Home / Calculators / Building Permit Fee Calculator

Logan, Utah Building Permit Cost Calculator

Estimates permit cost in Logan from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1.00 to $500.00
Flat fee $50.00
$50.00
Total valuation $501.00 to $2,000.00
$50.00 for the first $500 plus $4.00 for each additional $100, or fraction thereof, to and including $2,000
see rule
Total valuation $2,001.00 to $25,000.00
$110.00 for the first $2,000 plus $15.00 for each additional $1,000 or fraction thereof, to and including $25,000
see rule
Total valuation $25,001.00 to $50,000.00
$455.00 for the first $25,000 plus $11.00 for each additional $1,000 or fraction thereof, to and including $50,000
see rule
Total valuation $50,001.00 to $100,000.00
$730.00 for the first $50,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $100,000
see rule
○Total valuation $100,001.00 to $500,000.00
$1,130.00 for the first $100,000.00, plus 150 x $6.50 for $150,000.00 over (rounded up per "or fraction thereof") = $2,105.00
$2,105.00
○Total valuation $500,001.00 to $1,000,000.00
$250,000.00 is within the first $500,000.00, so the base $3,730.00 applies
$3,730.00
○Total valuation $1,000,001.00 and up
$250,000.00 is within the first $1,000,000.00, so the base $6,605.00 applies
$6,605.00
Plan review, one- and two-family dwellings and associated accessory structures · add-on
0.1% of construction valuation (Construction Valuation x .001). Minimum $15.00 plan check fee. — select the permit fee line above to calculate
see rule
Plan review, commercial / industrial / multi-family · add-on
65% of Building Permit Fee — select the permit fee line above to calculate
see rule
Electrical, mechanical or plumbing permit fee (each) · add-on
8% of Building Permit Fee — select the permit fee line above to calculate
see rule
State surcharge
1%
see rule
○Inspections outside of normal business hours
Flat fee $50.00
$50.00
○Reinspection fees for work not ready for inspection
Flat fee $50.00
$50.00
○Inspections for which no fee is specifically indicated
Flat fee $50.00
$50.00
○Additional plan review required by changes, additions or revisions to plans
Flat fee $50.00
$50.00
Outside consultants for plan checking and/or inspections
Actual costs
see rule
○Appeal petition fee
Flat fee $250.00
$250.00
How this jurisdiction calculates the fee

Building permit fee is calculated from a tiered table applied to total valuation, rounded up to the next even dollar amount on the City's lookup table. Plan check is due at submittal and is calculated separately by project type. A 1% state surcharge applies on top. 2026-09-17 (lane B run 1390, pipeline run 94): SUCCESSOR HUNT DRIVEN TO AN ANSWER, NEGATIVE. The Logan City Building Department fees page (loganutah.gov/.../building_department/fees.php) was read today and still links "Bldg Permit Fee Resolution 2020.pdf" as the operative building permit fee resolution - our exact cited fee_source_url - alongside only ancillary documents (2024 Water Fee Sheet, Impact Fee list 4/29/25, LLP single-phase fees 2025, worked fee examples). No 2021-2026 replacement resolution exists on the city domain. Every stored figure re-verified verbatim in the resolution. No change.

Source: published fee schedule · Verified 11/9/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, total valuation $1.00 to $500.00
Flat fee $50.00
$50.00
Building permit fee, total valuation $501.00 to $2,000.00
$50.00 for the first $500 plus $4.00 for each additional $100, or fraction thereof, to and including $2,000
see rule
Building permit fee, total valuation $2,001.00 to $25,000.00
$110.00 for the first $2,000 plus $15.00 for each additional $1,000 or fraction thereof, to and including $25,000
see rule
Building permit fee, total valuation $25,001.00 to $50,000.00
$455.00 for the first $25,000 plus $11.00 for each additional $1,000 or fraction thereof, to and including $50,000
see rule
Residential plan check fee · add-on
0.1% of construction valuation (valuation x .001), minimum $15.00 — select the permit fee line above to calculate
see rule
Electrical, mechanical or plumbing permit fee
The building permit fee amount multiplied by .08
see rule
State of Utah surcharge added to the permit fee · add-on
1% of the permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

