Home / Calculators / Building Permit Fee Calculator

American Fork, Utah Building Permit Cost Calculator

Estimates permit cost in American Fork from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Plan review (per state code 10-9a-510) · add-on
65% of permit fee — select the permit fee line above to calculate
see rule
Identical plan review fee (per state code 10-9a-541) · add-on
30% of permit fee — select the permit fee line above to calculate
see rule
○Plan review deposit, all new residential plan submissions
Flat fee $1,000.00
$1,000.00
○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
○Expedited review fee
Flat fee $400.00
$400.00
○Plan revision fee, per hour
Flat fee $50.00
$50.00
○Basement plan review fee, per hour
Flat fee $75.00
$75.00
○Reinspection fee, per unit
Flat fee $175.00
$175.00
○Inspection cancellation fee, per unit
Flat fee $125.00
$125.00
○Inspections outside of normal working hours (2 hour maximum)
Flat fee $200.00
$200.00
○Inspections outside normal working hours, each additional hour
Flat fee $100.00
$100.00
○Occupancy fee - residential
Flat fee $50.00
$50.00
○Temporary certificate of occupancy - residential
Flat fee $100.00
$100.00
○Construction water (residential)
Flat fee $100.00
$100.00
○Plan/permit approval extension
Flat fee $100.00
$100.00
○Gas line review
Flat fee $50.00
$50.00
○Address change request
Flat fee $100.00
$100.00
○Parks & Recreation impact fee, single-family residence
Flat fee $3,855.99
$3,855.99
○Roads impact fee, single-family residence (non-TOD)
Flat fee $3,548.30
$3,548.30
○Fire impact fee, single-family residence
Flat fee $429.30
$429.30
○Police impact fee, single-family residence
Flat fee $326.45
$326.45
○Sanitary sewer impact fee, 3/4 inch
Flat fee $840.08
$840.08
○Pressurized irrigation impact fee, per irrigated square foot
Flat fee $0.42
$0.42
○Storm drain impact fee, single-family residence, per gross square foot
Flat fee $0.15
$0.15
○TSSD sewer impact processing fee
Flat fee $15.00
$15.00
○Penalty, unauthorized/non-permitted existing structure - residential
Flat fee $1,500.00
$1,500.00
○Penalty, unauthorized/non-permitted new structure (new footings) - residential
Flat fee $3,000.00
$3,000.00
○Penalty, unauthorized/non-permitted existing structure - commercial
Flat fee $5,000.00
$5,000.00
○Penalty, unauthorized/non-permitted new structure - commercial
Flat fee $10,000.00
$10,000.00
How this jurisdiction calculates the fee

New residential permits carry a flat plan check deposit due at plan submittal, published on the city's Building Permit Fees page as $1,000. The remaining building permit fee is derived from valuation using the ICC Valuation Table / the Plans Examiner's valuation, plus a 1% state fee. Statutory plan review is charged as a percentage of the permit fee. Impact fees and utility connection fees are charged separately on new homes. Note: the adopted fee schedule contains no residential plan-check line item, so the web page is the only published source for this figure. TRANSCRIPTION DEFECT FIXED 2026-09-10: this row carried "Minimum charge, permits based on valuation - $50", i.e. a floor on the PERMIT fee. The city Building Permit Fees page (americanfork.gov/186/Building-Permit-Fees) actually reads "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50" - the $50 is a floor on the PLAN REVIEW fee, not the permit fee, and the $1,000 is a plan review DEPOSIT. Both labels corrected, matching the fix applied to the five sibling American Fork rows on 2026-09-10. No such $50 permit-fee minimum appears anywhere in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026), which was re-read in full. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
○Reinspection fee, per unit
Flat fee $175.00
$175.00
How this jurisdiction calculates the fee

