B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Draper, Utah Building Permit Cost Calculator

Estimates permit cost in Draper from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building Permit · add-on
100% of the ICC Schedule — select the permit fee line above to calculate
see rule
○Deposit paid at time application and/or plans are submitted
Flat fee $500.00
$500.00
Plan Review · add-on
65% of building permit — select the permit fee line above to calculate
see rule
○Additional plan review required by changes, alterations, or revisions to plans (per hour)
Flat fee $85.00
$85.00
○Card File Plan Review
Flat fee $1,000.00
$1,000.00
○Clean-up Fee (per lot)
Flat fee $75.00
$75.00
○Re-inspection (per inspection)
Flat fee $85.00
$85.00
○Inspections outside of normal business hours (per hour, 2 hour minimum)
Flat fee $85.00
$85.00
○Demolition Permit
Flat fee $150.00
$150.00
Refund cap for permits cancelled or changed
shall not exceed 60% of the building permit fee
see rule
How this jurisdiction calculates the fee

The building permit fee equals the amount set by the ICC schedule, with valuation taken from the ICC "Building Valuation Data" published in Building Safety Journal. A refundable-against-total deposit is collected when the application and/or plans are submitted. Plan review is charged as a percentage of the building permit fee. Refunds on cancelled or changed permits are capped.

Source: published fee schedule · Verified 11/5/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Application fee per the deck permit submission requirements handout
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

The deck submittal handout directs applicants to pay a $100.00 application fee, invoiced through the portal 24 to 48 hours after submittal; the remaining permit fee is invoiced and paid when the permit is issued and is based on the valuation-driven building permit schedule. The Consolidated Fee Schedule itself carries no deck-specific line and no $100.00 application fee line, so the two official sources do not agree on the application amount. 2026-09-17 (lane B run 1390, pipeline run 94): SUCCESSOR HUNT DRIVEN TO AN ANSWER, NEGATIVE. The three cited Draper handouts are dated 2023-2024, so the department's live page was checked: draperutah.gov/business-development/building-and-renovating/building-permits/ links exactly our three files and no newer ones (deck-2024.pdf, residential-accessory-2023.pdf, retaining-wall-2023.pdf), alongside sfd-2023, basement-2023, res-additions-2023, new-commercial-2023 and public-improvement-bond-2023. The older /departments/community-development/building/ paths now 404; find these handouts via the sitemap at /business-development/building-and-renovating/, not by guessing department paths. All three PDFs are image-only (pdftotext returns 2 lines) and were OCR'd at 300 dpi with pdftoppm + tesseract; every stored figure reads verbatim: "Pay $100.00 application fee" (deck), "Pay a $100.00 application fee" and "A $2,500.00 cash bond is required" (residential accessory), and the retaining-wall fee block "a) $ 250.00 - Retaining Wall Fee / b) $ 500.00 - Application Fee / c) $ 2,500.00 - Public Improvement Bond". No change.

Source: published fee schedule · Verified 11/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical Permit
Flat fee $150.00
$150.00
○Plumbing Permit
Flat fee $150.00
$150.00
○Mechanical Permit
Flat fee $150.00
$150.00
○Solar Panel Review – Residential
Flat fee $600.00
$600.00
How this jurisdiction calculates the fee

Draper charges a flat electrical trade permit fee in the Consolidated Fee Schedule, separate from the valuation-based building permit. Plumbing and mechanical trade permits are set at the same flat amount.

Source: published fee schedule · Verified 11/5/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit (no fence-specific line) · add-on
100% of the ICC Schedule — select the permit fee line above to calculate
see rule
○Deposit due at application, credited toward total fees
Flat fee $500.00
$500.00
Plan review · add-on
65% of building permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Draper's adopted Consolidated Fee Schedule (Resolution 26-37, July 21, 2026) publishes no fence line item. A fence that requires a building permit is priced under the general Building Permit line at 100% of the ICC schedule, with valuation determined from the ICC Building Valuation Data. A $500.00 deposit is paid when the application and/or plans are submitted and is credited toward the total fees assessed; refunds for cancelled or changed permits cannot exceed 60% of the building permit fee. Plan review is 65% of the building permit. Utah's 1% state surcharge (Utah Code 15A-1-209) applies statewide but is not itemized in Draper's schedule.