No flat deck fee is published. The permit is priced from the tiered valuation-based building permit fee table in Resolution 20-09, with residential plan review at 0.1% of construction valuation ($15.00 minimum) and a 1% state surcharge. | 2026-09-12 (lane B run 897): populated from the primary document. Logan Municipal Council Resolution No. 20-09, Building Permit Fees, read in full via curl + pdftotext -layout. Commercial plan check is read off the attached tables; residential plan check is 0.1% of construction valuation (valuation x .001) with a $15.00 minimum. Electrical, mechanical and plumbing permit fees are the building permit fee amount multiplied by .08. The State of Utah adds a 1% surcharge. AGE-OF-SOURCE FLAG: the adopting resolution is dated 2020 and is still the schedule the Community Development department publishes.

Source: published fee schedule · Verified 11/4/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical Service Change Permit (Residential)
Flat fee $50.00
$50.00
Electrical Permit Fee · add-on
8% of Building Permit Fee — select the permit fee line above to calculate
see rule
○Gas Line Pressure Test Inspection Permit
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

A residential electrical service change is a flat miscellaneous permit under Resolution 20-09. Electrical work tied to a valued project is instead calculated at 8% of the building permit fee, and a 1% state surcharge applies. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED. fee_source_url was NULL; the cited permit-application PDFs carry the per-permit figures but not the percentage rules. Both were read in full today and confirm "Electric Service Change $50", "Gas Line Pressure Test $50", "Residential Re-roof (removal/replacement same material) (MISC) $50", "Residential Re-roofing (w/structural sheathing) (MISC) $50" and "Residential Siding & Window Replacement (MISC) $50". fee_source_url is now the Logan City Building Permit Fee Resolution 2020, which the department fees page still links as the operative resolution and which prints "Electrical Permit Fee shall be calculated at 8% of Building Permit Fee", "Solar Permit (Residential-Building Division Only) $200.00", "Re-roofing Permit (Residential) $50.00" and "Siding and/or Window Replacement Permit $50.00". No figure changed and no successor resolution exists.

Source: published fee schedule · Verified 11/9/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, lowest valuation bracket ($1.00 to $500.00 valuation)
Flat fee $50.00
$50.00
○Residential plan check fee minimum
Flat fee $15.00
$15.00
State surcharge added by the state · add-on
1% of the permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Logan publishes no fence permit fee. All fences need a Planning and Zoning fence permit, and the Planning and Zoning application fee list carries no fence entry; a building permit is additionally required for any fence taller than six feet. A fence building permit is priced from the valuation table adopted in Logan Municipal Council Resolution No. 20-09 (Building Permit Fees): the lowest bracket ($1.00 to $500.00 of valuation) is $50.00. Residential plan check is 0.1% of construction valuation (valuation x .001) with a $15.00 minimum. The resolution states that the state adds an extra 1% surcharge fee (Utah Code 15A-1-209).

Source: published fee schedule · Verified 11/5/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Re-roofing Permit (Residential)
Flat fee $50.00
$50.00
○Siding and/or Window Replacement Permit
Flat fee $50.00
$50.00
○Solar Permit (Residential - Building Division Only)
Flat fee $200.00
$200.00
How this jurisdiction calculates the fee

Re-roofing on a residence is a flat miscellaneous permit under Resolution 20-09, as is siding and/or window replacement. A 1% state surcharge applies. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED. fee_source_url was NULL; the cited permit-application PDFs carry the per-permit figures but not the percentage rules. Both were read in full today and confirm "Electric Service Change $50", "Gas Line Pressure Test $50", "Residential Re-roof (removal/replacement same material) (MISC) $50", "Residential Re-roofing (w/structural sheathing) (MISC) $50" and "Residential Siding & Window Replacement (MISC) $50". fee_source_url is now the Logan City Building Permit Fee Resolution 2020, which the department fees page still links as the operative resolution and which prints "Electrical Permit Fee shall be calculated at 8% of Building Permit Fee", "Solar Permit (Residential-Building Division Only) $200.00", "Re-roofing Permit (Residential) $50.00" and "Siding and/or Window Replacement Permit $50.00". No figure changed and no successor resolution exists.

