 miles/528 feet 35 - 40 mph 0.13 miles/686 feet 0.10 miles/528 feet 45 - 50 mph 0.16 miles/845 feet 0.13 miles/686 feet 55 mph see[2] 0.15 miles/792 feet [1] If the distance between 2 succe ssive no-passing zones is less than the minimum distance between zones, connect the 2 zones. [2] The no-passing zone sight distanc e is specified in the special provisions.
following:
otherwise, use state trunk highway criteria to locate no-passin g zones on county trunk highways and local roads on the detour route. Base the locations on posted d etour speed limits.
locations. Check with the engineer before beginning work to determine if there are special no-passing zones to mark under the contract.
minimum distance between zones and sight distance are correct. 648.3.3 No-Passing Zone Marks
T's one foot by one foot with at least a 2-inch wide line with a 3 to 4 inch diameter dot on the centerline adjacent to the T stem.