935.1General Description
This work includes the installation of fiber optic cable and equipment including but not limited to cable, interconnect, patch cords, FDC interconnect cables/pig tails, any cable related hardware, connectors, splices, closures, temporary systems, testing, training, or any other fiber optic product as specified on the plans, or noted in any other Section of these specifications. Provide all equipment and materials of like kind and function to be of the exact same manufacture, model, revision, firmware, etc. Provide all equipment, materials, and work in accordance with all manufacturers’ recommendations. 935.1.01 Definitions General Provisions 101 through 150. 935.1.02 Related References
Ensure fiber optic cable and equipment meet the requirements in the following documents:
Graded Index Multimode Optical Fibers, Current Edition
Low Water Peak, Current Edition
7 CFR 1755.900, Current Edition
optic connector type (i.e., ST, SC, LC, etc.), Current Edition
1879
Manual (TDMM), Current Edition
Construction and Testing”, Current Edition
– Type Equipment, Current Edition
Plant 935.1.03 Submittals Prior to any work, obtain approval from the Engineer for the products and procedures to be used on the Project. Use only equipment and materials that meet the requirements of these minimum specifications and are on the Department’s Qualified Products List (QPL) Products appearing on the Qualified Products List (QPL) are exempt from normal submittal requirements. These products have been evaluated by the Office of Traffic Operations and have proven their capability of meeting the appropriate Georgia Department of Transportation Specification. Any of these products may be used without submitting catalogue cuts, sampling or pre-testing. The Contractor shall submit a letter to the Engineer, stating which QPL items they will use. The Engineer and/or department designee must ascertain that the construction item is the same material identified on the appropriate QPL and will acknowledge receipt of these items in the project diary or as required by the Construction Manual. Submit submittal data for test procedures, and routine maintenance procedures required for the items furnished under this specification within sixty (60) calendar days after the Notice to Proceed and prior to any installation, unless noted otherwise in the Contract Documents. Submit to the Engineer service and maintenance documentation for each item furnished under this specification. Provide two (2) bound hard copies and an electronic copy as pdf documents.
Prior to installing any fiber optic cable on the Project, provide detailed information for the cable type, cable manufacturer, fiber content, design and installation procedure to the Engineer. Request approval by certification from an independent testing (third party) laboratory that certifies the fiber optic cable is the same as that on the Department’s QPL.
Provide certification from an independent testing laboratory that certifies that the splice closures are identical to those on the Department’s QPL. 1880
Provide certification from an independent testing laboratory that certifies that the Fiber Distribution Centers provided are identical to those on the Department’s QPL
Within 60 days from the NTP, provide the date, time and location of any tests required by this specification (see 935.3.06) to the Engineer at least 72 hours before performing the test. Provide two copies of documentation of the test results to the Engineer within 5 working days of completion of the test for review and approval, or else retest the represented fiber optic cable and provide the documentation within 5 working days of the retest. Bind the test documentation and include the following:
• Total Fiber Trace distance in kilometers • Splice Loss attenuation in dB per km • Events > 0.01 dB • Trace analysis detailing all events exceeding 0.01 dB Provide OTDR traces meeting Telcordia GR-196-CORE (Issue 2) data format requirements. With advance approval by the Engineer, an alternative format may be used, providing a licensed copy of the software is provided to the Department at no additional cost to the Department. Provide all traces in electronic format to the Engineer. At a minimum, ensure the data includes: cable ID, fiber number, buffer tube, FDC port, fiber distance, test wave length, attenuation in dB per km. Obtain data requirements for each project from the Engineer.
• Perform this test on each fiber link using test procedures described in document EIA/TIA 526 sections 7 & 14A. • For each test, document length, number and type of splices and connectors • For each test, document link attenuation • Provide test data to the Engineer in Excel or compatible spreadsheet form and on a CD. 1881
The as-built documentation shall meet all requirements in the Section 940 specifications. In addition to those requirements, the as-built documents shall include final splicing and fiber allocation details for every splice location.
935.2Materials
Furnish and install all fiber optic parts, materials, components, and equipment consistent and compliant with the latest version or edition of the standards and industry practices specified in Section 935.1.02.B. If a conflict of difference exists between the requirements contained in the specified standards and practices and the requirements contained in these Specifications, use the most stringent material requirement for this contract. Notify the Engineer of any such conflicts or differences prior to procurement of materials and components.
