102.05 102.06(e)
102 - 2 Initial Edition has been obtained, for the Department’s use, as an aid in the project design. The information provided is representative of subsurface conditions only at the locations and depths where such information was obtained, and there is no expressed or implied agreement that uniformity of material exists between explored locations. Preliminary construction schedules are intended to provide a general overview of the sequence of construction operations, based on currently available data. Such information is developed, for the Department’s use, as an aid in the project design. Available construction scheduling information, if any, is being provided for informational purposes only. The Department makes no expressed or implied representation as to the completeness, accuracy, or correctness of the data, and accepts no responsibility for consequences resulting due to any actions undertaken based on the information provided. These schedules are not considered a part of the proposal.