Deck permit checklist — Chicago, Illinois

Assembled from Chicago’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Chicago requires a permit for a deck.

When a permit is not required

A permit is not required to paint or power wash a porch, deck, or balcony. Where the building has not received a building code violation, a permit is not required to replace a non-structural element such as a deck board, stair tread, or railing picket in kind. In a residential building up to four stories, or an associated accessory building, a permit is not required to repair or replace in kind an entire exterior porch, deck, or stair system that is no more than 6 feet above the ground and has a landing area of 50 square feet or less.

What Chicago publishes for this permit

  • 6 submittal documents to include with the application
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Chicago's documents on October 1, 2026

Loading the full checklist…

Sources

Other permits Chicago publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Chicago permit requirementsChicago permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Chicago before you build.

Deck permit checklist — Chicago, Illinois | BuildSpec