B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

KansasWichita

Retaining wall permit checklist — Wichita, Kansas

Assembled from Wichita’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Wichita requires a permit for a retaining wall.

When a permit is not required

Section 2.4.030 of the residential code article in the Wichita-Sedgwick County Unified Building and Trade Code lets a retaining wall go without a permit up to 4 feet, gauged from the footing base up to the wall's highest point, provided nothing adds load behind it. The building code article of the same code, covering buildings other than one- and two-family dwellings, uses a different number: 30 inches, measured up from the low point of the grade alongside. The adopted code publishes both figures.

Loading the full checklist…

Sources

Other permits Wichita publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Wichita permit requirementsWichita permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Wichita before you build.

Retaining wall permit checklist — Wichita, Kansas | BuildSpec