Home / Calculators / Building Permit Fee Calculator

Lehi, Utah Building Permit Cost Calculator

Estimates permit cost in Lehi from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1 to $500
Flat fee $23.50
$23.50
○Valuation $501 to $2,000: first $2,000 base
Flat fee $69.25
$69.25
○Each additional $100 (or fraction) from $501 to $2,000
Flat fee $3.05
$3.05
○Valuation $2,001 to $25,000: first $25,000 base
Flat fee $391.75
$391.75
○Each additional $1,000 from $2,001 to $25,000
Flat fee $14.00
$14.00
○Each additional $1,000 from $25,001 to $50,000
Flat fee $10.10
$10.10
○Valuation $50,001 to $100,000: first $50,000 base
Flat fee $643.75
$643.75
○Each additional $1,000 from $50,001 to $100,000
Flat fee $7.00
$7.00
○Valuation $100,001 to $500,000: first $100,000 base
Flat fee $993.75
$993.75
○Each additional $1,000 from $100,001 to $500,000
Flat fee $5.60
$5.60
○Valuation $500,001 to $1,000,000: first $500,000 base
Flat fee $3,233.75
$3,233.75
○Each additional $1,000 from $500,001 to $1,000,000
Flat fee $4.75
$4.75
○Valuation over $1,000,000: first $1,000,000 base
Flat fee $5,608.75
$5,608.75
○Each additional $1,000 above $1,000,001
Flat fee $3.65
$3.65
○Reinspection fee
Flat fee $100.00
$100.00
○Residential temporary power setup
Flat fee $80.00
$80.00
How this jurisdiction calculates the fee

Stepped valuation table; valuation based on 90% of the ICC Building Valuation Data (August 2025). Plan review is added at 40% of the permit fee for residential and 65% for non-residential, plus a 1% state charge; third-party plan review on major commercial or industrial projects adds 10%.

Source: published fee schedule · Verified 11/4/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Retaining wall permit fee
Flat fee $250.00
$250.00
○Performance bond (refundable)
Flat fee $2,000.00
$2,000.00
○Sidewalk bond (refundable)
Flat fee $2,000.00
$2,000.00
How this jurisdiction calculates the fee

Flat permit fee plus refundable bonds listed under the Building Inspections section of the fee schedule.

Source: published fee schedule · Verified 11/4/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total Valuation of $1.00 - $500
Flat fee $23.50
$23.50
Each $100 increase ($501 - $2,000)
+ $3.05
see rule
○First $2,000 of the Total Valuation
Flat fee $69.25
$69.25
Each $1,000 increase ($2,001 - $25,000)
+ $14
see rule
○First $25,000 of the Total Valuation
Flat fee $391.75
$391.75
Each $1,000 increase ($25,001 - $50,000)
+ $10.10
see rule
Plan Review - Residential (as % of permit fee)
40%
see rule
Plan Review - Non-Residential (as % of permit fee)
65%
see rule
State charge (as % of permit fee)
1%
see rule
How this jurisdiction calculates the fee

Charged as a building permit from the valuation-based fee table; the city publishes no flat shed fee. POPULATED 2026-09-13 (Lane B second tranche): the row previously carried an empty examples array and was therefore unreachable by target selection. The Lehi City FY 2027 Fee Schedule (2027-fee-schedule-approved.pdf) was downloaded and read in full this pass. It publishes no flat shed or accessory-structure permit fee, so a detached shed is priced from the Building Inspections valuation table, with valuation taken at 90 percent of the ICC Building Valuation Data (AUGUST 2025 edition). COLUMN TRAP NOTED: the schedule is a THREE-column table (APPROVED FY 2025 / FY 2026 / FY 2027) and the figures below are the FY 2027 column, which for every valuation bracket is identical to FY 2025 and FY 2026; only the Building Valuation Calculator per-square-foot rates rose in FY 2027.

Source: published fee schedule · Verified 11/4/2026

See the full write-up: Lehi building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.