221EXTENSIBLE REINFORCEMENT FOR MSE WALLS

PA · 2026 Standard SpecificationsBook pages 213215View official source ↗

312.1 312.3(a)

312.1DESCRIPTION —This work is construction of a dense graded stone, gravel, or slag base course,

uniformly premixed with a predetermined quantity of water. When placed on subgrade, it includes the preparation of subgrade, as specified in Section 210.

312.2MATERIAL —

(a)Aggregate . Type A or Type B, Section 703.2. Crush the gravel, if used, as required for asphalt surface

courses. Acceptable granulated blast -furnace slag, as specified in Section 350.2, meeting the gradation requirements specified in Table A, may be used.

(b)C alcium Chloride . Section 721 .
(c)Asphalt Material . Emulsified Asphalt Class RS-1 or CRS -1, meeting the requirements of Section 702.
(d)W ater. Section 720.2 .
(e)C omposition of Mixture . Uniformly combine materials with a predetermined quantity of water, so

the final compacted mixture meets the specified gradation within limits of the reviewed job -mix formula.

1.JMF. Establish the JMF within the limits of Table A, when tested according to AASHTO T 27

Add sufficient water to the mixture to provide optimum moisture content at the time of compaction. Do not vary this quantity by more than 2 percentage points from the optimum moisture, as determined according to PTM No. 106, Method B.

2.U niformity . The composition limits are shown in Table A.

To maintain specified criteria throughout the progress of work, at least twice daily analyze samples of the completed mixture taken at the plant or after spreading. Unsatisfactory results or changes in the supply source may require a change in the JMF. The supply source may be changed, if allowed . Maintain accuracy of control so at least 90% of test samples fall within the tolerance limits of Table A. Remove and replace material failing to meet this requirement.

TABLE A COMPOSITION OF MIXTURE (Weight Percent Passing Square Openings Based on Laboratory Sieve Tests)

SIEVE SIZE PERCENT PASSING TOLERANCE LIMITS OF THE APPROVED JMF 2 inches 100 3/4-inch 52-100 ± 8% 3/8-inch 36-70 ± 8% No. 4 24-50 ± 6% No. 16 10-30 ± 6% No. 200 0-10 ± 3%

3.Testing . Section 313 .2.

312.3CONSTRUCTION —

(a)E quipment .
1.Plant. Obtain acceptance of the processing and mixing plant and its operation before start of work.

Measure the coarse and fine material separately, by either volume or weight, and feed into the mixer 312.3(a) 312.3(g) a metering device, and u niformly distribute in the mix. Use mixing plants equipped with automatic cutoff devices, which stop the feed to the mixer if delivery of any component of the mix stops. P

Source: Pennsylvania Department of Transportation Specifications, 2026 Edition. Pages 213215 of 1,522.