Kaysville, Utah Building Permit Cost Calculator
Estimates permit cost in Kaysville from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, valuation $1.00 to $500 Flat fee $23.50 | $23.50 |
Building permit fee, valuation $500.01 to $2,000 $23.50 for first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Building permit fee, valuation $2,000.01 to $25,000 $69.25 for first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Building permit fee, valuation $25,000.01 to $50,000 $391.25 for the first $25,000.00, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00 | see rule |
Building permit fee, valuation $50,000.01 to $100,000 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 | see rule |
○Building permit fee, valuation $100,000.01 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Building permit fee, valuation $500,000.01 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,233.75 applies | $3,233.75 |
Building permit fee, valuation $1,000,000.01 and up $5,608.75 for first $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof | see rule |
Plan check fee - residential · add-on 25% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - multi-family · add-on 35% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - commercial · add-on 55% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, review of duplicate plans · add-on 10% of permit fee — select the permit fee line above to calculate | see rule |
State fee · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Inspection fee Flat fee $65.00 | $65.00 |
○Residential plan review deposit (applied to total plan review charge) Flat fee $25.00 | $25.00 |
○Commercial plan review deposit Flat fee $1,000.00 | $1,000.00 |
Unpermitted building improvements 2x the building permit fee | see rule |
Existing residential structure (remodels) $50.00 $10.00 for each $1,000 or fraction thereof in valuation | see rule |
○Manufactured homes, basement finishes (consolidated fee schedule) Flat fee $195.00 | $195.00 |
○Basement finishes and remodel fees (Building Permit Fees web page) Flat fee $245.70 | $245.70 |
○Construction guaranty bond - new (refundable upon final occupancy permit) Flat fee $1,500.00 | $1,500.00 |
○Construction bond - additions, detached garages, accessory buildings and swimming pools Flat fee $500.00 | $500.00 |
○Manufactured homes guaranty bond Flat fee $200.00 | $200.00 |
○Parks, recreation, open space and trails impact fee - single family dwelling Flat fee $4,480.00 | $4,480.00 |
○Parks, recreation, open space and trails impact fee - multi-family Flat fee $2,742.00 | $2,742.00 |
○Water impact fee, 3/4 inch Flat fee $769.00 | $769.00 |
○Water impact fee, 1 inch Flat fee $1,282.00 | $1,282.00 |
○Water connection and meter, 3/4 inch Flat fee $345.00 | $345.00 |
○Water connection and meter, 1 inch Flat fee $400.00 | $400.00 |
○Central Davis Sewer Flat fee $2,400.00 | $2,400.00 |
○North Davis Sewer Flat fee $3,454.03 | $3,454.03 |
○Roadway impact fee, single family residence Flat fee $1,330.00 | $1,330.00 |
○Fire facilities impact fee, residential Flat fee $296.00 | $296.00 |
○Public safety facilities impact fee, residential Flat fee $356.00 | $356.00 |
○Residential pools Flat fee $260.00 | $260.00 |
○Tubs, spas, each Flat fee $130.00 | $130.00 |
○Residential solar Flat fee $260.00 | $260.00 |
○Application deposit, all residential types (non-refundable, applied to total) Flat fee $25.00 | $25.00 |
How this jurisdiction calculates the fee