Source: published fee schedule · Verified 11/10/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, total valuation $1.00 to $500.00
Flat fee $50.00
$50.00
Building permit fee, total valuation $501.00 to $2,000.00
$50.00 for the first $500 plus $4.00 for each additional $100, or fraction thereof, to and including $2,000
see rule
Building permit fee, total valuation $2,001.00 to $25,000.00
$110.00 for the first $2,000 plus $15.00 for each additional $1,000 or fraction thereof, to and including $25,000
see rule
Building permit fee, total valuation $25,001.00 to $50,000.00
$455.00 for the first $25,000 plus $11.00 for each additional $1,000 or fraction thereof, to and including $50,000
see rule
Residential plan check fee · add-on
0.1% of construction valuation (valuation x .001), minimum $15.00 — select the permit fee line above to calculate
see rule
Electrical, mechanical or plumbing permit fee
The building permit fee amount multiplied by .08
see rule
State of Utah surcharge added to the permit fee · add-on
1% of the permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

No flat retaining wall fee is published. The permit is priced from the tiered valuation-based building permit fee table in Resolution 20-09, with residential plan review at 0.1% of construction valuation ($15.00 minimum) and a 1% state surcharge. | 2026-09-12 (lane B run 897): populated from the primary document. Logan Municipal Council Resolution No. 20-09, Building Permit Fees, read in full via curl + pdftotext -layout. Commercial plan check is read off the attached tables; residential plan check is 0.1% of construction valuation (valuation x .001) with a $15.00 minimum. Electrical, mechanical and plumbing permit fees are the building permit fee amount multiplied by .08. The State of Utah adds a 1% surcharge. AGE-OF-SOURCE FLAG: the adopting resolution is dated 2020 and is still the schedule the Community Development department publishes.

Source: published fee schedule · Verified 11/5/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, total valuation $1.00 to $500.00
Flat fee $50.00
$50.00
Building permit fee, total valuation $501.00 to $2,000.00
$50.00 for the first $500 plus $4.00 for each additional $100, or fraction thereof, to and including $2,000
see rule
Building permit fee, total valuation $2,001.00 to $25,000.00
$110.00 for the first $2,000 plus $15.00 for each additional $1,000 or fraction thereof, to and including $25,000
see rule
Building permit fee, total valuation $25,001.00 to $50,000.00
$455.00 for the first $25,000 plus $11.00 for each additional $1,000 or fraction thereof, to and including $50,000
see rule
Residential plan check fee · add-on
0.1% of construction valuation (valuation x .001), minimum $15.00 — select the permit fee line above to calculate
see rule
Electrical, mechanical or plumbing permit fee
The building permit fee amount multiplied by .08
see rule
State of Utah surcharge added to the permit fee · add-on
1% of the permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

No flat shed or detached garage fee is published. The permit is priced from the tiered valuation-based building permit fee table in Resolution 20-09. Accessory structures to one- and two-family dwellings are reviewed at 0.1% of construction valuation with a $15.00 minimum plan check fee, and a 1% state surcharge applies. | 2026-09-12 (lane B run 897): populated from the primary document. Logan Municipal Council Resolution No. 20-09, Building Permit Fees, read in full via curl + pdftotext -layout. Commercial plan check is read off the attached tables; residential plan check is 0.1% of construction valuation (valuation x .001) with a $15.00 minimum. Electrical, mechanical and plumbing permit fees are the building permit fee amount multiplied by .08. The State of Utah adds a 1% surcharge. AGE-OF-SOURCE FLAG: the adopting resolution is dated 2020 and is still the schedule the Community Development department publishes.

Source: published fee schedule · Verified 11/4/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water Heater Permit (Residential)
Flat fee $50.00
$50.00
○Furnace and/or AC Replacement Permit (Residential)
Flat fee $50.00
$50.00
Plumbing Permit Fee · add-on
8% of Building Permit Fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Residential water heater replacement is a flat miscellaneous permit under Resolution 20-09. A 1% state surcharge applies. Plumbing work tied to a valued project is instead calculated at 8% of the building permit fee.

Source: published fee schedule · Verified 11/9/2026

See the full write-up: Logan building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.