B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General Provisions (00100-00999)

209OVERHAUL

NE · 2017 Standard SpecificationsBook pages 184184View official source ↗

- 150 - SECTION 209 -- OVERHAUL

209.01 Description

1.All excavated materials shall be hauled as shown in the contract from the source locations to the deposit locations and, regardless of the haul distance, overhaul will not be considered.
2.Overhaul will not be considered for material hauled from sites that are not shown in the contract (i.e. cont ractor obtained sites due to the item of Excavation, Borrow) or fr om sites substituted by the Contractor for the convenience of his/her operation.
3.When field conditions differ from the contract causing an increase in the haul distance, overhaul compensation will be allowed if all six of the following conditions are met:
a.The available excavation, within the affected balance, is inadequate to construct the embank ment within that balance.
b.All available excavation, within the affected balance, has been incorporated into the embankment within that balance.
c.The contract has not provided Excavation, Borrow for embankment construction in the affected balance.
d.The materials must be obtained from outside the affected balance or from Borrow Sites not shown in the contact.
e.The actual haul distance is greater than the av erage plan haul distance (also known as the "free haul distance") for the affected balance.
f.The actual haul distance is greater than the minimum free haul distance of 1,500 feet (457 m).

209.02 Method of Measurement

1.The length of overhaul shall be determined by computing the centers of volume of the overhaul materi al in its original position and after placement. The centers of volume sha ll be determined by computation. The distance between the centers of volu me minus the average plan haul distance or minimum free haul distance whichever is greater shall be the overhaul distance.
2.The quantity of overhaul shall be measured in CY/Sta (m3/Sta M) and shall be the product of the overhaul distance in stations of 100 feet (100 m) multiplied by the volume of mate rial in cubic yards (cubic meters).
3.The average plan haul dist ance will be determined from the Earthwork Data Sheets contained in the contract.

209.03 Basis of Payment

1.Pay Item Pay Unit Overhaul Cubic Yard/Station (CY/Sta) [ C u b i c M e t e r / S t a t i o n ( m3/Sta M)]
2.Payment for overhaul shall be made at the rate of $0.06/CY/Sta. ($0.27/m3/Sta M).
3.Payment is full compensation fo r all requirements described in this Section. - 151 - DIVISION 300 -- SUBGRADE PREPARATION, FOUNDATION COURSES, BASE COURSES, SH OULDER CONS TRUCTION, AND AGGREGATE SURFACING 301 -- GENERAL REQU IREMENTS ......................................................... 153

301.01 General ................................................................................. 153

301.02 Equipment .............................................................................. 153

302 -- SUBGRADE PREPARATION, SHOULDER SUBGRADE PREPARATION, AND PREPARATION OF INTERSECTIONS AND DRIVEWAYS ............................................................................................. 154

302.01 Description ........................................................................... 154

302.02 Material Requirements ........................................................ 154

302.03 Construction Methods ......................................................... 154

302.04 Method of Measurement ...................................................... 156

302.05 Basis of Payment .................................................................. 157

303 -- SUBGRADE STAB ILIZATION ....................................................... 158

303.01 Description ........................................................................... 158

302.02 Material Requirements ........................................................ 158

303.03 Construction Methods ......................................................... 158

303.04 Method of Measurement ...................................................... 158

303.05 Basis of Payment .................................................................. 159

304 -- EARTH SHOULDER CONSTRUCTION ......................................... 160

304.01 Description ........................................................................... 160

304.02 Material Requirements ........................................................ 160

304.03 Construction Methods ......................................................... 160

304.04 Method of Measurement ...................................................... 162

304.05 Basis of Payment .................................................................. 163

305 -- CRUSHED ROCK BASE COURSE ................................................ 164

305.01 Description ........................................................................... 164

305.02 Material Requirements ........................................................ 164

305.03 Construction Methods ......................................................... 164

305.04 Method of Measurement ...................................................... 164

305.05 Basis of Payment .................................................................. 165

306 -- GRANULAR FILL ........................................................................... 166

306.01 Description ........................................................................... 166

306.02 Material Requirements ........................................................ 166

306.03 Construction Methods ......................................................... 166

306.04 Method of Measurement ...................................................... 166

306.05 Basis of Payment .................................................................. 166

307 -- FOUNDATION COURSE ................................................................ 167

307.01 Description ........................................................................... 167

307.02 Material Requirements ........................................................ 167

307.03 Construction Methods ......................................................... 169

307.04 Method of Measurement ...................................................... 171

307.05 Basis of Payment .................................................................. 172

308 -- MEDIAN CONS TRUCTION ............................................................ 173

308.01 Description ........................................................................... 173

308.02 Material Requirements ........................................................ 173

308.03 Construction Method ........................................................... 173

308.04 Method of Measurement ...................................................... 173

308.05 Basis of Payment .................................................................. 173

309 -- CALCIUM CHLORID E TREATMEN T ............................................. 174

309.01 Description ........................................................................... 174

Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 184184 of 1,048.