Ensure all fiber optic related products conform to this specification. Install, apply, inspect, and use those products in accordance with the manufacturer’s standard operating and installation procedures and this Specification. Ensure optical fiber used in both outside and inside plant cable conforms to the requirements specified herein as well as the industry standards and practices listed in Section 935.1.02. Ensure all fiber optic cable on this project comes from a currently ISO9001 certified manufacturer who is regularly engaged in the production of this material using the processes noted within this Specification. All outside plant fiber optic cable used on each individual project shall be from only one manufacturer and manufacturer production batch. Use only cable that is new (manufactured no more than eight months prior to the project Notice to Proceed) and of current design and manufacture. Ensure that single mode optical fiber used in cables meets EIA/TIA 492CAAB, Detail Specification for Class IVa Dispersion-Unshifted Single-mode Optical Fibers with Low Water Peak, Current Edition, and ITU-T G.652D, Transmission Media Characteristics, Recommendations G.650-G.659, for single-mode fibers Ensure that all optical fibers in the cable are usable fibers. The fiber optic cable type, configuration, and installation method will be detailed on the Plans, Drawings, Details, Specifications and in the pay items. Ensure cable and cable installation conforms to all requirements within the Plans and Specifications.
This section sets forth the general standards for fabrication and design of outside plant fiber optic cable.
Agriculture Rural Utilities Service (RUS) as meeting the requirements of 7 CFR 1755.900. Only use optical fibers that are placed inside a loose gel-free buffer tube.
otherwise. Ensure fibers cannot adhere to the inside of the buffer tube. Ensure the fibers utilize dry water- blocking materials and construction. Ensure the fiber optic cable includes loose buffer tubes that isolate internal optical fibers from outside forces and provides protection from outside forces and provide protection from physical damage as well as water ingress and migration.
nutritive to fungus, electrically non-conductive and homogenous.
prevent buckling of the cable. Use high tensile strength aramid, fiberglass, or a combination of aramid
and fiberglass yarns to provide tensile strength. 1882
thickness is 0.06 in. (1.5 mm). Apply jacketing material directly over the tensile strength members and
water-blocking compound. Ensure the polyethylene contains sufficient carbon black to provide ultraviolet
light protection and prevent the growth of fungus.
markings are within -0/+1% of the actual cable length.
character heights of approximately 0.10 in. (2.5 mm).
member using the reverse oscillation, or “SZ”, stranding process.
Ensure all OSP cable meets or exceeds the requirements of the Fiber Optic Test Procedure (FOTP) criteria
referenced in 7 CFR 1755.900. Upon the request of the Department, provide certification from an independent
testing laboratory certifying the cable conforms to the specifications and test procedures.
installation (short term) and 200 lbf (890 N) installed (long term).
operating temperatures of -30 °F to +158 °F (-34 °C to +70 °C). Provide only OSP cable designed to
endure exposure to installation temperatures of -20 °F to +140 °F (-30 °C to +60 °C).
This section sets forth the general standards for fabrication and design of inside plant fiber optic cable.
non-toxic, non-irritant talc is applied to the yarn to allow the yarns to be easily separated from the fibers
and the jacket. For all IP cables used in plenum structures, use only IP cable that meets NEC UL-910
requirements for plenum rated cables.
imperfections. Ensure the jacket is smooth, as is consistent with the best commercial practice. Ensure the
jacket provides the cable with a tough, flexible, protective coating, able to withstand the stresses
expected in installation and service.
1883
under each cable jacket. Ensure that a non-toxic, non-irritant talc is applied to the aramid/fiberglass yarns
to allow the yarns to be easily separated from the fibers and the jacket.
while meeting the mechanical, flammability, and environmental test requirements of this document over
the life of the cable.
B Optical Fiber Cable Color Coding as stated in 935.2.B.1.e.
number, date of manufacture, fiber type, flame rating, UL symbol, and sequential length marking (e.g.
62.5/125 MICRON Type OFNR - UL). Use print color that contrasts to the color of the jacket and is
permanent and legible for the life of the cable.
with the actual electronic devices. Fabricate interconnect cable by surrounding the 900 μm tight buffered
fibers with layered U.S. manufactured aramid yarns and a jacket of PVC or Copolymer depending on NEC
requirements. Use the aramid yarns as tensile strength members.
OSP cable end, routing that cable within an FDC and its splice cabinet, and connecting to the termination
panels of the FDC. Construct FDC interconnect cable of 900 μm tight buffered fiber (single mode or
multi-mode optical fiber) surrounded with U.S. manufactured aramid fibers, and jacketed with flame
retardant jacket material. Match the fiber count and buffer tube configuration of the FDC interconnect
cable to be exactly equivalent to the OSP cable being terminated in the FDC, unless additional fibers
(using other buffer tube colors) are required for an FDC that is larger than the OP cable. Use a yellow
exterior jacket for the FDC interconnect cable for single-mode.