American Fork calculates building permit fees from the project valuation. The city's Building Permit Fees page (https://www.americanfork.gov/186/Building-Permit-Fees) states permits are charged by valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is added and remitted to the state. The adopted fee schedule lists residential building division work (carport, garage, unfinished basement, finished basement, main level, 2nd level) as 'Based on ICC Valuation Table', and shows the building inspection fee and 1% state tax as varying 'Based on home valuation as determined by the Plans Examiner'. Re-verified 2026-09-10 against the American Fork City Adopted Fee Schedule - Effective July 1, 2026 (the FY 2026-2027 edition already cited) and the city Building Permit Fees page. TRANSCRIPTION DEFECT FIXED IN THIS PASS: the $50.00 was stored as a minimum on the PERMIT fee ("Minimum charge, permits based on valuation"). The city page actually reads "All other permits are assessed a plan review fee based on valuation with a minimum charge of $50", i.e. it is a floor on the PLAN REVIEW fee, not on the permit fee; the label has been corrected to match, as the american-fork water_heater row already had it. The 1% state fee is confirmed on the same page. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical meter change out
Flat fee $100.00
$100.00
○Temporary power
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

The adopted fee schedule lists flat residential building division fees for electrical meter change out and for temporary power. An earlier conflicting pair of figures ($45 electrical, $35 temporary power) previously appeared in the new-home fee list on the city's Building Permit Fees web page; that page now publishes Temporary Power at $100, matching the adopted schedule, and carries no separate electrical line. Both figures are therefore drawn from the adopted schedule. Re-verified 2026-09-10 in the American Fork City Adopted Fee Schedule - Effective July 1, 2026: Electrical Meter Change Out $100.00 and Temporary Power $100.00, both on the residential Building Division Fees list (lines 205 and 206) and both repeated at $100.00 on the Commercial Building Division Fees list. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

American Fork calculates building permit fees from the project valuation. The city's Building Permit Fees page (https://www.americanfork.gov/186/Building-Permit-Fees) states permits are charged by valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is added and remitted to the state. The adopted fee schedule lists residential building division work (carport, garage, unfinished basement, finished basement, main level, 2nd level) as 'Based on ICC Valuation Table', and shows the building inspection fee and 1% state tax as varying 'Based on home valuation as determined by the Plans Examiner'. Re-verified 2026-09-10 against the American Fork City Adopted Fee Schedule - Effective July 1, 2026 (the FY 2026-2027 edition already cited) and the city Building Permit Fees page. TRANSCRIPTION DEFECT FIXED IN THIS PASS: the $50.00 was stored as a minimum on the PERMIT fee ("Minimum charge, permits based on valuation"). The city page actually reads "All other permits are assessed a plan review fee based on valuation with a minimum charge of $50", i.e. it is a floor on the PLAN REVIEW fee, not on the permit fee; the label has been corrected to match, as the american-fork water_heater row already had it. The 1% state fee is confirmed on the same page. | 2026-09-13 (lane B run 1025): the cited Building Permit Fees page still states verbatim that all permits other than new residential plan submissions are assessed a plan review fee based on valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is charged and sent to the state. The page itself publishes no re-inspection fee, so fee_source_url is now set to the city's adopted Fiscal Year 2026-2027 General Fee Schedule (effective July 1, 2026, DocumentCenter/View/19532), read in full this pass, which prints "Reinspection Fee per unit $175.00". No figure changed. LABEL/SCOPE DEFECT FOUND 2026-09-15 (run 1291), NOT GUESSED, FIGURES LEFT AS STORED, ROW DELIBERATELY NOT STAMPED: the American Fork FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026) was downloaded and read in full today (1,091 lines, pdftotext -layout). Two of the stored lines verify: "Reinspection Fee per unit $175.00" (Residential Building Division Fees, item 204) and the 1% Utah state surcharge ("Building Inspection Fee and 1% State Tax", item 238). The line "Plan review fee minimum, permits other than new residential = $50" does NOT appear anywhere in the schedule with that label. The schedule prices plan review as a percentage, not a minimum: "Plan Review (per state code 10-9a-510) 65% of permit fee" and "Identical Plan Review Fee (per state code 10-9a-541) 30% of permit fee". The only $50 figure near it is "Plan Revision Fee per hour $50.00" (item 203) - a plan REVISION hourly rate, not a plan review minimum. No superseding edition exists; this is a mis-transcription of the current document, not a fee change. HUMAN ACTION: replace the line with the 65% / 30% plan review percentages, or re-label it as the $50/hour plan revision rate. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
○Reinspection fee, per unit
Flat fee $175.00
$175.00
How this jurisdiction calculates the fee

