Effective with the December 2018 Letting 312 2019 Standard Spec ifications Section 527 Structural Plate Pipe and Pipe Arches
527.2 Materials
1.Furnish structural plate pipe o r structural plate pipe arches fabricated from zinc coated corrugated steel or aluminum alloy structur al plates unless the contract s pecifies otherwise.
2.Furnish erection bolts and zinc coated corrugated steel plate conforming to AASHTO M167.
3.Furnish erection bolts and aluminum alloy structural plate con forming to AASHTO M219, except do not use aluminum bolts and nuts.
4.Furnish plates of the thicknes s the plans show or the contract specifies.
5.Furnish pipe arches, for a desi gnated span width, conforming t o the span and rise dimensions, and the radii of curvatures the contract designates.
6.Unless the contract specify otherwise, furnish structural plat e pipe and pipe arches with square ends.
7.Repair damaged spelter coating according to AASHTO M167.
527.3.1 1 Description of Plates
1.Plates shall consist of zinc c oated corrugated steel or alumin um alloy structural units. Use the manufacturer’s standard plate wi dth and length for the size structure specified, and stagger the joints either circumferentially or longi tudinally. Measure plate width circumferentially, or parallel to the highway centerline. Plates sha ll include an approximately 2-inc h lip beyond each end crest, resulting in the given structure’s actual length being approximately 4 inche s longer than the nominal length, except if skewed or beveled. Connect the plates at longitudinal and circumferential seams by bolts.
2.Provide the radius of curvature the plans show.
527.3.1 2 Forming and Punching Plates
1.Curve each plate to the proper radius and punch the bolt holes so all plates curved to the same radius, except end plates, are interchangeable during erection.
2.Place bolt holes along those plate edges that form longitudina l seams in rows 2 inches apart, with one row in the valley and one in t he crest of the corrugations. Sta gger the bolt holes between crest and valley for steel plates.
3.Space the bolt holes along thos e plate edges that form the cir cumferential seams in the finished structure approximately 10 inches.
4.Place the center of the hole no closer to the plate edge than 1 3/4 times the diameter of the bolt.
5.Punch the bolt holes in steel pl ates 3/16 inch to 9/32 inch in thickness, inclusive, before zinc coating the plates.
6.If the completed structure is a circular pipe, curve the plate s so that if bolted together they form true circles of the required diameters.
7.Cut plates for forming skewed or sloped ends to produce the angle of skew or slope specified. Keep burned edges free from oxide and burrs. Place legible identification numerals on eac h plate part to designate its proper position in the finished structure. 527.3.2 Erection
1.If erecting a pipe or pipe arch structure in a trench, make the trench a sufficient w idth to allow thorough backfill compaction.
2.Bed the pipe or pipe arch in an earth foundation of uniform de nsity, carefully shaped by a template supported at the spec ified grade to fit the lower plates of the structure. If rock, in either ledge or boulder form is encountered, remove it below grade and replace with foundation backfill conforming to
520.2 to provide compacted bedding of a thickness of not less than 1 /2 inch for every foot of fill above
the structure, with a minimum a llowable thickness of 8 inches. If there is no stab le foundation at the grade established, remove and r eplace unstable soil under the s tructure and for a width of at least one diameter on each side of the structure with foundation backfill , and compact to provide adequate support for the structure, unless the plans or special provisio ns specify other special construction methods.
3.Provide the camber the plans show or the engineer specifies in the foundation bed for a pipe or pipe arch. Effective with the December 2018 Letting 313 2019 Standard Spec ifications (4) After placing all the plates, tighten all bolts to a torque va lue between 100 foot-pounds and 300 foot- pounds inclusive. Tighten all bolts before starting backfilling .
527.3.3 Backfilling Pipe and Pipe Arches
1.Backfill with structure backfill conforming to 210.2 . 2.After assembling the pipe or pipe arch, deposit backfill mater ial evenly on both sides of the pipe or pipe arch in layers not greater than 6 inches until at least 3/ 4 of the depth is backfilled. Ensure thorough backfill comp action at the haunches of pipe arches and between the pipe or pipe arch and the sides of the trench, or for a distance each side of the pip e or pipe arch equal to the diameter of the pipe or pipe arch. Place the re maining 1/4 depth of fill to the top of structure equally on each side of the structure in layers not greater than 12 inches.
3.Under the engineer’s supervision, construct an earth cover ove r the structure before driving heavy construction equipment over it.
527.3.5 Defective Work
1.The department may reject work co ntaining one or more of the f ollowing defects: Elliptical shaping, unless specified. Uneven laps. Variation from a straight centerline. Ragged edges. Loose, unevenly lined, or spac ed bolts. Illegible brand. Bruised, scaled, or broken spelte r coating. Dents or bends in t he metal.
530.5 Payment
1.The department will pay for measured quantities at the contrac t unit price under the following bid items: ITEM NUMBER DESCRIPTION UNIT 530.0100 - 0299 Culvert Pipe Corrugated Polyethylene (size) LF 530.1100 - 1299 Culvert Pipe Corru gated Polypropylene (size) LF
2.The department will pay for the wo rk under this section as spe cified in 520.5 as follows: - Pipe bid items. - Cast-in-place concrete and alte rnate endwall installations. - Water for compacti on and dust control. - Excavation and foundation ba ckfill at depths greater than 6 i nches below the culvert. 3.The department pay separately fo r steel apron endwalls, sloped steel endwalls for cross drains, or sloped steel apron endwalls under the appropriate 521 bid items; and for aluminum apron endwalls under the appropriate 525 bid items.