°C to +70 °C) while stored on the original shipping reel. Ensure riser cables are designed to endure an
operating temperature range of 0 °F to +158 °F (-18 °C to +70 °C). Ensure plenum cables are designed to
endure an operating temperature range of 32° F to +160° F (0 °C to 71 °C).
over the length of the compressive plate. Use only cable that has been tested in accordance with FOTP-
41, Compressive Loading Resistance of Fiber Optic Cables.
accordance with FOTP-25, Repeated Impact Testing of Fiber Optic Cables and Cable Assemblies.
pass UL-1666. Use only Plenum cables (OFNP) that pass UL-910. 1884
Use patch cords consisting of a length of fiber optic cable terminated on both ends. For all IP cables used in
plenum structures, use only IP cable that meets NEC UL-910 requirements for plenum rated cables.
fiber specifications stated in these Specifications.
for one leg of the duplex cord (non-printed zip leg) and red for the opposite leg (printed zip leg) of the
duplex cord.
connectorized end.
connectors. Attach the tag to one end of each pair within the assembly.
submitted manufacturer's part number.
terminated on one end. Use only FDC interconnect cables/pig tails with factory installed connectors in
accordance with Subsection 935.2.F. Provide FDC interconnect cables/pig tails with 900 micron tubing or
3 mm fan out tubing as required for the application. Use FDC interconnect cables/pig tails with 900
micron tubing only when fully enclosed within an FDC. Ensure that the other end of the cable is properly
prepared for splicing to another cable. Provide FDC interconnect cable/pig tail in conformity with the
same construction and testing requirements as patch cords.
Drop cable assembly is defined as a connectorized fiber optic cable (drop cable) and appropriate fan out (if
required) used for connectivity between a primary fiber trunk or feeder cable and field devices such as signal
controllers, closed circuit television cameras, video detection system cameras, changeable message signs, etc.
Provide a loose tube design drop cable in the drop cable assembly meeting the requirements for outside plant
cable as specified in Subsection 935.2.B. Provide the drop cable assembly type (multimode, single-mode or
hybrid) and fiber count specified in the plans.
Provide a drop cable assembly as specified in the plans and meeting the following requirements. Use only
drop cables that are factory pre-terminated, use splice-on factory-connectorized pigtails/FDC interconnect
cables, or are included in pre-terminated FDCs. For factory pre-terminated drop cable assemblies, label each
individual fiber with its drop cable fiber number (“1,” “2,” etc.) on a self-laminating clear overwrapping label on
the fan-out tubing within 2 in. (50 mm) of the terminating fiber connector.
design fiber optic cable, factory-installed fiber optic connectors in accordance with Subsection 935.2.F
on each drop cable fiber, and factory-assembled fan outs with 3 mm fan out tubing. 1885
fiber optic cable, fusion spliced factory-connectorized pigtails/FDC interconnect cables, in accordance
with Subsection 935.2.D and Subsection 935.2.F on each drop cable fiber.
accordance with Subsection 935.3.05.J. Additionally, secure the fan out tubing to the main cable sheath
in a hard epoxy plug transition that extends a minimum of 2.0 in (50 mm) onto the cable and 2.0 in (50
mm) onto the 3 mm tubing.
Furnish and install LC compatible connectors unless otherwise specified, Use ceramic ferrule ultra polish
connectors (UPC) for single-mode applications for all connector types. Install connectors as per manufacturer
application and recommendations, including proper termination to the outer-tubing.
Use UPC connectors rated for an operating temperature of -40 °F to +167 °F (-40 °C to +75 °C).
Use only factory-installed UPC connectors for all applications except where shown in the plans for specifically
permitted applications in accordance with 935.2.E.2. Use factory-installed UPC connectors installed with a
thermal-set heat-cured epoxy and machine polished mating face. Do not use field-installed fiber optic connectors.
Where barrel couplers are used in passive termination applications such as FDCs, use only ST compatible
ceramic-insert couplers. Use only manufacturer recommended single-mode couplers for single-mode connector
applications. Provide dust caps for both sides of couplers at all times until permanent connector installation.
Provide connectors listed below that do not exceed the maximum loss listed for each connector.
Connector Type Installation Max. Loss Typical Loss Optical Return Loss
Single-mode Factory 0.50 dB 0.25 dB >55 dB
Provide closures designed for use under the most severe conditions such as moisture, vibration, impact,
cable stress and flex temperature extremes. Ensure splice closures meet or exceed minimum physical
requirements listed in the following subsection:
one-piece high-density polyethylene dome bodies.
cable ports.