The building permit fee is based on valuation, using the consolidated fee schedule's 1997 UBC fee table, with valuation taken from ICC current Building Valuation Data. A plan check fee is added as a percentage of the permit fee (25 percent residential, 35 percent multi-family, 55 percent commercial), plus a 1 percent state education fee. New homes also carry a $1,500 construction bond, refundable upon final occupancy permit. Impact and connection fees are charged separately. | 2026-09-14 (lane B run 1068): ROW DELIBERATELY NOT STAMPED - CITED DOCUMENT UNREADABLE. kaysville.municipalcodeonline.com/book?type=fees returns HTTP 200 but is an AngularJS shell: the served HTML is ~2.4KB of template with no fee data, and WebFetch on the same URL returns only interface elements, so the Consolidated Fee Schedule cannot be read by any non-browser client. No data endpoint was found (/api/book, /Home/GetBook, /book/gettoc, /Book/GetSections all 404). The city's own kaysville.gov/749/Building-Permit-Fees page WAS read in full and corroborates the fee basis and every flat amount stored elsewhere for Kaysville ($65.65 furnace/AC/water heater, $245.70 basement, $195 electrical service upgrade, $535.60 power extension, power impact fees $954/$1,272/$1,500/$1,908, $25 residential application deposit, $1,500 and $500 construction bonds, $260 pools, $260 residential solar, all impact-fee lines), plus "Building Permit fee is based on Valuation ... plus a 1% State education fee and a 25% plan check fee". What could NOT be confirmed line-by-line is the valuation fee table itself (the 1997 UBC Table 1-A amounts) and the 35%/55% multi-family and commercial plan-check percentages. Nothing was changed and nothing was guessed. FOR FUTURE PASSES: either accept kaysville.gov as the source of record for this jurisdiction and re-point fee_source_url there, or find a PDF export of the code book; re-scraping municipalcodeonline with curl or WebFetch is waste. | 2026-09-14 (lane B run 1083): BLOCKAGE CLEARED, CITED DOCUMENT NOW FULLY READABLE. The AngularJS shell at kaysville.municipalcodeonline.com/book?type=fees is bypassed by its own print view: GET https://kaysville.municipalcodeonline.com/book/print?type=fees returns HTTP 200 with the complete Consolidated Fee Schedule as server-rendered HTML (~265KB, 644 dollar figures). The schedule read this pass is EFFECTIVE JULY 1, 2026, most recently amended by Res. 26-06-06 on 6/18/2026. Every stored figure in this row was confirmed verbatim against it, on the same line as its own label, including the eight 1997 UBC Table 1-A valuation brackets and the 35 percent multi-family / 55 percent commercial / 10 percent duplicate-plan check percentages that no prior pass could confirm. No figure changed. SUPERSEDES THE STANDING ADVICE ABOVE: scraping this host is NOT waste - use the /book/print?type=fees route, not /book, and not WebFetch. | 2026-09-24 (lane B run 1728) CARRIED-FORWARD ITEMS CLOSED. Run 1482 left the four Kaysville rows unstamped because four figures on this row could not be verified from the Consolidated Fee Schedule alone. All four were read verbatim today on the city's own Building Permit Fees page (kaysville.gov/749): "Central Davis Sewer: $2,400", "North Davis Sewer: $3,454.03", "Residential Solar: Fees: $260" and "Basement Finishes and Remodel Fees: $245.70". The Consolidated Fee Schedule itself (Effective July 1, 2026, latest amendment Res. 26-06-06 of 6/18/2026, unchanged from the 2026-09-18 pass) confirms the whole 1997 UBC valuation ladder, the 25/35/55/10 percent plan-check percentages, the 1 percent state fee, the $65.00 inspection fee, the $25.00 residential and $1,000.00 commercial plan-review deposits, the 2x unpermitted-improvement fee, "Existing Residential Structure (Remodels) $50.00 / $10.00 for each $1,000 or fraction thereof in valuation", "Manufactured Homes, Basement Finishes $195.00", pools $260.00, tubs and spas $130.00, the $1,500.00 and $500.00 and $200.00 construction bonds, the parks impact fees $4,480.00 and $2,742.00, water impact $769.00 and $1,282.00, connection and meter $345.00 and $400.00, roadway $1,330.00, fire facilities $296.00 and public safety $356.00. NO FIGURE CHANGED.