American Fork calculates building permit fees from the project valuation. The city's Building Permit Fees page (https://www.americanfork.gov/186/Building-Permit-Fees) states permits are charged by valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is added and remitted to the state. The adopted fee schedule lists residential building division work (carport, garage, unfinished basement, finished basement, main level, 2nd level) as 'Based on ICC Valuation Table', and shows the building inspection fee and 1% state tax as varying 'Based on home valuation as determined by the Plans Examiner'. Re-verified 2026-09-10 against the American Fork City Adopted Fee Schedule - Effective July 1, 2026 (the FY 2026-2027 edition already cited) and the city Building Permit Fees page. TRANSCRIPTION DEFECT FIXED IN THIS PASS: the $50.00 was stored as a minimum on the PERMIT fee ("Minimum charge, permits based on valuation"). The city page actually reads "All other permits are assessed a plan review fee based on valuation with a minimum charge of $50", i.e. it is a floor on the PLAN REVIEW fee, not on the permit fee; the label has been corrected to match, as the american-fork water_heater row already had it. The 1% state fee is confirmed on the same page. | 2026-09-13 (lane B run 1025): the cited Building Permit Fees page still states verbatim that all permits other than new residential plan submissions are assessed a plan review fee based on valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is charged and sent to the state. The page itself publishes no re-inspection fee, so fee_source_url is now set to the city's adopted Fiscal Year 2026-2027 General Fee Schedule (effective July 1, 2026, DocumentCenter/View/19532), read in full this pass, which prints "Reinspection Fee per unit $175.00". No figure changed. LABEL/SCOPE DEFECT FOUND 2026-09-15 (run 1291), NOT GUESSED, FIGURES LEFT AS STORED, ROW DELIBERATELY NOT STAMPED: the American Fork FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026) was downloaded and read in full today (1,091 lines, pdftotext -layout). Two of the stored lines verify: "Reinspection Fee per unit $175.00" (Residential Building Division Fees, item 204) and the 1% Utah state surcharge ("Building Inspection Fee and 1% State Tax", item 238). The line "Plan review fee minimum, permits other than new residential = $50" does NOT appear anywhere in the schedule with that label. The schedule prices plan review as a percentage, not a minimum: "Plan Review (per state code 10-9a-510) 65% of permit fee" and "Identical Plan Review Fee (per state code 10-9a-541) 30% of permit fee". The only $50 figure near it is "Plan Revision Fee per hour $50.00" (item 203) - a plan REVISION hourly rate, not a plan review minimum. No superseding edition exists; this is a mis-transcription of the current document, not a fee change. HUMAN ACTION: replace the line with the 65% / 30% plan review percentages, or re-label it as the $50/hour plan revision rate. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

American Fork calculates building permit fees from the project valuation. The city's Building Permit Fees page (https://www.americanfork.gov/186/Building-Permit-Fees) states permits are charged by valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is added and remitted to the state. The adopted fee schedule lists residential building division work (carport, garage, unfinished basement, finished basement, main level, 2nd level) as 'Based on ICC Valuation Table', and shows the building inspection fee and 1% state tax as varying 'Based on home valuation as determined by the Plans Examiner'. Re-verified 2026-09-10 against the American Fork City Adopted Fee Schedule - Effective July 1, 2026 (the FY 2026-2027 edition already cited) and the city Building Permit Fees page. TRANSCRIPTION DEFECT FIXED IN THIS PASS: the $50.00 was stored as a minimum on the PERMIT fee ("Minimum charge, permits based on valuation"). The city page actually reads "All other permits are assessed a plan review fee based on valuation with a minimum charge of $50", i.e. it is a floor on the PLAN REVIEW fee, not on the permit fee; the label has been corrected to match, as the american-fork water_heater row already had it. The 1% state fee is confirmed on the same page. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

