be measured by the square foot. The patching material used in full depth patching will not be measured for payment.
Bridge deck overlay will be measured by the square yard for the specified 870 thickness. Where there is no specified thickness shown on the plans, the specified thickness shall be 2 in. Overlay dams and patching an existing overlay will be measured by the square foot. Longitudinal grooving will be measured by the square yard. No deduction in measurement will be made for areas where grooving is terminated or not required. Epoxy resin adhesive and bond coat will not be measured for payment. Blasting, 880 cleaning, finishing, texturing other than the longitudinal grooving, and curing will not be measured for payment. 722.16 Basis of Payment Removal of the existing overlay and the additional depth into the existing deck surface will be paid for at the contract unit price per square yard of bridge deck, remove existing concrete overlay. Milling of the initial depth of surface will be paid for at the contract unit price per square yard of bridge deck, remove existing concrete surface. Additional surface 890 removal below the initial depth will be paid for at the contract unit price per square yard for bridge deck, remove existing concrete surface for each required 1/4 in. depth. Hydrodemolition of the bridge deck will be paid for at the contract unit price per square yard. When hydrodemolition is shown on the plans, additional surface preparation will be paid for at the established price shown per linear foot for bridge deck overlay, additional surface prep.
When hydrodemolition is not shown on the plans, partia l depth patching will be paid for at the contract unit price per square foot for bridge deck patching, partial 900 depth. When partial depth cavities are subsequently directed to be made full depth, additional payment will be made at 80% of the contract unit price per square foot for bridge deck patching, full depth. Full depth patching will be paid for at the contract unit price per square foot for bridge deck patching, full depth.
Bridge deck overlay will be paid for at the contract unit price per square yard, for 910 the type of overlay material specified. 722.16 792 Patching an existing bridge deck overlay will be paid for at the contract unit price per square foot for bridge deck overlay patching.
Overlay dam will be paid for at the contract unit price per square foot, complete in place. Longitudinal grooving will be paid for at the contract unit price per square yard. 920 The Department will include the pay ite m Bridge Deck Overlay Budget, with an established dollar amount in the proposal to pay for additional surface preparation completed after hydrodemolition and bridge deck overlay additional quantity used to fill irregularities and partial depth cavities. The Bridge Deck Overlay Budget amount shown in the proposal is included in the to tal bid amount. The Depa rtment will pay for the additional quantity installed to fill irregularities and partial depth cavities as directed by the Engineer. Where the material exceeds the planned overlay quantity, payment will be at the invoice cost of the additional bridge deck overlay quantity installed. An amount equal to 10% of the in voice cost will also be paid for additional disposal and all other related costs in conn ection with the additional quantity installed. 930 No additional markup shall be applied for additional bridge deck overlay quantity installed. This amount will be paid using the Bridge Deck Overlay Budget pay item.
Payment will be made under: Pay Item Pay Unit Symbol Bridge Deck Overlay Budget .................................................... DOL Bridge Deck Overlay, Latex Modified ...................................... SYS Bridge Deck Overlay, LMC-VE ................................................ SYS 940 Bridge Deck Overlay, Patching ................................................. SFT Bridge Deck Overlay, Silica Fume Modified ............................ SYS Bridge Deck, Remove Existing Concrete Overlay .................... SYS Bridge Deck, Remove Existing Concrete Surface ..................... SYS Bridge Deck Patching, Full Depth ............................................. SFT Bridge Deck Patching, Partial Depth ......................................... SFT Hydrodemolition ....................................................................... SYS Longitudinal Grooving .............................................................. SYS Overlay Dam ............................................................................. SFT 950 Item shown with an established price will be paid at the price shown. Pay Item Pay Unit Established Symbol Price
Bridge Deck Overlay, Addi tional Surface Prep...... LFT ............... $20 The cost of overlay removal by handchipping in areas adjacent to the curb or 722.16 793 otherwise inaccessible to the power-operated mechanical milling machine shall be included in the cost of bridge deck overlay, remove existing overlay. The cost of 960 disposing of overlay removal residue, includi ng water, dust, concrete and incidentals shall be included in the cost of bridge deck, remove existing overlay. The cost of deck surface preparation by ha ndchipping in areas ad jacent to the curb or otherwise inaccessible to the power-operated mechanical milling machine shall be included in the cost of bridge deck, remove existing concrete surface or bridge deck, remove existing overlay. The removal of surface milling residue, including water, dust, concrete, and incidentals shall be included in the cost of bridge deck, remove existing concrete surface or bridge deck, remove existing overlay. 970 The cost of the wastewater control and disposal plan, wastewater containment, testing, storing, transporting and disposal, and any incidentals related to the carrying out of the plan shall be included in the co st of hydrodemolition. If the wastewater is found to have a pH of 12.5 or higher and thereby classified as hazardous, the additional costs associated with this classification will be paid for in accordance with 109.05. The initial equipment calibration, any re-calibration, equipment shielding, handchipping curb areas, handchipping unsound concrete, cleaning of debris and slurry, compressed air cleaning, water blasting, and sandblasting shall be included in the cost of hydrodemolition. 980 When hydrodemolition is shown on the plans, the cost of removal of unsound concrete shall be included in the cost of hydrodemolition. Preparation of cavity surfaces, furnishing and applying bond coat or epoxy resin adhesive as required in handchipped locations, furnishing and pl acing patching material, and necessary incidentals shall be included in the cost of bridge deck overlay for the type of overlay material specified. Additional concrete re moval required around exposed bars shall be included in the cost of additional surface preparation. When hydrodemolition is not shown on the plans, the cost of removal of unsound 990 concrete, preparation of cavity surfaces, furnishing and applying bond coat or epoxy resin adhesive as required, furnishing and placing patchi ng material, and necessary incidentals shall be included in the cost of bridge deck patching, full depth, or bridge deck patching, partial depth. The cost of patching material used for full depth patching shall be included in the cost of bridge deck patching, full depth. The cost of texturing patched areas will not be paid for separately but shall be included in the cost of the patch. The cost of furnishing and placing patching material in partial depth cavities and 1000 necessary incidentals shall be included in the cost of bridge deck overlay, additional. When the project does not include the installation of a new bridge deck overlay, the cost of partial depth patching below the bottom of the overlay shall be included in 722.16 794 the cost of bridge deck overlay, patching. The cost of patching and overlay materials used to fill the cavities shall be included in the cost of bridge deck overlay, patching.
The cost of removing existing concrete, furnishing, hauling, and placing all materials including the epoxy, preparing the surface, and all necessary incidentals shall be included in the cost of overlay dam. 1010 The cost of deck cleaning shall be included in the cost of other pay items.
The cost of removing and disposing of the slurry created during the longitudinal grooving shall be included in the cost of longitudinal grooving. Coring of the bridge deck, patching core holes, and all corrective measures required in accordance with 722.12 shall be performed at no additional cost to the Department. 1020