B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

IllinoisChicago

Shed permit checklist — Chicago, Illinois

Assembled from Chicago’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Chicago requires a permit for a shed.

When a permit is not required

A permit is not required for a single-story detached structure no more than 15 feet above the ground, without plumbing, used as a tool or storage shed, open gazebo, playhouse, or similar structure, or built purely for decoration, provided its footprint is 150 square feet or less. Exemptions may not apply to properties designated as Chicago Landmarks.

Loading the full checklist…

Sources

Other permits Chicago publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Chicago permit requirementsChicago permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Chicago before you build.

Shed permit checklist — Chicago, Illinois | BuildSpec