American Fork calculates building permit fees from the project valuation. The city's Building Permit Fees page (https://www.americanfork.gov/186/Building-Permit-Fees) states permits are charged by valuation with a minimum charge of $50, and that a state fee of 1% of the building permit fee is added and remitted to the state. The adopted fee schedule lists residential building division work (carport, garage, unfinished basement, finished basement, main level, 2nd level) as 'Based on ICC Valuation Table', and shows the building inspection fee and 1% state tax as varying 'Based on home valuation as determined by the Plans Examiner'. Re-verified 2026-09-10 against the American Fork City Adopted Fee Schedule - Effective July 1, 2026 (the FY 2026-2027 edition already cited) and the city Building Permit Fees page. TRANSCRIPTION DEFECT FIXED IN THIS PASS: the $50.00 was stored as a minimum on the PERMIT fee ("Minimum charge, permits based on valuation"). The city page actually reads "All other permits are assessed a plan review fee based on valuation with a minimum charge of $50", i.e. it is a floor on the PLAN REVIEW fee, not on the permit fee; the label has been corrected to match, as the american-fork water_heater row already had it. The 1% state fee is confirmed on the same page. 2026-09-17 (lane B run 1390, pipeline run 94): THE RUN-1291 "MIS-TRANSCRIPTION" FINDING IS WITHDRAWN. The line "Plan review fee minimum, permits other than new residential = $50" appears VERBATIM on this row's cited source_url, americanfork.gov/186/Building-Permit-Fees, which was re-downloaded and read in full today: "A plan review deposit fee of $1,000 is charged for all new residential plan submissions... All other permits are assessed a plan review fee based on valuation with a minimum charge of $50." Run 1291 searched only the FY 2026-2027 Adopted Fee Schedule PDF and concluded the line was invented; it is not. The line is correctly labelled and correctly sourced. NOTE THE TWO-SOURCE NUANCE, recorded and not resolved: the city web page prices plan review off VALUATION with a $50 floor, while the adopted schedule prices it at 65% of the permit fee (30% identical plans). Both are official American Fork publications and both are carried on the building row; they are not in conflict on any single figure. Also re-confirmed today in the FY 2026-2027 Adopted Fee Schedule (Effective July 1, 2026, 1,091 lines, pdftotext -layout, whole file): "Reinspection Fee per unit $175.00", "Electrical Meter Change Out $100.00", "Temporary Power $100.00", and the 1% Utah state surcharge. No figure changed.

Source: published fee schedule · Verified 9/17/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, lowest valuation bracket ($1.00 to $500.00 valuation)
Flat fee $23.50
$23.50
○Plan review fee minimum, permits other than new residential
Flat fee $50.00
$50.00
State fee added to the building permit fee · add-on
1% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

American Fork publishes no flat water-heater, plumbing or mechanical permit fee. A water heater replacement is permitted as a building permit and priced from the city's published Building Permit Fees and Valuation Table: project valuation sets the fee, and the lowest bracket ($1.00 to $500.00 of valuation) is $23.50. Permits other than new residential are additionally assessed a plan review fee based on valuation with a $50.00 minimum, and the city adds a state fee of 1% of the building permit fee (Utah's state surcharge under Utah Code 15A-1-209). The adopted General Fee Schedule (adopted June 10, 2025, effective July 1, 2025) contains no plumbing, mechanical or water-heater line item at all.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: American Fork building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.