With the closure, provide all materials to accommodate the number of splices specified by the closure
size, including splice tray, storage, and organizing materials.
or multi-fiber array splices. Use splice closures having provisions for storing fiber splices in an orderly
manner, mountings for splice organizer assemblies, and space for excess or non-spliced fiber. Use splice
organizers that are re-enterable and re-sealable. 1886
that have an external pressurization port for optional pressurization.
re-entry and subsequent reassembly.
one-piece high-density polyethylene dome bodies. Provide splice closures designed for free breathing
splice protection without the use of encapsulate. Provide splice closures designed as fully assembled
weather tight closures. Ensure splice closure cable entry ends have flexible thermoplastic rubber end
seals with pre-template cable ports.
closures designed in such a way as to allow complete splice access after closure placement, without
requiring removal of the closure or electrical bonds from the cable. Provide splice closures suitable for
straight, butt or branch splices. Provide splice closures that include provisions for strain relief, both
around the cable jacket and to internal cable strength members. Provide aerial closures designed in such
a manner that shall eliminate the need for drip collars and sealing collars.
With the closure, provide all materials to accommodate the number of splices specified by the closure
size, including splice tray, storage, and organizing materials.
and fit within the space available.
The fiber organizer is a system that holds splice or organizer trays in such a way as to protect and support
cable splices within an environmentally protected area. Provide organizer trays capable of storing all common
splices; fusion and mechanical, in all configurations; butt, inline and branch (with up to four branch cables).
Ensure all trays are completely re-enterable. Ensure organizers themselves accept a minimum of four trays,
and provide bonding and grounding hardware.
Insertion Loss:
Single Mode < 0.30 dB
Operating Temperature:
-23 °F to 77 °F (-31 °C to 25 °C)
or pre-terminated FDCs in all field cabinets, including all types of ITS and traffic signal cabinets, unless
specifically excepted in the plans.
metallic construction. Use FDC interconnect cable for all OP cable terminations in rack-mount and wall-mount
FDCs unless otherwise specified in the plans. 1887
access to fiber splicing trays and fiber termination couplers. When closed, ensure swing-out drawers provide
dust-tight seals completely enclosing fiber splicing trays, fiber termination couplers, and connecting ends of
fiber patch cords connected to couplers.
termination couplers accessible behind a removable transparent plastic dust cover.
installed adjacent to the FDC. Alternately, rack-mount FDCs with splice cabinets integral to the overall FDC
enclosure but contained in a separated compartment either above or below the FDC termination couplers.
organizers, factory-connectorized pigtails/FDC interconnect cables, and ancillary materials to terminate the
number of fibers as specified by the FDC size, regardless of the cable size to be terminated as shown in the
plans. Use only FDC interconnect cables for FDCs 30-fiber and larger. Where factory pre-terminated drop
cable assemblies are permitted and to be used, do not provide splice trays.
installed fiber connectors and integral ruggedized fiber connector enclosures. Use pre-terminated FDCs of the
sizes specified in the plans. Use ruggedized fiber connector enclosures of thermally stable rigid plastic
housings fully potted with a thermally stable epoxy filling that encapsulates the drop cable fan out, fibers and
connector bodies. Use permanent labels on the enclosure with contrasting color to identify each connector
body by its associated fiber number.
couplers unless otherwise specified.
Use industry standard fiber optic snowshoes that are factory-manufactured fiber optic cable storage brackets
designed for aerial installation on messenger wire cable support spans.
935.2.01 Delivery, Storage, and Handling
Package the cable for shipment on reels. Each package shall contain only one continuous length of cable. Construct
the packaging so as to prevent damage to the cable during shipping and handling.
Seal both ends of the cable to prevent the ingress of moisture.
Attach to each reel, a weatherproof reel tag identifying the reel and cable in such a manner to ensure the
manufacturing history of the cable and the fiber can be traced by the manufacturer.
Include with each cable a cable data sheet containing the following information:
• Manufacturer name
• Cable part number
• Factory order number
• Cable length
• Factory measured attenuation of each fiber
• Bandwidth specification (where applicable)
• Index of refraction 1888
935.3Construction Requirements
Ensure all fiber optic parts, materials, components and equipment installed on this contract are consistent and
compliant with the latest version or edition of the standards and industry practices specified in Section 935.1.02.B. If a
conflict of difference exists between the requirements contained in the specified standards and practices and the
requirements contained in these Specifications, use the most stringent material requirement for this contract. Notify
the Engineer of any such conflicts or differences prior to procurement of materials and components.