Source: published fee schedule · Verified 9/24/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, valuation $1.00 to $500 Flat fee $23.50 | $23.50 |
Building permit fee, valuation $500.01 to $2,000 $23.50 for first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Building permit fee, valuation $2,000.01 to $25,000 $69.25 for first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Building permit fee, valuation $25,000.01 to $50,000 $391.25 for the first $25,000.00, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00 | see rule |
Building permit fee, valuation $50,000.01 to $100,000 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 | see rule |
○Building permit fee, valuation $100,000.01 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Building permit fee, valuation $500,000.01 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,233.75 applies | $3,233.75 |
Building permit fee, valuation $1,000,000.01 and up $5,608.75 for first $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof | see rule |
Plan check fee - residential · add-on 25% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - multi-family · add-on 35% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - commercial · add-on 55% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, review of duplicate plans · add-on 10% of permit fee — select the permit fee line above to calculate | see rule |
State fee · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Inspection fee Flat fee $65.00 | $65.00 |
○Residential plan review deposit (applied to total plan review charge) Flat fee $25.00 | $25.00 |
○Commercial plan review deposit Flat fee $1,000.00 | $1,000.00 |
Unpermitted building improvements 2x the building permit fee | see rule |
How this jurisdiction calculates the fee
Deck permits are charged from the valuation-based building permit fee table in the consolidated fee schedule, plus the residential plan check percentage and the 1 percent state fee. A $25 residential application deposit is collected at submittal and applied toward the total. | 2026-09-14 (lane B run 1083): BLOCKAGE CLEARED, CITED DOCUMENT NOW FULLY READABLE. The AngularJS shell at kaysville.municipalcodeonline.com/book?type=fees is bypassed by its own print view: GET https://kaysville.municipalcodeonline.com/book/print?type=fees returns HTTP 200 with the complete Consolidated Fee Schedule as server-rendered HTML (~265KB, 644 dollar figures). The schedule read this pass is EFFECTIVE JULY 1, 2026, most recently amended by Res. 26-06-06 on 6/18/2026. Every stored figure in this row was confirmed verbatim against it, on the same line as its own label, including the eight 1997 UBC Table 1-A valuation brackets and the 35 percent multi-family / 55 percent commercial / 10 percent duplicate-plan check percentages that no prior pass could confirm. No figure changed. SUPERSEDES THE STANDING ADVICE ABOVE: scraping this host is NOT waste - use the /book/print?type=fees route, not /book, and not WebFetch. | 2026-09-24 (lane B run 1728) CARRIED-FORWARD ITEMS CLOSED. Run 1482 left the four Kaysville rows unstamped because four figures on this row could not be verified from the Consolidated Fee Schedule alone. All four were read verbatim today on the city's own Building Permit Fees page (kaysville.gov/749): "Central Davis Sewer: $2,400", "North Davis Sewer: $3,454.03", "Residential Solar: Fees: $260" and "Basement Finishes and Remodel Fees: $245.70". The Consolidated Fee Schedule itself (Effective July 1, 2026, latest amendment Res. 26-06-06 of 6/18/2026, unchanged from the 2026-09-18 pass) confirms the whole 1997 UBC valuation ladder, the 25/35/55/10 percent plan-check percentages, the 1 percent state fee, the $65.00 inspection fee, the $25.00 residential and $1,000.00 commercial plan-review deposits, the 2x unpermitted-improvement fee, "Existing Residential Structure (Remodels) $50.00 / $10.00 for each $1,000 or fraction thereof in valuation", "Manufactured Homes, Basement Finishes $195.00", pools $260.00, tubs and spas $130.00, the $1,500.00 and $500.00 and $200.00 construction bonds, the parks impact fees $4,480.00 and $2,742.00, water impact $769.00 and $1,282.00, connection and meter $345.00 and $400.00, roadway $1,330.00, fire facilities $296.00 and public safety $356.00. NO FIGURE CHANGED.
