B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Concrete (03000-03999)

03341Partial-Depth Precast Concrete Deck Panels

UT · 2026 Standard Specifications✓ Full text on BuildSpecRev. February 15, 2024Book pages 1022–1027 Save this section

Ask about Section 03341

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

PARTIAL-DEPTH PRECAST CONCRETE DECK PANELS

PART 1 GENERAL

1.1SECTION INCLUDES

A.Partial-depth precast concrete deck panels for bridge decks.

1.2RELATED SECTIONS

A.Section 03055: Portland Cement Concrete
B.Section 03056: Self-Consolidating Concrete (SCC)
C.Section 03211: Reinforcing Steel and Welded Wire
D.Section 03390: Concrete Curing
E.Section 03412: Prestressed Concrete

1.3REFERENCES

A.AASHTO M 111: Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel

Products

B.AASHTO M 203: Steel Strand, Low-Relaxation Uncoated Seven-Wire for

Concrete Reinforcement

C.ASTM C 578: Rigid, Cellular Polystyrene Thermal Insulation
D.PCI Design Handbook

1.4DEFINITIONS Not Used

Partial-Depth Precast Concrete Deck Panels

1.5SUBMITTALS

A.Working Drawings
1.Detailed shop drawings of fabricated products for review.
a.Include the following:

1) Details and calculations of the method, materials, and equipment to be used in the prestressing operations, including additions or rearrangement of reinforcing steel and revisions to concrete dimensions from those shown. 2) Method and sequence of stressing.

a.Specifications and details of the prestressing

steel, working stresses, and other data pertaining to the prestressing operation.

b.The proposed arrangement of the prestressing

steel in the panels. 3) Locations and details of lifting inserts, hardware, or devices.

a.Provide at least 4 lifting insets, hardware, or

devices per panel. 4) Type and amount of additional reinforcing required for lifting. 5) Minimum compressive strength to be attained before handling the precast elements.

b.Include supporting engineering calculations.
c.Provide the seal of a Professional Engineer (PE) or

Professional Structural Engineer (SE) licensed in the State of Utah on plans and calculations.

2.Camber strip placement plan for review. Include at least the

following:

a.Heights and widths of camber strips

1) Shown on a plan view of the bridge girders

b.Method, equipment and sequence for forming the camber

strips

c.Procedure describing how camber strips are to be attached

to the girder flanges.

d.Supporting calculations based on field survey and

accounting for camber, profile, cross slope and dead load deflection.

e.Survey data
3.Erection Drawings for precast concrete deck panels for review.
a.Illustrate the proposed method of erection.
b.Provide details of the process including but not limited to the

following: 1) Utilities overhead and below work area Partial-Depth Precast Concrete Deck Panels

2) Protective measures as required 3) Crane information including charts, pick locations and operating radii 4) Cables and lifting devices 5) Load distribution and panel weights 6) Panel erection sequence

B.Material Submittals
1.Certifications
a.Certification stating the manufacturer’s minimum ultimate

tensile strength for each sample of prestressing steel.

C.Casting and Shipping Schedules
1.A casting schedule for information at least 14 calendar days in

advance to make inspection and testing arrangements.

2.A shipping schedule for information at least 14 calendar days

before shipping precast substructure elements to the job site.

D.Photographic Documentation of panel condition at delivery to site and

after deck concrete cure, for information

E.Repair Procedures
1.Written repair procedures for defects and breakage of precast

elements for approval.

1.6IRREPARABLE DAMAGE

A.The following damage types are cause for rejection and are considered

irreparable.

1.Damage which exposes prestressing strand
2.Spalls and honeycombing deeper than 1 inch
3.Cracking parallel to and directly above or below prestressing steel

strand including:

a.A crack more than 6 inch long
b.Multiple cracks of any length
4.Cracking perpendicular to prestressing steel strand including:
a.A crack connecting to the edge of panel with a visible depth

of 1 inch or more

b.A crack more than 10 inch long

Partial-Depth Precast Concrete Deck Panels

PART 2 PRODUCTS

2.1MATERIALS

A.Concrete
1.Use Class AAA(AE) concrete according to Section 03055.
2.Self-consolidating concrete (SCC) may be used at the Contractor’s

option. Refer to Section 03056.

B.Reinforcing Steel
1.Coated reinforcing steel according to Section 03211.
C.Prestressing Steel
1.Grade 270 Low Relaxation Strand, 0.375 inch diameter, according

to AASHTO M 203.

D.Lifting Devices
1.Use devices that can support the required vertical and horizontal

forces with the applicable factors of safety as specified in the Component Handling and Erection Bracing requirements in the PCI Design Handbook.

E.Rigid Plastic Foam
1.Type 6 according to ASTM C 578.
F.Steel Items
1.Galvanize steel items permanently cast into structural concrete

elements according to AASHTO M 111.

2.2FABRICATION

A.Use a Department pre-qualified supplier.
B.Do not place concrete into forms until materials have been inspected and

verified by the Engineer.

C.Fabricate panels to dimensions shown
1.Saw cutting panels to the length shown (cut line parallel to

prestressing steel strand) is acceptable.

D.Construct panels to tolerances specified by the Precast/Prestressed

Concrete Institute (PCI) or National Precast Concrete Association (NPCA) and as shown.

1.Sagging or bowing larger than 1/2 inch are cause for rejection.

Partial-Depth Precast Concrete Deck Panels

E.Perform prestressing according to Section 03412.
F.Permanently mark each precast unit with date of casting and supplier

identification.

1.Stamp markings in fresh concrete.
G.Cure concrete according to Section 03390.
H.Attain a minimum compressive strength of 500 psi before stripping the

form.

1.Maintain concrete curing during form removal and member

handling.

I.Apply unique identification numbers on each panel for asset tracking

purposes.

1.Use stencils and paint or weatherproof, fade resistant, stickers.
2.Position identification numbers so that they will be visible from

below the structure after erection.

2.3QUALITY CONTROL

A.Precast Deck Panels
1.Document test results. The quality control file will contain at least

the following information:

a.Element identification
b.Date and time of cast
c.Concrete cylinder test results
d.Quantity of used concrete and the batch printout
e.Form-stripping date and repairs if applicable
f.Location/number of blockouts and lifting inserts
g.Temperature and moisture of curing period
h.Lifting device details, requirements, and inserts

PART 3 EXECUTION

3.1PREPARATION

A.Photographic Documentation showing unique identification numbers and

condition.

1.Photograph each panel when panels are delivered to the project

site.

2.Photograph each panel after concrete deck has finished curing.
B.Fully brace concrete girders or steel girders before placing panels.

Partial-Depth Precast Concrete Deck Panels

C.Maintain responsibility for aspects of panel installation during stages of

construction including the protection of precast deck panels, the workers, and the traveling public.

D.Clean bearing surfaces and surfaces that will be in permanent contact

before the panels are installed.

E.Place camber strips according to the authorized camber strip placement

plan.

3.2ERECTION

A.Erect precast deck panels according to the authorized erection drawings.
B.Carefully handle materials so that no parts will be cracked, chipped,

broken, or otherwise damaged.

1.Use lifting devices in a manner that will not cause bending or

torsional forces.

C.Place the precast deck panels as shown.
D.Do not lift partial-depth precast concrete deck panels over traffic.
E.Limit construction loads on partial-depth precast panels to limits shown.

END OF SECTION

Partial-Depth Precast Concrete Deck Panels

Get an email when 03341 changes

Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 1022–1027 of 1,331. View official source ↗

Ask about this section

Scoped to Utah Standard Specifications, Section 03341 — Partial-Depth Precast Concrete Deck Panels. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.