935.3.01 Personnel
General Provisions 101 through 150.
935.3.02 Equipment
Furnish a portable fiber optic light source and power meter test set for testing the fiber optic cable. Provide a test set
matched, calibrated and referenced to work as a synchronized test system.
Retain ownership of this equipment.
935.3.03 Preparation
General Provisions 101 through 150.
935.3.04 Fabrication
General Provisions 101 through 150.
935.3.05 Construction
Secure from the cable manufacturer the construction and installation procedures to be used on the project.
Produce a detailed construction and installation procedure (SOP) covering all aspects of the construction and
installation process for each and all specific cable to be used on this project. Submit the SOP to the Engineer for
review and approval.
Follow all appropriate OSHA and industry standards related to safety when working in manholes or
underground vaults and when handling optical fibers.
Install all fiber optic cable according to the manufacturer’s recommended procedures and these
specifications.
Do not exceed the maximum recommended pulling tension during installation as specified by the cable
manufacturer.
Do not violate the minimum recommended bend radius during installation as specified by the cable
manufacturer. Unless the manufacturer’s recommendations are more stringent, use the following guidelines
for minimum bend radius:
20 X Cable Diameter Short Term - During Installation
10 X Cable Diameter Long Term - Installed
Before the installation begins, carefully inspect the cable reels for imperfections such as nails that might cause
damage to the cable as it is unreeled.
Take all necessary precautions to protect reeled cable from vandals or other sources of possible damage
while unattended. Any damage to the cable sections may require replacement of the entire section. 1889
Whenever unreeled cable is placed on the pavement or surface above a manhole, provide means of
preventing vehicular or pedestrian traffic through the area in accordance with Section 150 of the
specifications.
Use the "figure-eight" cable lay configuration to prevent kinking or twisting when the cable is unreeled or
backfed. Do not coil fiber optic cable in a continuous direction except for lengths of 100 ft. (30 m) or less.
When "figure-eighting" cable, exercise care to relieve pressure on the cable at the crossover of the eight. This
may be done by placing cardboard shims at the crossover or by forming a second "figure-eight".
Keep the cable continuous throughout the pull. Cable breaks are allowed only at designated splice points.
Where messenger cable is required, as shown in the plans, lash aerial fiber optic cable to a steel strand wire
messenger cable of the size specified in the plans that conforms to Georgia Department of Transportation
specification 915.02.
Where a cable ends without termination in a fiber optic closure, seal the end of the cable by re-using a cable
end cap shipped with a cable reel, or use a cap that is size-matched to the cable to be sealed. Clean the end
of the cable. Partly fill the cap with a waterproof silicone adhesive sealant and press the cap fully onto the
cable end, rotating the cap to fully encapsulate the cable end with the sealant in the cap. Apply a full sealant
bead between the end of the cap and the cable jacket.
At designated intervals throughout the cable plant, pull and store excess cable for slack for future terminations or
splicing.
Properly store all cable to minimize susceptibility to damage. Maintain proper bend radius, both short and long
term, during cable storage.
Communication and Pull Boxes: Store the excess or slack cable in the pull box or communication box in
accordance with the plans details.
Hub/TMC/TCC: Properly store the cable in cable troughs and plenum applications which meet NEC requirements.
Aerial Installations: Store the excess or slack cable at storage loops in a “bow tie” configuration on the messenger
strand using two fiber optic snowshoes (aerial fiber cable storage brackets) that maintain the proper bend radius in
the fiber cable. Install one fiber optic snowshoe for drop cable and trunk cable storage at aerial splice closures to
maintain the proper bend radius in the fiber optic cable.
In Cable Storage Requirements - Underground (OSP) & IP
Unless otherwise noted on the plans, the following are the requirements for cable storage for underground and IP
applications:
cable/closure situations.
• Drop cable with no closure – 10 ft. (3 m)
• One or more trunk cables with no closure – 110 ft. (34 m) of each cable
• Two or more trunk cables with one closure – store 55 ft. (17 m) of each trunk cable so that the closure
can be removed from the pull box approximately 55 ft. (17 m). If a drop cable is spliced to the trunk
cable at this point, store 55 ft. (17 m) of each drop cable.
• One trunk cable with one closure – 110 ft. (34 m) Install closure in the center of the 110 ft. (34 m)
cable loop, so that the closure can be removed from the ECB approximately 55 ft. (17 m). If a drop
cable is spliced to the trunk cable at this point, store 55 ft. (17 m) of each drop cable.
