Eagle Mountain, Utah Building Permit Cost Calculator
Estimates permit cost in Eagle Mountain from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1.00 to $500 Flat fee $24.00 | $24.00 |
Total valuation $501 to $2,000 $24 for the first $500, plus $3 for each additional $100, or fraction thereof, to and including $2,000 | see rule |
Total valuation $2,001 to $40,000 $69 for the first $2,000, plus $7 for each additional $1,000, or fraction thereof, to and including $40,000 | see rule |
Total valuation $40,001 to $100,000 $335 for the first $40,000, plus $5 for each additional $1,000, or fraction thereof, to and including $100,000 | see rule |
○Total valuation $100,001 to $500,000 $635.00 for the first $100,000.00, plus 150 x $2.00 for $150,000.00 over (rounded up per "or fraction thereof") = $935.00 | $935.00 |
○Total valuation $500,001 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $1,435.00 applies | $1,435.00 |
○Total valuation $1,000,001 to $5,000,000 $250,000.00 is within the first $1,000,000.00, so the base $2,935.00 applies | $2,935.00 |
○Total valuation $5,000,001 and up $250,000.00 is within the first $5,000,000.00, so the base $14,935.00 applies | $14,935.00 |
State surcharge (Utah Code 15A-1-209(5)) 1% surcharge assessed against permit for per Building Permit | see rule |
Residential Plan Review Fee · add-on 40% of the Permit Fee — select the permit fee line above to calculate | see rule |
Commercial Plan Review Fee · add-on 65% of the Permit Fee — select the permit fee line above to calculate | see rule |
Identical Residential Plan Review Fee (Card File) · add-on 30% of Original Plan Review Fee — select the permit fee line above to calculate | see rule |
Plan Review Fees for Re-checking of Plans $75/unit | see rule |
○Additional Plan Review Required by Changes, Additions, Revisions to Plan (minimum charge of 1/2 hour) Flat fee $75.00 | $75.00 |
○Non-Valuation Based Permit - Basement Finish Flat fee $250.00 | $250.00 |
○Non-Valuation Based Permit - Walkout Basement Flat fee $250.00 | $250.00 |
○Non-Valuation Based Permit - Residential Demolition Flat fee $250.00 | $250.00 |
○Non-Valuation Based Permit - Helical Piers Flat fee $250.00 | $250.00 |
○Non-Valuation Based Permit - HVAC Flat fee $100.00 | $100.00 |
○Non-Valuation Based Permit - Electrical Vehicle Charger Flat fee $150.00 | $150.00 |
○Accessory Dwelling Permit Flat fee $230.00 | $230.00 |
○Non-Valuation Based Permit - Inspection Only Flat fee $50.00 | $50.00 |
First Reinspection Fee $50/trade | see rule |
Fee for All Subsequent Reinspections $100/trade | see rule |
Inspections outside of normal business hours (minimum charge of two hours) $100/hour | see rule |
Inspections for which No Fee is Specifically Indicated $50/hour | see rule |
○Temporary Power Inspection Flat fee $100.00 | $100.00 |
Temporary Occupancy Fee (Residential) $100 + 120% of Value of Uncompleted Items | see rule |
Temporary Occupancy Fee (Commercial) $200 + 120% of Value of Uncompleted Items | see rule |
○Board of Appeals (Current Building Code) Flat fee $100.00 | $100.00 |
Contractor Infrastructure Protection Deposit $1,000 Cash Deposit for 1 Home, or $5,000 Cash Deposit for more than 1 Concurrent Home or Project | see rule |
Owner Builder Infrastructure Protection Deposit $1,000 Cash Deposit | see rule |
Sales Office, Construction Trailer, and Craft Tent $200 + State Surcharge | see rule |
Use of Outside Consultants for Plan Checking, Inspections, or Both Actual Cost to the City | see rule |
How this jurisdiction calculates the fee
Valuation-based. Section 13.1 of the Consolidated Fee Schedule sets a tiered fee against total valuation, which the city calculates using its Building Valuation Table, Appendix B. A 1% state surcharge is added per Utah Code 15A-1-209(5). Plan review is charged separately as a percentage of the permit fee (Section 13.3). The city states that fees are not calculated until plan review is complete: "Once the permit has been reviewed, the fees are calculated automatically by valuation."
Source: published fee schedule · Verified 11/10/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, lowest valuation bracket (total valuation $1.00 to $500) Flat fee $24.00 | $24.00 |
○Building permit fee, total valuation $501 to $2,000 $24.00 for the first $500.00, plus 2,495 x $3.00 for $249,500.00 over (rounded up per "or fraction thereof") = $7,509.00 | $7,509.00 |
○Building permit fee, total valuation $2,001 to $40,000 $69.00 for the first $2,000.00, plus 248 x $7.00 for $248,000.00 over (rounded up per "or fraction thereof") = $1,805.00 | $1,805.00 |
Utah state surcharge added to every building permit · add-on 1% of the permit fee — select the permit fee line above to calculate | see rule |
Residential plan review fee · add-on 40% of the permit fee — select the permit fee line above to calculate | see rule |
○First re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Eagle Mountain publishes no flat deck-permit fee. A deck attached to a home requires a building permit, and the charge is the valuation-based Building Permit Fees table in section 13.1 of the city's Consolidated Fee Schedule (section last revised 6/16/2026). Total valuation is derived from the city's adopted Building Valuation Data table in Appendix B of the same schedule, and the applicant states the project valuation on the permit application. A 1% surcharge is added to every building permit under Utah Code 15A-1-209(5), and residential plan review is charged at 40% of the permit fee. All decks require structural engineering.