Source: published fee schedule · Verified 9/24/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical service upgrade Flat fee $195.00 | $195.00 |
○Power extension fee (when upgrading to 400 amps) Flat fee $535.60 | $535.60 |
○Power impact fee, residential single phase 100A Flat fee $954.00 | $954.00 |
○Power impact fee, residential single phase 125A Flat fee $1,272.00 | $1,272.00 |
○Power impact fee, residential single phase 150A (consolidated fee schedule) Flat fee $1,590.00 | $1,590.00 |
○Power impact fee, 150AMP (Building Permit Fees web page) Flat fee $1,500.00 | $1,500.00 |
○Power impact fee, residential single phase 200A Flat fee $1,908.00 | $1,908.00 |
○Power impact fee, residential single phase 225A Flat fee $2,544.00 | $2,544.00 |
○Power impact fee, residential single phase 400A Flat fee $3,817.00 | $3,817.00 |
○Power connection Flat fee $25.00 | $25.00 |
○Generlink generator transfer switch installation Flat fee $115.00 | $115.00 |
○Application deposit, all residential types Flat fee $25.00 | $25.00 |
How this jurisdiction calculates the fee
The Building Permit Fees web page publishes flat fees for electrical service upgrades, plus the difference in impact fees for the larger service size and, when upgrading to 400 amps, an electrical extension cost. Power impact fees are listed by service size in the consolidated fee schedule. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED, ALL TWELVE LINES NOW VERIFIED. The cited source_url kaysville.municipalcodeonline.com/book?type=fees is an Angular shell; plain curl and a headless render of that URL both return only chrome. The document itself was reached at its print view, kaysville.municipalcodeonline.com/book/print?type=fees, rendered with headless Chromium (1,515 lines) - the Kaysville Consolidated Fee Schedule, Effective July 1, 2026, latest amendment Res. 26-06-06 on 6/18/2026. It prints the POWER IMPACT FEES table verbatim for Residential Single Phase Service Sizes: 100A/24KVA $954.00, 125A/30 $1,272.00, 150A/36 $1,590.00, 200A/48 $1,908.00, 225A/54 $2,544.00, 400A/96 $3,817.00; and under Power: "Connection $25.00", "Generlink Generator Transfer Switch Installation $115". The remaining lines are on the city Building Permit Fees page, kaysville.gov/749, which prints "Fee: $195, plus the difference in the service size in impact fees and $535.60 in electrical extension costs when upgrading to 400 amps" and "$954 for 100AMP, $1,272 for 125AMP, $1,500 for 150AMP, $1,908 for 200AMP". fee_source_url set to that page. ONE KNOWN DISCREPANCY RE-CONFIRMED AND DELIBERATELY KEPT AS TWO LINES, NOT RESOLVED: the web page says $1,500 for 150AMP while the adopted consolidated schedule says $1,590.00. Both are official City of Kaysville publications; the row carries both, each labelled with its source, and neither was picked. ONE LABEL IMPRECISION, NO FIGURE AFFECTED: "Application deposit, all residential types = $25" is the schedule's "Residential Plan Review Deposit (applied to total plan review charge) $25.00" - a plan review deposit, not a general application deposit; worth tightening on a pass that is rewriting Kaysville anyway. No figure changed.
Source: published fee schedule · Verified 9/17/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, valuation $1.00 to $500 Flat fee $23.50 | $23.50 |
Building permit fee, valuation $500.01 to $2,000 $23.50 for first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Building permit fee, valuation $2,000.01 to $25,000 $69.25 for first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Building permit fee, valuation $25,000.01 to $50,000 $391.25 for the first $25,000.00, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00 | see rule |
Building permit fee, valuation $50,000.01 to $100,000 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 | see rule |
○Building permit fee, valuation $100,000.01 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Building permit fee, valuation $500,000.01 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,233.75 applies | $3,233.75 |
Building permit fee, valuation $1,000,000.01 and up $5,608.75 for first $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof | see rule |
Plan check fee - residential · add-on 25% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - multi-family · add-on 35% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - commercial · add-on 55% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, review of duplicate plans · add-on 10% of permit fee — select the permit fee line above to calculate | see rule |
State fee · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Inspection fee Flat fee $65.00 | $65.00 |
○Residential plan review deposit (applied to total plan review charge) Flat fee $25.00 | $25.00 |
○Commercial plan review deposit Flat fee $1,000.00 | $1,000.00 |
Unpermitted building improvements 2x the building permit fee | see rule |
How this jurisdiction calculates the fee
Fence permits are charged from the valuation-based building permit fee table in the consolidated fee schedule, plus the residential plan check percentage and the 1 percent state fee. A $25 residential application deposit is collected at submittal and applied toward the total. | 2026-09-14 (lane B run 1083): BLOCKAGE CLEARED, CITED DOCUMENT NOW FULLY READABLE. The AngularJS shell at kaysville.municipalcodeonline.com/book?type=fees is bypassed by its own print view: GET https://kaysville.municipalcodeonline.com/book/print?type=fees returns HTTP 200 with the complete Consolidated Fee Schedule as server-rendered HTML (~265KB, 644 dollar figures). The schedule read this pass is EFFECTIVE JULY 1, 2026, most recently amended by Res. 26-06-06 on 6/18/2026. Every stored figure in this row was confirmed verbatim against it, on the same line as its own label, including the eight 1997 UBC Table 1-A valuation brackets and the 35 percent multi-family / 55 percent commercial / 10 percent duplicate-plan check percentages that no prior pass could confirm. No figure changed. SUPERSEDES THE STANDING ADVICE ABOVE: scraping this host is NOT waste - use the /book/print?type=fees route, not /book, and not WebFetch.