• One trunk cable with one closure and trunk cable ends – 95 ft. (30 m). Install closure on the trunk
cable at 55 ft. (17 m) from the pull box. If a drop cable is spliced to the trunk cable at this point, store
55 ft. (17 m) of each drop cable.
• Trunk cable ends with no closure – 95 ft. (30 m) 1890
distribution panel bay plus 20 ft. (6 m)
the indicated cable/closure situations. More than one situation may occur in a single electrical
communication box, in which case apply each appropriate requirement.
• Trunk cable with no closure – 110 ft. (34 m)
• Trunk cable with one closure – 110 ft. (34 m). Measure the storage amount from the top of the ECB
manhole opening. Install closure in the center of the 110 ft. (34 m) cable loop, so that the closure can
be removed from the ECB approximately 55 ft. (17 m). If a drop cable(s) is spliced to the trunk cable
at this point, store 55 ft. (17 m) of each drop cable.
• Trunk cable with one closure and trunk cable ends – 95 ft. (30 m). Install closure at 55 ft. (17 m) from
the ECB on the trunk cable. If a drop cable(s) is spliced to the trunk cable at this point, store 55 ft. (17
• Trunk cable ends with no closure – 95 ft. (30 m)
Unless otherwise noted on the plans, the following are the minimum requirements for cable storage for aerial
applications:
equipment drop or as shown in the plans. Where equipment drops are greater than 1000 ft (300 m) apart,
install a minimum 150 ft. (45 m) storage loop for every 1000 ft. (300 m)of uninterrupted cable length.
storage, unless otherwise noted in the plans, to allow the fully assembled closure, including the trunk
cable and drop cable, to be lowered to ground level for maintenance purposes.
Splice together each individual reel of fiber optic cable to provide the continuous length of installed cable called
for on this Project. Splice cable only at splice points designated on the plans or at locations approved by the
Engineer. Make no splices within a patch cord assembly or drop cable.
At points where mid span/drop access is required, keep all fibers intact except those being accessed for the
equipment drop. Use a suitable tool for removing fibers from the buffer tube to prevent damage to the fibers
remaining intact.
Only use procedures for the termination of the connectors meeting the process set out in that connector
manufacturer's standard operating procedure (SOP) for the field installation.
underground and aerial use. Use UV stabilized marker material and printing inks to provide an aerial
durability of at least five years. 1891
Fabricate markers from PVC base material with a minimum thickness of 0.015 in. (0.38 mm). Pre-print the
following text, or alternate text shown in the plans, legibly on markers used for all cables:
GA DOT
Optical Cable
on every cable marker with the text of the second image reversed and abutting the first image. in such a
manner to ensure the text “reads right” when either short edge of the cable marker is held horizontally
upright.
manufacturer’s recommended procedure for applying cable markers. Mark all cables in or at every
communications hub, electrical communications box, pull box, handhole, equipment cabinet, aerial or
underground splice closure, pole attachment, aerial storage bracket, and pole conduit riser entrance. At
every trunk cable termination, reel end-to-reel end splice, electrical communications box, pull box,
handhole, equipment cabinet, aerial splice closure, and aerial storage bracket, record the cable distance
markings from the printline for the cable entry and exit, along with the exact location by Station Number
or location name. Record the cable distance markings in a tabular format approved by the Engineer or on
a documentation form provided by the Department.
• within 18 in. (460 mm) of every cable entry to a pull box, handhole, ECB and hub building
• within 6 in. (150 mm) of every cable entry or termination in an equipment cabinet
• within 18 in. (460 mm) of every splice closure at cable entry points
• within 6 in. (150 mm) of every FDC or splice cabinet in a hub building in which a cable terminates or
enters
• every 20 ft. (6 m) for the length of a cable in maintenance coils in electrical communications boxes or
pull boxes
• within 12 in. (0.30 m) of every pole attachment, aerial storage bracket, and pole conduit riser entrance
markers for one leg of the trunk cable and yellow for the other leg, placing corresponding color labels at
the closure end of a leg and at the conduit entrance (underground installation) or span attachment (aerial
installation).
for the other drop cable, throughout the entire drop cable’s length to its other termination.
latest version of the manufacturer’s recommended guidelines.
guidelines. 1892
building; use a splice center where rack or wall space is available.
the splice tray or organizer manufacturer. Use splice types compatible with the tray design.
not leave bare fiber exposed.