Source: published fee schedule · Verified 11/4/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
A fence permit is required but no fee is published for it. Eagle Mountain Municipal Code 17.60.120(A) states that a fence permit, or authorization via city site plan approval, is required to sanction placement of a fence, wall or privacy screen. The city's Consolidated Fee Schedule is the document that prices Eagle Mountain permits, and all 29 pages were read: it contains no fence line item anywhere, and fences are not among the flat-rate non-valuation permits listed in section 13.1. Fences are also absent from the Building Department's list of work requiring a building permit. Applicants should confirm the charge with the city; a valuation-based building permit fee under section 13.1 would apply only where the fence work independently triggers a building permit. | 2026-09-12 (lane B run 897): the Consolidated Fee Schedule (Updated July 1, 2026; section 13.1 Last Revision 6/16/2026) was downloaded and all 29 pages re-read. Still no fence line item anywhere and fences are still absent from the flat-rate non-valuation permit list. Confirmed unpriced rather than left stale; deliberately not populated, because inventing a valuation-based figure here would not be what the City publishes.
Source: published fee schedule · Verified 9/12/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Non-Valuation Based Permit - Reroof Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
Flat, non-valuation permit fee published in Section 13.1 of the Consolidated Fee Schedule ("Last Revision: 6/16/2026"). The 1% state surcharge under Utah Code 15A-1-209(5) applies to building permits.
Source: published fee schedule · Verified 11/9/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, lowest valuation bracket (total valuation $1.00 to $500) Flat fee $24.00 | $24.00 |
○Building permit fee, total valuation $501 to $2,000 $24.00 for the first $500.00, plus 2,495 x $3.00 for $249,500.00 over (rounded up per "or fraction thereof") = $7,509.00 | $7,509.00 |
○Building permit fee, total valuation $2,001 to $40,000 $69.00 for the first $2,000.00, plus 248 x $7.00 for $248,000.00 over (rounded up per "or fraction thereof") = $1,805.00 | $1,805.00 |
Utah state surcharge added to every building permit · add-on 1% of the permit fee — select the permit fee line above to calculate | see rule |
Residential plan review fee · add-on 40% of the permit fee — select the permit fee line above to calculate | see rule |
○First re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
A building permit is required for any retaining wall more than 4 feet high measured from the bottom of the footing to the top of the wall, and for a wall of any height that will support a surcharge. Eagle Mountain publishes no flat retaining-wall fee; the charge is the valuation-based Building Permit Fees table in section 13.1 of the Consolidated Fee Schedule (section last revised 6/16/2026), computed from the project valuation stated on the application and the Building Valuation Data table in Appendix B. A 1% surcharge is added to every building permit under Utah Code 15A-1-209(5), and residential plan review is charged at 40% of the permit fee.
Source: published fee schedule · Verified 11/5/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, lowest valuation bracket (total valuation $1.00 to $500) Flat fee $24.00 | $24.00 |
○Building permit fee, total valuation $501 to $2,000 $24.00 for the first $500.00, plus 2,495 x $3.00 for $249,500.00 over (rounded up per "or fraction thereof") = $7,509.00 | $7,509.00 |
○Building permit fee, total valuation $2,001 to $40,000 $69.00 for the first $2,000.00, plus 248 x $7.00 for $248,000.00 over (rounded up per "or fraction thereof") = $1,805.00 | $1,805.00 |
Utah state surcharge added to every building permit · add-on 1% of the permit fee — select the permit fee line above to calculate | see rule |
Residential plan review fee · add-on 40% of the permit fee — select the permit fee line above to calculate | see rule |
○First re-inspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
A building permit is required for a shed over 200 square feet, and for a shed of any size served by electrical or plumbing. Eagle Mountain publishes no flat shed fee; the charge is the valuation-based Building Permit Fees table in section 13.1 of the Consolidated Fee Schedule (section last revised 6/16/2026). Valuation is derived from the Building Valuation Data table in Appendix B, under which a detached utility structure falls in the Group U utility/miscellaneous occupancy. A 1% surcharge is added to every building permit under Utah Code 15A-1-209(5), and residential plan review is charged at 40% of the permit fee.
Source: published fee schedule · Verified 11/4/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Non-Valuation Based Permit - Water Heater Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
Flat, non-valuation permit fee published in Section 13.1 of the Consolidated Fee Schedule ("Last Revision: 6/16/2026"). The 1% state surcharge under Utah Code 15A-1-209(5) applies to building permits.
Source: published fee schedule · Verified 11/9/2026
See the full write-up: Eagle Mountain building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.