Section 320 Section 320 Granular Material Lot Individual Class Average Test 10 94.0 90.0 7,8 or 9 95.0 91.0 5 or 6 96.0 92.0 3 or 4 97.0 93.0 1 or 2 98.0 94.0 except,
320.04 Blank .
320.05 Basis of Payment . Unless otherwise specified in the contract, no separate
payment will be made for shoulder construction. Payment will be made for the materials and their processing when set up in the contract as pay items. All additional work involved in shoulder construction is considered an obligation of the Contractor subsidiary to the placement of the materials required a nd work performed for which provisions for payment are contained in the contract. SECTION 321 - IN-GRADE PREPARATION
321.01 Description . The term "in-grade preparation" is defined as the work required to
prepare, blade, shape, scarify, disk, mi x, compact, etc. the existing material to specification requirements prior to placement of a subsequent course of material. Figure 1, Section 101, graphically defines the limits of the roadway, the design soil and the components of the pavement structure. In-grade preparation shall be in reasonable close conformity with the lines, grades, and typical section(s) shown on the plans. All work will be performed in the sequence and timing specified. No direct compensation will be allowed for in -grade preparation, except as specifically provided herein.
321.01.1 Applicability . In-grade preparation will be required on all projects that require
replacement of any component of a pavement structure or chemical treatment of the design soil. In-grade preparation will not be required on pavements or chemically treated courses that are to remain in place undisturbed. Unless otherwise specified, the in-grade preparation course shall be the top six inches of the design soil.
321.02 Blank .
321.03 Construction Requirements .
321.03.1 General . Prior to beginning in-grade preparation, the roadway will be cleaned
of all vegetation or debris, bl aded, shaped an d filled as necessary to obtain the required line, grades and typical section as shown on the plans or as specified. The Contractor will perform unclassified excavation where re quired for grade changes, removal of temporary ramps at bridge ends, shape foreslopes and cut ditches to the required line, grade and typical section, and other work required to alter work performed on previous contracts. All material obtaine d in preparation prior to in-g rade preparation work will be disposed of or utilized by the Contractor.
321.03.2 First In-Grade Course .
321.03.2 1--Design Soil . When the first in-grade preparation course is the top portion of
the design soil, which was constructed under a previous contract, the top six inches, unless a greater depth is specified, shall be broken up, either by scarifying or blading to the specified depth and then thoroughly mixed by a disk-harrow. If the embankment design soil was constructed under this contract in accordance with the requirements of Section 203, then only the cut section will require mixing as stated herein. The disk shall be of sufficient weight and size to cut a mi nimum depth of eight inches, or ten inches when eight inches design soil mixing is required, in loose material. After mixing with a disk-harrow, the roadway will be shaped and compacted to the proper section and density.
321.03.2 2--Component of Pavement Structure . When the first in-grade preparation
course is a component of the pavement structure, other than design soil, the course shall be prepared by blading, shaping to the speci fied section, and comp acting to the specified density for the particular layer being prepared.
321.03.3 Unsuitable Materials . All materials which cannot be stabilized and
compacted to the required density, shall be removed and disposed of as directed. The material removed will be replaced by acceptable materials. Unless the unsuitable material was placed under this contract, the removal, dis posal, and replacement of the material will be measured and paid for under the appropriate items of the contract. Materials that meet contract requirements, except for moisture content, will not be classified as unsuitable materials.
321.03.4 Stability . When density and stability cannot be obtained due to the instability
of the underlying material, the Contractor will take the necessary action to stabilize and compact the underlying material. Unless th e unstable material was placed under this contract, the work required to stabilize and compact the material will be paid for under the appropriate items of the contract. When the Contractor has initiated appropriate action to stabilize and compact the underlying material and density cannot be obtained, then the material will be classified as unsuitable and proceed in accordance with Subsection 321.03.3.
321.03.5 Haul, Protection and Repair . All materials hauled through or over any part
of the project shall be hauled in the sequence and manner to cause the least damage to the previously placed course. The Contractor's operations shall provide the maximum protection to each course in place from deformation or c ontamination from underlying material. The first course of material to be placed on a chemically treated design soil shall be placed by hauling to the point nearest the source of the material, thus hauling over the material being placed. Subsequent hauling shall be over the maximum practical thickness of material in order to provide the greatest protection to the underlying material. The Contractor shall satisfactorily maintain the material over which he is hauling, and the materials being hauled shall be spread as hauling progresses to prevent hauling equipment from repetitive passes alongside lines of dumped and unspread material. The Contractor shall repair, at no additional cost to the State, all damage to prepared in- grade material whether the material was placed under this contract or under previous contract.
321.03.6 Density. The required density for in-grade preparation of courses that do not
require a chemical treatment or modification shall be the required density for the particular course. The required density for courses that require chemical treatment or modification shall be 93.0 percent prior to the addition of the chemical, stabilizer or modification.
321.03.7 Tolerances .
321.03.7 1--General. It shall be understood that although certain tolerances in grade,
cross section, and density are allowable under the specifications, it shall be the Contractor's responsibility to prepare the surface of all in-gra de courses to the degree of true grade and cross section and to the densit y and stability necessary to ensure the ability to construct subsequent courses to the specified requirements for surface, thickness, and compaction. It is essential in pavement structure construction that the degree of accuracy must be increased for each succeeding course in order that the final surface requirements can be met and the thickness of each course will be within design tolerances. It shall be the Contractor's responsibility to construc t each course to the degree of accuracy, maximum allowable tolerances notwithstandi ng, necessary to ensure meeting final requirements.
321.03.7 2--Vertical Tolerances. No vertical tolerances will be allowed that will pond
water. Otherwise, allowable tolerances will be as follows:
321.03.7 2.1-For Design Soil.