Do not use mechanical splices for any purpose other than a temporary connection to fiber optic test
equipment. Obtain the Engineer’s prior approval for any other use of a mechanical splice.
Make all mechanical splices as strain relief/locking types requiring no adhesive or polishing of the fiber ends.
Ensure the fibers are self-aligning upon the closing of the mechanical splice. Ensure the splice consists of one
piece construction. Ensure there is no stress on the fiber in the alignment area.
Install all splice closures according to the manufacturer’s recommended guidelines.
Use a mechanical fiber optic lab splice when a temporary joining of two fibers is required, such as in the
testing of non-terminated fiber. Ensure the lab splice is re-usable for up to 50 matings. Ensure the lab splice
accommodates optical fibers with cladding diameters between 120 and 145 μm.
Install splice closures according to all manufacturers’ recommendations. Install splice closures where shown in the
plans and in the approximate center of fiber cable storage coils. Securely mount all splice closures in ECBs or pull
boxes to cable rack hooks or mounting brackets.
Provide all inside plant cable with a fan out in accordance with the manufacturer’s recommended guidelines.
cable as continuous length cable; do not splice remnant cables together. Terminate cables and patch cords
as required in the plans. Splice the cable along cable route at the points indicated in the plans.
the cabinet housing. In Type 170 traffic cabinets, mount the transceiver on an aluminum shelf permanently
attached to the EIA 19 in. cabinet rack in the rear of the cabinet.
Provide inter-cabinet and inter-bay bend radius and jumper management on each side of the FDC. Install all
hardware according to the manufacturer’s recommended procedures and Department standards. Determine
specific hardware sizing from the project documents.
left position.
cable route from the splice closure to the equipment cabinet (including but not limited to the cabinet location, 1893
all conduit and pullboxes, and the splice closure location) to determine the required length of drop cable,
including all splice closure and storage coils, to be factory manufactured with each FDC. Mount the pre-
terminated FDCs with the connectors horizontal or facing downward, and route the drop cable up or down as
necessary. Route and secure the drop cable beside or behind the cabinet side panel such that it is fully strain-
relieved, does not violate the manufacturer’s recommended bending radius, and does not interfere with the
operation of or access to any cabinet equipment or electrical components.
935.3.06 Quality Acceptance
plans and as specified below:
before equipment hookup, test all terminated fibers and spare fibers for continuity, events above 0.10 dB,
and total attenuation of the cable. In the event that fiber optic cable installed on the project is connected
to existing fiber optic cable, perform installation testing on both terminated fibers and spare fibers of the
new cable and existing fibers to which the new fibers are spliced or connected. Submit both printed and
electronic optical time domain reflectometer (OTDR) traces as specified in Subsection 935.1.03.
and optical source/power meter. The technician is directed to conduct the test using the standard
operating procedure as defined by the manufacturer of the test equipment. Use an OTDR capable of
performing standard OTDR functions, including the ability to display individual loss/gain in dB per km, as
well as display all 2-point dB loss cursors to allow isolating and viewing any and all points along a given
fiber distance.
cable. Optionally, the Technician can use a factory "fiber box" of 325 ft. (100 m) minimum with no splices
within the box.
standard power-meter test.
calibrated optical source and power meter using the standard three-stage procedure. Determine
acceptable link attenuation by the cumulative value of standard losses based on length, number and type
of splices and connectors.
cable's published production loss. Consider the error rate for the test equipment in the test.
as follows: 1894
Cable Type Max. Attenuation dB/km Test Wavelength
Singlemode 0.30 1550 nm
0.40 1310 nm
both labor and materials. Elevated attenuation due to exceeding the pulling tension during installation will
require the replacement of the cable run at no expense to the Department for either labor or materials.
when splice losses are being unfavorably affected by "mode field diameter misalignment," "core off-set"
or "core misalignment."
Ensure that the maximum splice loss for any fusion splice does not exceed 0.10 dB.
Ensure the maximum splice loss for mechanical splices does not exceed 0.70 dB. As noted in this specification,
mechanical splicing is only allowed when approved by the Engineer for temporary applications.
Test all completed and assembled pre-terminated FDCs at the point of manufacture and provide two copies of the
manufacturer test documentation. Test each connecterized fiber in the pre-terminated FDC to demonstrate
compliance with all requirements for cables and connectors as detailed in other subsections of these
specifications. Include in the test documentation the location station number where the FDC is to be installed, the
serial number of the pre-terminated FDC, the drop cable footage markings at each end of the drop cable, and the
total drop cable distance. Place one copy of the manufacturer test documentation in the equipment cabinet
drawer where the pre-terminated FDC is installed, and submit the other copy to the Engineer.
