EARTHWORK

221EXTENSIBLE REINFORCEMENT FOR MSE WALLS

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 191–0 Save this section

Ask about Section 221

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

221.1DESCRIPTION—This work is furnishing and installing geogrids for the class specified.

221.2MATERIAL—

(a)Geogrid. Section 738 for the class indicated.
(b)Backfill. Provide backfill consisting of natural materials, free of organic matter and other deleterious

substances.

1.Backfill for Class 1 Geogrids.

1.a Mechanically Stabilized Earth (MSE) Walls. Provide backfill for MSE walls consisting of AASHTO No. 8 coarse aggregate, Section 703.2, in areas that require free draining material or in areas that are at or below the 100-year flood elevation. For all other areas of MSE walls provide backfill meeting the following requirements:

Sieve Size Percent Passing 1/2 inch 100 No. 40 0-60 No. 200 0-10*

*Determination of the fines conten t (minus No. 200 sieve m aterial) for MSE wall backfill m ust be determined by wash test according to PTM No. 100. This is in addition to PTM No. 616.

Provide backfill meeting the quality requirements of Type C coarse aggregate or better as specified in Section 703.2(a), Table B, except provide materials free of clay lumps, friable particles, coal , and coke. Do not use metallurgical slag or cinders. Provide backfill with a maximum plasticity index (PI) of 3 as determined according to AASHTO T 89 and T 90. Provide backfill materials with a pH between 5.0 and 9.0, determined according to AASHTO T 289. Provide backfill with an angle of internal friction of not less than 34 degrees as determined according to AASHTO T 236 on the backfill sample portion that is finer than the No. 8 sieve. Coarse aggregat e as specified in Section 703.2 does not require testing for angle of internal friction. Prepare the shear strength test sample by substituting material coarser than the No. 8 sieve with material that passes the No. 8 sieve but is retained on the No. 10 sieve. The percentage of material finer than the No. 10 sieve must remain as proportioned in the original sample before substitution. Shear testing may be performed on samples containing material larger than the No. 8 sieve if the shear device according to AASHTO T 236, Sections 5.4 and 5.5.

2.Backfill for Class 2 and Class 3 Geogrids. AASHTO No. 8 coarse aggregate, AASHTO No. 57

coarse aggregate, or PennDOT No. 2A coarse aggregate, Section 703.2, and as specified or indicated.

(c)Class 4, Type A Geotextile. Section 735.

221.3CONSTRUCTION—As shown on the Standard Drawings, as indicated or specified, and as follows:

(a)General. Prepare surface as indicated or required. Place geogrid to the vertical spacing, lengths

and areas indicated. Provide overlaps as specified. Place geogrids flat and free of wrinkles, stretching and anchoring as necessary. Do not allow traffic or equipment on the geogrid until it has been covered with one lift (8-inch loose layer) of backfill. Dump backfill of the type specified on top of the geogrid and then blade material across the grid to the required lift thickness. Maximum backfill drop height is 3 feet. If using tracked equipment to spread backfill, do not cross track or make sudden turns that result in deforming or damaging the geogrid. Compact backfill as specified in Section 206.3 or as specified. Reject all geogrids with defects,

tears, punctures, flaws, deterioration, or damage incurred during manufacture, transportation, storage, or installation as determined. Replace damaged geogrid at no additional cost to the Department.

(b)Handling and Storage. According to ASTM D4873 for identification, storage , and handling of

geogrid. Provide clear identification to every roll of geogrid that provides identification of product designation, the manufacturer’s name, lot number, material quantity, and clearly differentiates between rolls of similar geogrid. Protect all geogrid from direct sunlight, ultra-violet rays, temperatures greater than 140F, mud, dirt, dust, and debris.

(c)Class 1 – Uniaxial Geogrid Reinforcement. Place all uniaxial geogrid in the direction of primary

reinforcement (machine or roll direction). The maximum allowable vertical spacing of geogrid is 2 feet for MSE wall applications and any other reinforcement applications. Overlap adjacent layers of geogrid as indicated or required, but in no case less than 3 inches. For concave wall o r slope faces maintain the minimum overlap for 75% of the length of the geogrid from the wall or slope face edge of the geogrid. Do not splice or overlap geogrids in the primary reinforcement (machine or roll) direction.

(d)Class 2 and Class 3 – Biaxial Geogrids. Prepare subgrade or foundation surface flat, smooth and

level, free of any sharp protrusion or debris. Place a layer of Class 4, Type A geotextile on top of the prepared subgrade before placement of geogrid. Overlap edges of geotextile and geogrid (both machine/roll and cross machine/cross roll directions) a minimum of 1 foot. Maximum vertical spacing of geogrid is 12 inches.

221.4MEASUREMENT AND PAYMENT—

(a)Geogrid. Square Yard.

For the class indicated or specified. Any required or incidental overlaps of geogrid are not included in measurement and payment . Only the indicated plan view reinforced area per geogrid layer is included in payment. Backfill used in the installation of geogrid is included in the payment.

(b)Class 4, Type A Geotextile. Section 212.4(c).

222 – 1

Get an email when 221 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 191–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 221 — EXTENSIBLE REINFORCEMENT FOR MSE WALLS. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.