Tolerances from Design Grade:
321.03.7 2.2--For Bases .
The surface tolerances from design grade be fore placing base material shall be the tolerances from design grade in place as set out herein for design soils. Grade stakes or other reference points shall be set at 25-foot intervals; when tested longitudinally, the maximum deviation when measured at the midpoint (12½ feet) shall be ±1/2 inches.
321.03.7 2.3-For Drainage Layers.
Tolerances from Design Grade: Where a drainage layer is requ ired - - In Place +1/8” to -3/8"
321.03.7 2.4--For Any Course .
Tolerances from Design Grade:
321.03.7 2.5--For Mechanical Stabilization and In-Grade Modification . Where
material is to be mechanica lly stabilized or modified with stabilizer aggregate or other materials on the roadbed, the tolerance from design grade, both before spreading the aggregate and after mechanical stabilization, shall be those as respectively set out hereinbefore with an appropriate allowance having been made in the grade prior to spreading the aggregate to compensate for anticipated bulking.
321.03.7 2.6--Thickness . Unless otherwise specified and except for chemical treatment,
mechanical stabilization, in-grade modification, and in-grade preparation of the top portion of the design soil, no thickness determination as such will be required for bases. The preceding tolerances from design grade shall determine the tolerance limits for thickness. The thickness tolerance for in-grade preparation of the top portion of design soil shall be plus or minus one inch. For chemical treat ment, mechanical stabili zation, or in-grade modification, thickness tolerances shall be those set out in the sections applicable to the required courses.
321.03.7 3--Horizontal Tolerances. Allowable horizontal tolerances for in-grade
preparation shall be those set out in the respective sections for the required courses. Where no horizontal tolerance is specified, th e tolerance for a course shall be that which will not result in an unsightly appearance or detr act from the esthetic value of the finished crown line and slope. Each course of base and shoulder materials, and combined courses of shoulder materials and the top portion of the design soil shall be shaped in such a manner that after compaction the finished course and combin ed courses shall closely conform to the widths, lines grades, and cross sections shown on the plans or established.
321.04 Method of Measurement . Unless shown as a separate pay item in the proposal,
in-grade preparation will not be measured for direct payment, but shall be considered a necessary part of the construction involved, an d the cost thereof shall be included in the appropriate contract unit prices. When shown as a separate pay item, in-grade preparation of the depth specified will be measured by the mile for each separate road way of the main facility without respect to width or number of lanes or courses involved. No separate measurement for payment will be made for frontage roads, interchanges , intersections, entrance s, or other features of the work, nor for intersecting roads unless such roads are set out under the contract as separate projects. It shall be understood that the cost of in-grade preparation for such subsidiary facilities is included in the contract unit price per mile for the main facility. In the case of in-grade preparation of materi al in place under previous contract, if it is necessary to excavate, pickup, load, and haul an y of the in-grade material for use at other locations or for disposal as directed in orde r to prepare the section in accordance with the design grade, typical sections and conditions specified, such work shall be performed and will be measured and paid for under the applicable provisions and requirements as follows:
321.05 Basis of Payment . Except as provided above, no payment will be made for in-
grade preparation. It shall be fully unders tood that compensation: for all specified scarifying, disk-harrowing, mixing, or other processing; for furnishing and applying all water; for all aerating necessary to dry wet ma terials; for all shaping and compacting; for all other work of whatever nature necessary fo r preparation as set forth under this section; and for furnishing all labor, tools, equipment and incidentals necessary to complete the work shall be included in the unit prices for the materials used and the work performed under contract items. When shown as a separate pay item in the contract, in-grade preparation will be paid for at the contract unit price per mile, which price shall be full compensation for satisfactorily completing the work. Payment will be made under: 321-A: ___" In-Grade Preparation - per mile
Division 400 — Division 400
Division 400 — Bituminous Pavements
SECTION 401 - ASPHALT PAVEMENT -- GENERAL
401.01 Description . These specifications include general requirements that are
applicable to all types of asphalt whether producing Hot Mix Asphalt (HMA) mixtures or Warm Mix Asphalt (WMA) mixtures. These specifications also include the specific requirements for each particular mixture when deviations from the general requirements are necessary. This work consists of the construction of one or more lifts of asphalt pavement in accordance with these specifications and the sp ecific requirements for the mixture to be produced and in reasonably close conformity with the lines, grades, thicknesses and typical sections shown on the plans or established by the Engineer.
401.01.1 Definitions.
Maximum Sieve Size - Maximum sieve size is the sm allest sieve size at which 100 percent of the aggregate passes. Nominal Maximum Sieve Size - The nominal maximum sieve size is one sieve size larger than the first sieve to retain more than 10 percent of the aggregate. Maximum Density Line - The maximum density line is a straight line plot on the FHWA 0.45 power gradation chart that extends from the zero origin point of the chart through the plotted point of the combined aggregate gradation cu rve on the nominal maximum sieve size. Mechanically Fractured Face - An angular, rough, or broken surface of an aggregate particle created by crushing as determined by ASTM D 5821.
401.02 Materials .
401.02.1 Component Materials .
401.02.1 1--General . Component materials will be conditionally accepted at the plant
subject to later rejection if incorporated in a mixture or in work that fails to meet contract requirements.
401.02.1 2--Aggregates . The source of aggregates shall meet the applicable
requirements of Section 703.
401.02.1 2.1--Coarse Aggregate Blend. Mechanically fractured faces by weight of the
combined mineral aggregate coarser than the No. 4 sieve: Mixture Percent Fractured Faces, minimum 25-mm 70, one-face 19-mm * 80, one-face 12.5-mm 90, two-face 9.5-mm 90, two-face 4.75-mm 90, two-face