Clearfield, Utah Building Permit Cost Calculator
Estimates permit cost in Clearfield from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Building valuation from $50,001 to $100,000 $643.75 plus $7.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $100,001 to $500,000 $993.75 plus $5.60 each additional $1,000 or fraction thereof | see rule |
Building valuation from $500,001 to $1,000,000 $3,233.75 plus $4.75 each additional $1,000 or fraction thereof | see rule |
Building valuation from $1,000,001 up $5,608.75 plus $3.65 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential and pools · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, commercial, building value $1 - $100,000 · add-on 65% of the building permit fee for building value of $1 - $100,000 — select the permit fee line above to calculate | see rule |
○Plan check deposit required for new construction, residential Flat fee $100.00 | $100.00 |
○Re-inspection Flat fee $47.00 | $47.00 |
○Demolition permit (including inspections) Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
Clearfield charges a single valuation-based building permit fee taken from the 'General - building valuation' table in Chapter 5 of the Consolidated Fee Schedule. A separate plan check fee is added as a percentage of the permit fee, a plan check deposit is collected up front on new construction, and a 1% state surcharge may apply. Hourly charges of $47 apply to re-inspections, after-hours inspections, inspections with no fee specified, and additional plan review caused by revisions. | DOCUMENT SUPERSESSION 2026-09-13 (lane B run 1025): the previously cited Adopted Consolidated Fee 062525 (Ordinance 2025-16, adopted 6-24-2025) has been superseded by Ordinance 2026-10, adopted 6-23-2026, published as Adopted-Consolidated-Fee-062326.pdf and located from the city's own wp-json media index. Both documents were downloaded and read in full with pdftotext -layout and compared line by line: EVERY stored figure is unchanged in the new ordinance - all eight valuation bands, the 20% residential and 65% commercial plan check percentages, the $100 residential plan check deposit, the $47/hour re-inspection rate and the $150 demolition permit. The only building-section line that changed is Residential "Identical Plans", which moved from a flat $47 to "actual cost of performing the plan review or 30% of the building fee, whichever is less"; that line is not carried in this row. source_url and fee_source_url repointed to the in-force ordinance.
Source: published fee schedule · Verified 11/9/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no flat deck permit fee. A deck requiring a permit is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Consolidated Fee Schedule adopted by Ordinance 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 (6-24-2025) edition; every figure above is unchanged between the two editions.
Source: published fee schedule · Verified 10/30/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no separate electrical permit fee table. Electrical work is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Re-based 2026-09-07 to the current edition: Chapter 5 Consolidated Fee Schedule adopted by ORDINANCE 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 edition of 6-24-2025 this row previously cited. The prior document still returns HTTP 200, so a link audit would not have seen the change. Every figure below was re-read in the 2026-10 edition and is identical between the two editions; the higher untracked bands ($643.75 plus $7.00, $993.75 plus $5.60, $3,233.75 plus $4.75, $5,608.75 plus $3.65) are also unchanged.
Source: published fee schedule · Verified 11/4/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no flat fence permit fee. Where a fence requires a building permit, for example a masonry or concrete fence, it is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Consolidated Fee Schedule adopted by Ordinance 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 (6-24-2025) edition; every figure above is unchanged between the two editions.
Source: published fee schedule · Verified 10/30/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no flat reroofing permit fee. A reroof is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Consolidated Fee Schedule adopted by Ordinance 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 (6-24-2025) edition; every figure above is unchanged between the two editions.
Source: published fee schedule · Verified 11/2/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no flat retaining wall permit fee. A retaining wall is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Consolidated Fee Schedule adopted by Ordinance 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 (6-24-2025) edition; every figure above is unchanged between the two editions.
Source: published fee schedule · Verified 11/2/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no flat shed or accessory structure permit fee. Where a permit is required, a shed is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Consolidated Fee Schedule adopted by Ordinance 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 (6-24-2025) edition; every figure above is unchanged between the two editions.
Source: published fee schedule · Verified 10/30/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation from $1 to $500 (minimum permit fee) Flat fee $23.50 | $23.50 |
Building valuation from $501 to $2,000 $23.50 plus $3.05 each additional $100 or fraction thereof | see rule |
Building valuation from $2,001 to $25,000 $69.25 plus $14.00 each additional $1,000 or fraction thereof | see rule |
Building valuation from $25,001 to $50,000 $391.75 plus $10.10 each additional $1,000 or fraction thereof | see rule |
Plan check fee, residential · add-on 20% of the building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $47.00 | $47.00 |
State surcharge · add-on 1% of building permit fees, where applicable — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Clearfield publishes no separate plumbing permit fee table and no flat water heater fee. A water heater replacement requiring a permit is priced from the General - building valuation table in Chapter 5 of the Consolidated Fee Schedule, plus a plan check fee of 20% of the building permit fee for residential work and a 1% state surcharge where applicable. Consolidated Fee Schedule adopted by Ordinance 2026-10 on 6-23-2026, which superseded the Ordinance 2025-16 (6-24-2025) edition; every figure above is unchanged between the two editions.
Source: published fee schedule · Verified 10/30/2026
See the full write-up: Clearfield building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.