Source: published fee schedule · Verified 11/5/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit (no re-roof-specific line) · add-on
100% of the ICC Schedule — select the permit fee line above to calculate
see rule
○Deposit due at application, credited toward total fees
Flat fee $500.00
$500.00
Plan review · add-on
65% of building permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Draper's adopted Consolidated Fee Schedule (Resolution 26-37, July 21, 2026) publishes no re-roofing line item. Re-roofing that requires a building permit is priced under the general Building Permit line at 100% of the ICC schedule, with valuation determined from the ICC Building Valuation Data. A $500.00 deposit is paid when the application and/or plans are submitted and is credited toward the total fees assessed; refunds for cancelled or changed permits cannot exceed 60% of the building permit fee. Plan review is 65% of the building permit. Utah's 1% state surcharge (Utah Code 15A-1-209) applies statewide but is not itemized in Draper's schedule.

Source: published fee schedule · Verified 11/5/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Retaining Wall / Helical Permit – Application Fee
Flat fee $500.00
$500.00
○Retaining Wall / Helical Permit – Permit Fee
Flat fee $250.00
$250.00
○Public Improvement Bond listed on the retaining wall submittal handout
Flat fee $2,500.00
$2,500.00
How this jurisdiction calculates the fee

Draper charges a flat retaining wall application fee plus a flat permit fee, and requires a public improvement bond. The application fee is invoiced 24 to 48 hours after submittal and must be paid before review; the permit fee is invoiced and paid at issuance. 2026-09-17 (lane B run 1390, pipeline run 94): SUCCESSOR HUNT DRIVEN TO AN ANSWER, NEGATIVE. The three cited Draper handouts are dated 2023-2024, so the department's live page was checked: draperutah.gov/business-development/building-and-renovating/building-permits/ links exactly our three files and no newer ones (deck-2024.pdf, residential-accessory-2023.pdf, retaining-wall-2023.pdf), alongside sfd-2023, basement-2023, res-additions-2023, new-commercial-2023 and public-improvement-bond-2023. The older /departments/community-development/building/ paths now 404; find these handouts via the sitemap at /business-development/building-and-renovating/, not by guessing department paths. All three PDFs are image-only (pdftotext returns 2 lines) and were OCR'd at 300 dpi with pdftoppm + tesseract; every stored figure reads verbatim: "Pay $100.00 application fee" (deck), "Pay a $100.00 application fee" and "A $2,500.00 cash bond is required" (residential accessory), and the retaining-wall fee block "a) $ 250.00 - Retaining Wall Fee / b) $ 500.00 - Application Fee / c) $ 2,500.00 - Public Improvement Bond". No change.

Source: published fee schedule · Verified 9/17/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Application fee per the residential accessory buildings handout
Flat fee $100.00
$100.00
○Cash bond deposited with the City when a Public Improvement Bond Agreement is required
Flat fee $2,500.00
$2,500.00
○Public Infrastructure Repair and Restoration Bond – Pools and accessory buildings and structures (Consolidated Fee Schedule)
Flat fee $2,500.00
$2,500.00
How this jurisdiction calculates the fee

The residential accessory building handout directs applicants to pay a $100.00 application fee, invoiced after submittal and payable before plan review starts; remaining permit fees vary with the project and are billed before issuance. Where concrete trucks or construction equipment will cross existing public curb, gutter or sidewalk, a cash bond must be deposited with the City before the permit is issued. The Consolidated Fee Schedule has no accessory building permit line but does set a public infrastructure repair and restoration bond for pools and accessory buildings and structures. 2026-09-17 (lane B run 1390, pipeline run 94): SUCCESSOR HUNT DRIVEN TO AN ANSWER, NEGATIVE. The three cited Draper handouts are dated 2023-2024, so the department's live page was checked: draperutah.gov/business-development/building-and-renovating/building-permits/ links exactly our three files and no newer ones (deck-2024.pdf, residential-accessory-2023.pdf, retaining-wall-2023.pdf), alongside sfd-2023, basement-2023, res-additions-2023, new-commercial-2023 and public-improvement-bond-2023. The older /departments/community-development/building/ paths now 404; find these handouts via the sitemap at /business-development/building-and-renovating/, not by guessing department paths. All three PDFs are image-only (pdftotext returns 2 lines) and were OCR'd at 300 dpi with pdftoppm + tesseract; every stored figure reads verbatim: "Pay $100.00 application fee" (deck), "Pay a $100.00 application fee" and "A $2,500.00 cash bond is required" (residential accessory), and the retaining-wall fee block "a) $ 250.00 - Retaining Wall Fee / b) $ 500.00 - Application Fee / c) $ 2,500.00 - Public Improvement Bond". No change.

Source: published fee schedule · Verified 9/17/2026

See the full write-up: Draper building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.