510LONGITUDINAL GROOVING OF EXISTING CONCRETE PAVEMENT

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 400–0 Save this section

Ask about Section 510

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

510.1DESCRIPTION—This work is the cutting of longitudinal grooves in existing cement concrete pavement.

510.3CONSTRUCTION —Groove the existing pavement surface longitudinally between the limiting

stations indicated. Do not use flailing type equipment. Do not cut grooves on bridge decks. Cut 3/32 -inch- wide grooves, with a tolerance of plus 1/16 inch, a 3/4 inch center-to-center spacing, and a minimum depth of 3/16 inch. Do not cut grooves within 6 inches of the outside edge and centerline pavement joint. Do not overlap grooves. Remove slurry or residue resulting from the grooving in a continuous operation. Do not allow slurry to flow across lanes occupied by traffic or to flow into gutters or other drainage facilities. Clean the pavement surface after grooving and before opening to traffic.

510.4MEASUREMENT AND PAYMENT—Square Yard

Measured on the finished grooved area.

Get an email when 510 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 400–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 510 — LONGITUDINAL GROOVING OF EXISTING CONCRETE PAVEMENT. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.