Effective with the December 2018 Letting 415 2019 Standard Spec ifications Section 634 Wood and Tubular Steel Sign Posts
634.1Description
634.2Materials
634.2.1 Wood
having 4 sides surfaced (S4S). U se either beam and stringer gra de or structural joist and plank grade material with a minimum stress grade rating of 1200 fb at 19 pe rcent maximum moisture.
634.2.2 (Vacant) 634.2.3 (Vacant) 634.2.4 (Vacant) 634.2.5 Tubular Steel 634.2.5.1 General
A1011, grade 50 with an average minimu m yield strength, after cold-f orming, of 55,000 psi. Punch holes on all 4 sides for the fu ll length as the plans show. Pro vide corner radii of approximately 5/32 inches and conform to other dim ensions and tolerances as follows: TABLE 634-1 TUBULAR POST DIMENSIONS AND TOLERANCES[1]
COMPONENT OUTSIDE DIMENSIONS inches OUTSIDE DIMENSION TOLERANCE inches ALLOWABLE TWIST[2] inches/3 feet UPPER TUBE 2.00 x 2.00 +/-0.008 +/-0.062 INSIDE ANCHOR TUBE 2.25 x 2.25 +/-0.010 +/-0.062 OUTSIDE ANCHOR TUBE 2.50 x 2.50 +/-0.010 +/-0.075 [1] Measure at least 2 inches from the ends of the tubes. [2] Hold one side on a flat surface plate and measure the twist at the corner 3 feet away.
cold-galvanized organic zinc pai nt as manufacturer recommends.
together without damaging the coatings. Replace scratched or otherwise damaged components at no expense to the department. 634.2.5.2 Upper Tube
and phosphate before painting with an acrylic paint using an electrodeposition process followed by baking. 634.2.5.3 Anchor System
3-inch, grade 5 zinc plated bolt and nut. Ensure the holes of t he 2 tubes match. For installations in poured concrete use an 18-inch inner tube and an 18-inch outer tube with no soil stabilization fins. For other installations use a 36-inch inner tube and an 18-inch out er tube with soil stabilization fins.
634.3Construction
install sign posts until the finished grade is established.
true vertical position. Orients ign posts as the plan details show to ensure that pos ts will yield or break on impact as designed. For installations in concrete or asphalt, use box-outs as the plan details show.
Effective with the December 2018 Letting 416 2019 Standard Spec ifications (3) Excavate holes for wood posts to the depths and at the locatio ns the plans show or the engineer directs. Backfill with excavated material placed and compacted in 6-inch layers. Do not paint wood posts.
cut steel post surfaces after inst allation with cold-galvanized organic zinc paint according to the paint manufacturer's instructions.
634.4Measurement
including each section and anchor, acceptably completed.
634.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
634.0400 - 0699 Posts Wood (size) (length) EACH
634.0800 - 0899 Posts TubularS teel (size) (length) EACH
posts; for excavating and backfilli ng post holes; and for removing and disposing of surplus material.
the posts; treating cut post ends; a nd providing hardware and a nchors. The department will not pay for replacing damaged posts or upper tube cut-offs.
Effective with the December 2018 Letting 417 2019 Standard Spec ifications Section 635 Structural Steel Sign Supports
635.1Description
635.2Materials
stubs according to ASTM A123 after completing cutting, drilli ng, punching, and welding. Fur nish mill inspection and testing certifications for posts and stubs confo rming to 506.3.21 .
washers all hot-dip galvanized according to ASTM A153 supplemented by ASTM F2329.
635.3Construction
635.3.1 Structural Steel Sign Supports
concrete footings conforming to 636.
the plan details specify. Use a c alibrated torque wrench to establish the final required torque.
cuts and other areas of damaged zinc coating with 2 coats of zi nc dust/zinc oxide paint. Clean damaged and adjacent areas by sanding, scraping, chipping, or wire brushing before painting.
1.1, Structural Welding Code - Steel. Do not weld in the field without the engineer's written approval. The engineer will only allow field welding for repairs in noncr itical locations and when a department- approved individual competent to perform inspections is present during the welding. Perform field welding using personnel qualified under AWS D 1.5, Bridge Weldi ng Code. 635.3.2 Replacing Base Connection Bolts
details. Repair or replace existing posts, base plates, and stiffener plates damaged during bolt replacement.
635.4Measurement
measured using the pay weights the plan details show.
location acceptably completed.
635.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
635.0200 Sign Supports Structural Steel HS LB
635.0300 Sign Supports Replacing Base Connection Bolts EACH
including base connection bolts , nuts, and washers. The departm ent will pay separately for concrete footings under 636.5 and for signs under 637.5 .
bolts for each contract designated sign; and for repairing dama ge done during bolt replacement.