935.3.07 Contractor Warranty and Maintenance
Provide a one year manufacturer support (usual and customary warranties) period for all fiber optic cable materials
furnished and installed as part of the fiber cable system. Include in warranty and support all contractor or
manufacturer activities related to maintenance, removal and replacement of cabling, closures and other fiber optic
system materials during the period of support. Begin the Manufacturer warranty support period upon successful
completion of the Fiber Optic Quality Acceptance testing as outlined in Subsection of 935.3.06. Ensure all
Manufacturer warranties are continuous throughout the period and state that they are subject to transfer to the
Department.
935.4Measurement
Fiber optic system, temporary fiber optic system, testing and training complete, in place, accepted and of the kind,
size, and type specified is measured as follows.
Outside Plant fiber optic cable is measured for payment by the actual number of linear feet installed, complete,
functional, and accepted. Fiber optic cable shall include but is not limited to all required fiber optic connectors,
fiber optic snowshoes, marking and labeling, patch cords and other ancillary items as required for a complete fiber
optic installation.
Inside Plant fiber optic cable is measured for payment by the actual number of linear feet installed, complete,
functional, and accepted. Fiber optic cable shall include but is not limited to all required fiber optic connectors,
marking and labeling, patch cords and other ancillary items as required for a complete fiber optic installation. 1895
Underground splice closures, aerial splice closures, and FDCs are measured for payment by the actual number of
units installed, complete, functional and accepted. Closures shall include but are not limited to all required
mounting and fastening hardware, fiber optic connectors, FDC interconnect cables/pigtails, marking and labeling,
patch cords and other ancillary items as required for a complete closure installation.
Fiber optic splices, fusion, are measured for payment by the actual number of splices made, complete, and
accepted. Fiber optic splices associated with the use of factory-connectorized FDC interconnect cables/pigtails
on drop cables, in accordance with Section 935.2, will not be measured separately for payment. Mechanical
splicing for temporary applications shall be included in other work and will not be measured separately for
payment
Payment for work on the Temporary Fiber Optic System will be a lump sum project bid price and will be
considered full compensation for all installed materials and labor associated with the Temporary Fiber Optic
System. Specific items include but are not limited to timber poles, guys, anchors, lashing, messenger cable,
conduit directional boring, conduit, fiber optic cable, fusion splicing, hardware attachments, splice enclosures,
equipment rentals, and disposal of materials.
External drop and repeat transceivers and external star transceivers are measured for payment by the number
actually installed, complete, functional, and accepted.
For each unit installed, furnish and install all mounting and interconnection materials, including but not limited to
card cages, hardware, fiber and RS-232 jumper cables, RS232/485 converters, and power supply cables at no
separate cost to the Department.
935.4.02 Limits
General Provisions 101 through 150. 1896
935.5Payment
Outside and inside fiber optic cable, FDC interconnect cables/pig tails, splice closures, splices, temporary fiber optic
system, transceivers, and testing are paid for at the Contract Unit Price for the various items. All other required items
including; FDC interconnect cables/pigtails, fan-out kits, fiber optic connectors, fiber optic snowshoes, and other
ancillary items for a completed fiber optic system shall be included as part of the below pay items. No separate
payment shall be made for these items. Payment is full compensation for furnishing and installing the items complete
and in place according to this specification.
Payment for all items of this Section is as follows:
Payment will be made under:
Item No. 935 Outside Plant Fiber Optic Cable (type, mode, size) Linear Feet (Linear Meter)
Item No. 935 Inside Plant Fiber Optic Cable (type, mode, size) Linear Feet (Linear Meter)
Item No. 935 Fiber Optic Closure (type, size) Per Each
Item No. 935 Fiber Optic Closure, FDC Pre-Terminated (type, size) Per Each
Item No. 935 Fiber Optic Splice, Fusion Per Each
Item No. 935 External Transceiver (mode) Per Each
Item No. 935 External Star Transceiver (mode) Per Each
Item No. 935 Temporary Fiber Optic System Lump Sum
935.5.01 Adjustments
General Provisions 101 through 150.. 1897
- 150Traffic Control
- 639Strain Poles for Overhead Signs and Signal Assemblies
- 647Traffic Control Signal Installation
- 682Electrical Wire, Cable, And Conduit
- 939Communications and Electronic Equipment
- 940NaviGator Advanced Transportation Management System Integration
- 770Truck Weigh Station Height Checking Device
- 915Mast Arm Assemblies
Get an email when 935 changes
Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.