Effective with the December 2018 Letting 310 2019 Standard Spec ifications Section 525 Corrugated Aluminum Culverts
525.1Description
525.2Materials
525.3Construction
material approximately 1/16 inch thick between the pipe and the endwall at the joint. The contractor may use one or more of the following: - Asphalt impregnated fabric. - A sheet plastic. - A rubber gasket. - Other non-degradable material of substantial strength.
525.4Measurement
pipe in 520.4 and the Apron Endwalls bid ite ms acceptably completed as speci fied for apron endwalls in 520.4 .
525.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
525.0100 - 0299 Culvert Pipe Co rrugated Aluminum (size) LF
525.0300 - 0399 Apron Endwalls fo r Culvert Pipe Aluminum (size) EACH
- Pipe and apron endwalls bid items. - Cast-in-place concrete and alternate endwall installations. - Water for compacti on and dust control. - Excavation and foundation ba ckfill at depths greater than 6 i nches below the culvert.
Effective with the December 2018 Letting 311 2019 Standard Spec ifications Section 526 Temporary Structures
526.1Description
the width specified and of t he necessary waterway area.
526.2Materials
if they are sound and suitable for the purpose intended.
526.3Construction
526.3.1 Permits and Coordination
issuing agency in securing the permits and complying with the t erms of the permits. 526.3.2 Design
all temporary structures. Submit one copy of plans to place on file. If the engineer r equests, submit 2 extra copies of plans for review before ordering materials or s tarting construction.
flow during use. The basic desig n criteria shall provide for a 5-year frequency storm with 6 inches of backwater. The plans shall show the minimum bridge length between abutment sheet piling, and the resultant five-year frequency high water elevation. Determine t he minimum low superstructure elevation using the given high water elevation and considering local conditions. The structure shall have the minimum roadway width sp ecified in the special provisi ons as measured between the faces of the railings or curbs, and at right angles to the centerline . Provide vertical abutments designed to prevent spilling fill material i nto the stream. If building a temporary crossing over a stream or lake subject to boating use, constru ct it to provide horizontal and vertical clearance, as the jurisdictional agency may require, adequate for row boats and small power boats.
Construction Specifications, Article 3.5. Design rail and posts according to the WisDOT Bridge Manual, chapter 30. 526.3.3 Temporary Structures
backfill conforming to 210.2 .
department’s structure inspection manual before opening to traf fic. Perform additional inspections, as the department’s structure inspection manual requires, based on structure type and time in service. Submit inspection reports on department form DT2007 to the engineer and electronic copies to the department's bureau of structures maintenance section. Ensure t hat a department-certified active team leader, listed online in the department's highway structures information system, performs the inspections.
directs otherwise, completely re move and dispose of as specifie d in 203.3.4 . Contractor-furnished materials remain the contract or's property upon removal.
526.4Measurement
structure accept ably completed.
526.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
526.0100 Temporary Structure (station) LS
structure including design and construction; for backfilling with structure backfill; for maintaining; and for removing when no longer needed.