5-222 SECTIO N 524 – JOINT SEALER
524.0 1 DESCRIPTON . This work shall consist of furnishing and placing a joint sealer of the type
specified at the locations shown on the Plan s.
524.0 2 MATERIALS . Materials shall meet the requirements of the following subsection s:
Joint Sealer, Hot Poured ................................ ................................ ............................ 707.0 2(a) Joint Sealer, Cold Poured ................................ ................................ ........................... 707.0 2(b) Backer Rod ................................ ................................ ................................ ................. 707.0 2(c) Joint Sealer, Polyurethane ................................ ................................ .......................... 707.0 3 Asphaltic Plug Joint s for Bridges ................................ ................................ .............. 707.1 3
524.0 3 TEMPERATUR E LIMITATIONS . The joint sealer shall be applied per the manufacturer’s
recommendations, however, the ambient air and pavement temperatures shall be greater than 40°F at the time of application.
524.0 4 SAWED JOINTS . Roadway or bridge deck joints shall be formed by means of concrete floor
sawing equipment capable of dry -cutting the designed joint in a single pass. The joint shall be cut and sealed in one continuous operation. The sawe d joint shall not be exposed to traffic until after the sealer has been placed, cured, and is not subject to picking. Joints sawn in bituminous concrete pavement shall be filled and sealed with hot poured or cold poured joint seale r or asphaltic plug joint binder, appropriate backer rod, and an approved bond breaker. When placing new bituminous concrete pavement, each lift of pavement shall be scored with a single blade cut to a depth of 75% of the lift thickness, at the location of the center of the proposed joint. This work shall be completed prior to exposing the lo cation to traffic or, where traffic is not maintained, the same working day that the lift of pavement is placed. The sawed joint in the newly placed wearing course shall be cut and sealed within 24 hours of paving. If the joint location will not be exposed to traffic, the Engineer may allow the Contractor an additional 48 hours to cut and seal the joint. The width of the sawed joint shall be as shown on the Plan s or may be adjusted by the Engineer for seasonal temperature variations. The depth of the sealan t shall be approximately 50% of the width of the sawn joint when hot or cold poured materials are specified in the Contract. The equipment for sawing the single blade cut shall be on the project and approved by the Engineer prior to beginning paving operat ions. 5-223 524.0 5 PREPARATIO N OF JOINTS . Surfaces to which the joint sealer is to adhere shall be free of all foreign material, including curing compound, oil, dirt, sawing film, laitance, and rust. All surfaces shall be thoroughly dry before placing joint sealers.
524.0 6 Placement .
524.0 7 JOINT PROTECTION . The completed joint shall be protected against damage from traffic during
the curing time. Polyurethane joint sealer shall be covered with an impervious material to prevent contact with the linseed oil-mineral spirits mixtures, paints, or other materials containing mineral spirits and similar solvents. 5-226 524.0 8 METHO D OF MEASUREMENT . The quantity of Joint Sealer of the kind specified to be measured for payment will be the number of li near feet used in the complete and accepted work.
524.0 9 BASIS OF PAYMENT . The accepted quantity of Joint Sealer of the kind specified will be paid
for at the Contract unit price per linear foot . Payment will be full compensation for furnishing, handling, placing, and installing the specified materials, including any required backer rod or bond breaker. Payment will also be full compensation for preparing the joint, including saw -cutting where required, cleaning the joint prior to inst alling the sealer and for furnishing all labor, tools, equipment, and incidentals necessary to complete the work. Payment will be made under: Pay Item Pay Unit
524.11 00 Joint Sealer, Hot Poured ................................ ................................ ........... Linear Foot
524.13 00 Joint Sealer, Cold Poured ................................ ................................ .......... Linear Foot
524.21 00 Joint Sealer, Polyurethane ................................ ................................ ......... Linear Foot
5-227 SECTIO N 525 – BRIDG E RAILINGS
525.0 1 DESCRIPTION . This work shall consist of furnishing and erecting bridge railing and performing
repairs to existing bridge railing.
525.0 2 MATERIALS . Materials shall meet the requirements of the following subsection s:
Mortar, Type IV ................................ ................................ ................................ ......... 707.0 1(e) Grease Rustproofing Compound ................................ ................................ ................ 708.0 4 Structural Steel ................................ ................................ ................................ ........... 714.02 Anchor Bolts for Bridge Railing ................................ ................................ ................ 714.07 Galvanizing ................................ ................................ ................................ ................ 726.0 6 Metalizing ................................ ................................ ................................ .................. 726.0 7 Bearing Pads ................................ ................................ ................................ .............. 731.0 1 Metal Hand Railing ................................ ................................ ................................ ....732.01 Aluminum Bridge Railing ................................ ................................ .......................... 732.02 Galvanized Box Beam Bridge Railing ................................ ................................ .......732.03 Steel Beam Bridge Railing ................................ ................................ ......................... 732.04 Concrete shall meet the requirements of Section 501 for Performance -Based Concrete, Class PCD unless otherwise specified in the Contract. For any class of concrete that is not included in Section 501 , a shrinkage -compensating admixture shall be added during the initial concrete mixing phase or as recommended by the chemical manufacturer’s product r epresentative. The Contractor shall provide a written recommendation from the chemical manufacturer’s product representative for the appropriate shrinkage -compensating dosage. Reinforcing steel shall meet the requirements of Section 507 .
525.0 3 FABRICATIO N DRAWINGS . The fabricator of steel components furnished under this section
shall submit detailed fabrication draw ings in accordance with the requirements of Subsection 105.06 and Section 506 . The Contractor shall submit a bending schedule for concrete bridge railing reinforcement in accordance with the requirements of Subsection 105.06 . These requirements do not apply to work performed under Subsection 525.06(c) or Subsection 525.06(d) .