EARTHWORK

203CLASS 1, CLASS 1A, AND CLASS 1C EXCAVATION

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 144–0 Save this section

Ask about Section 203

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

203.1DESCRIPTION—This work is excavation for roadways, roadway appurtenances, and structures. The

three classes of excavation include the following:

(a)Class 1 Excavation.

• Excavation as shown on the Standard Drawings, for roadways, shoulders, ditches, drainage structures, stream channels, grade separation structures, retaining walls, and wingwalls.

• Remove topsoil and topsoil mixture, as indicated or directed, and stockpile as specified in Section 801 before excavation operations.

• Excavation, as indicated or directed, for benches and for the removal of existing pavements not being rehabilitated.

• Excavation, as indicated or directed, for the removal of unsuitable material having a bottom width of 8 feet or more.

• Excavation, as indicated or directed, to allow for the placement of topsoil.

• Removal of unforeseen slides and rock ledges.

• Removal of stone fences, piles of dirt or stones, individual boulders, and any portions of structures above the natural ground, when in excess of 1/2 cubic yard volume.

(b)Class 1A Excavation. Excavation for the removal and undercutting of unsuitable material below

subgrade having a bottom width of less than 8 feet, as indicated or directed. Includes draining the undercut, backfilling with AASHTO No. 1 aggregate, and placement of geotextiles as specified in Section 208.3(d).

(c)Class 1C Excavation. Excavation for the removal and undercutting of unsuitable material below

subgrade having a bottom width of 8 feet or more, as indicated or directed. Includes draining the undercut, backfilling with AASHTO No. 1 aggregate, and placement of geotextiles as specified in Section 208.3(d).

203.3CONSTRUCTION—

(a)General. During construction, full depth saw cut the existing pavement using a saw blade or cutting

wheel to neat lines as indicated or directed. Keep the excavation graded to drain , and seal with smooth - wheeled compaction equipment to prevent subgrade from becoming saturated. Seal the surface at the end of the workday to prevent conditions from deteriorating before work can proceed. Temporary drainage structures or channels may be required.

(b)Blasting. Drill and blast rock, not removable by other excavating methods, in a manner that completes

the excavation to the lines indicated, with the least disturbance to adjacent material, as specified in Section 207.

(c)Removal of Existing Pavements.
1.Under Embankments. Remove existing pavements within 3 feet of the finished grade, scarify the

underlying base to a depth of 6 inches and recompact.

2.Outside Embankment Limits. Remove existing pavements outside the limit of embankments as

indicated to neat lines . Backfill with suitable material compacted as specified in Section 206.3(b) . If specified, use Type C or better, No. 2A or OGS as specified in Section 703.2.

3.Roadway Rehabilitation. For both transverse and longitudinal rehabilitation operations, outline area,

cut, and remove existing pavement structure as indicated or directed.

(d)Slopes. Vary the slopes, if directed, depending on the type of material encountered, to obtain

satisfactory stability. Remove the material by a method that allows the revised slope lines to be neatly and acceptably trimmed to meet existing conditions. If a slide occurs, notify the Inspector-in-Charge immediately and cease operations in the slide area until directed to resume. Remove slide material and bench or flatten slopes, as directed, to obtain the planned width of roadway.

(e)Excavation Beyond Established Slope Lines. Do not remove or excavate any material beyond

the slope lines indicated, without written authorization.

(f)Stream Channels. Do not excavate stream channels until directed.
(g)Topsoil. Stockpile topsoil removed from within the excavation or under embankment areas as

specified in Section 801, unless otherwise directed. Replace topsoil that is required on the project and wasted during excavation operations at no additional cost to the Department.

(h)Bracing and Shoring. Brace and shore sides of the excavation, as necessary. Remove bracing

and shoring when no longer required, unless otherwise indicated or directed.

(i)Cofferdams. Drive timber or metal sheeting to form a cofferdam. Brace the sheeting in all directions.

Pump or bail to remove water as necessary. Remove sheeting or bracing when no longer required, unless otherwise indicated or directed.

(j)Suitable Material Required for Embankment and Backfill. Haul suitable excavated material for

placement in embankment and for backfill. Replace suitable material (Section 206.2(a)2) that is required on the project and wasted during excavation operations at no additional cost to the Department.

(k)Unsuitable and Surplus Material. Dispose of unsuitable and surplus material in suitable waste

areas obtained as specified in Section 105.14.

(l)Stockpile of Material. Remove and stockpile excavated material in approved areas.
(m)Removal of Temporary Roadway. Deliver the items including rock and stream crossing pipe to a

County Maintenance Facility or location approved by the Representative . If delivered to a Department Facility, notify and coordinate with the County Manager for delivery. Materials not claimed by the Department are the Contractor’s responsibility for disposal.

203.4MEASUREMENT AND PAYMENT—Cubic Yard

For the class of excavation indicated and as follows:

(a)Excavation Within Established Slope Lines. Excavation quantities will be determined for payment

using the following methods:

1.Plan Quantities. Indicated quantities may be used if the Representative agrees, in writing, that the

project has been constructed as indicated and that the indicated quantities may only be used if the borrow section can be isolated.

2.Measured Quantities. If the plans have been altered by construction changes, or if the project involves

Borrow Excavation that cannot be isolated, excavation will be measured. Measurement may also be requested, or the Representative may require measurement, if there is disagreement as to the accuracy of the indicated quantities. Cross-sectional measurements will be obtained by field survey or by photogrammetric methods. The original cross-sections will be used as the base cross -sections and the final cross-sections plotted thereon. Additional cross-sections may be interpolated at intermediate points, where necessary to determine the

quantities more accurately. The average end-area method, based on horizontal measurement, will be used to compute quantities. If the Representative or Contractor determines this method produces a considerable error, the Representative will use any other three-dimensional method that will keep the error to a minimum. Stone fences, piles of stone, and individual surface boulders, in excess of 1/2 cubic yard and not shown on the cross-sections, will be measured by a three-dimensional volume method. Measure the excavation by acceptable methods involving three -dimensional measurements where it is otherwise impractical to measure material by the cross -sectional method because of the erratic type or location of work.

(b)Excavation Beyond Established Slope Lines. The Department will make payment as specified in

Section 205.4(a) when widened excavation is used in place of borrow excavation, as shown on the Standard Drawings and accepted in writing. Excavating offsets for the convenience of drilling is incidental to the Class 1 Excavation.

(c)Stream Channels. Request an inspection of the excavation when excavation of a channel is

completed as indicated. Cross -sections will be obtained, and the quantities computed, using the method specified in Section 203.4(a)2 when the excavation is satisfactory. These quantities will be used as the basis for current and final payments. Clearing and grubbing required to make such measurements is incidental to stream channel excavation.

(d)Slope Changes. The Department will pay for work required to change slopes from the indicated

template, when directed, as specified in Section 110.03.

(e)Saw Cutting. Linear Foot.

When directed or indicated, s aw cutting will be paid by the Linear Foot. Removal of pavements to neat lines by a milling method will be incidental to the class of excavation and will not be considered a significant change in character as specified in Section 110.02(d).

Get an email when 203 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 144–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 203 — CLASS 1, CLASS 1A, AND CLASS 1C EXCAVATION. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.