Source: published fee schedule · Verified 9/18/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Plan review fee on a roofing permit There is no plan review fee. | see rule |
○Application deposit, all residential types Flat fee $25.00 | $25.00 |
○Building permit fee, valuation $1.00 to $500 Flat fee $23.50 | $23.50 |
Building permit fee, valuation $500.01 to $2,000 $23.50 for first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Building permit fee, valuation $2,000.01 to $25,000 $69.25 for first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Building permit fee, valuation $25,000.01 to $50,000 $391.25 for the first $25,000.00, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00 | see rule |
Building permit fee, valuation $50,000.01 to $100,000 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 | see rule |
○Building permit fee, valuation $100,000.01 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Building permit fee, valuation $500,000.01 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,233.75 applies | $3,233.75 |
Building permit fee, valuation $1,000,000.01 and up $5,608.75 for first $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof | see rule |
Plan check fee - residential · add-on 25% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - multi-family · add-on 35% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - commercial · add-on 55% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, review of duplicate plans · add-on 10% of permit fee — select the permit fee line above to calculate | see rule |
State fee · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Inspection fee Flat fee $65.00 | $65.00 |
○Residential plan review deposit (applied to total plan review charge) Flat fee $25.00 | $25.00 |
○Commercial plan review deposit Flat fee $1,000.00 | $1,000.00 |
Unpermitted building improvements 2x the building permit fee | see rule |
How this jurisdiction calculates the fee
Roofing permits are charged from the valuation-based building permit fee table in the consolidated fee schedule plus the 1 percent state fee. The Roofing Requirements page states there is no plan review fee on a roofing permit. A $25 residential application deposit is collected at submittal and applied toward the total. | 2026-09-14 (lane B run 1083): BLOCKAGE CLEARED, CITED DOCUMENT NOW FULLY READABLE. The AngularJS shell at kaysville.municipalcodeonline.com/book?type=fees is bypassed by its own print view: GET https://kaysville.municipalcodeonline.com/book/print?type=fees returns HTTP 200 with the complete Consolidated Fee Schedule as server-rendered HTML (~265KB, 644 dollar figures). The schedule read this pass is EFFECTIVE JULY 1, 2026, most recently amended by Res. 26-06-06 on 6/18/2026. Every stored figure in this row was confirmed verbatim against it, on the same line as its own label, including the eight 1997 UBC Table 1-A valuation brackets and the 35 percent multi-family / 55 percent commercial / 10 percent duplicate-plan check percentages that no prior pass could confirm. No figure changed. SUPERSEDES THE STANDING ADVICE ABOVE: scraping this host is NOT waste - use the /book/print?type=fees route, not /book, and not WebFetch.
Source: published fee schedule · Verified 9/18/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, valuation $1.00 to $500 Flat fee $23.50 | $23.50 |
Building permit fee, valuation $500.01 to $2,000 $23.50 for first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Building permit fee, valuation $2,000.01 to $25,000 $69.25 for first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Building permit fee, valuation $25,000.01 to $50,000 $391.25 for the first $25,000.00, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00 | see rule |
Building permit fee, valuation $50,000.01 to $100,000 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 | see rule |
○Building permit fee, valuation $100,000.01 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Building permit fee, valuation $500,000.01 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,233.75 applies | $3,233.75 |
Building permit fee, valuation $1,000,000.01 and up $5,608.75 for first $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof | see rule |
Plan check fee - residential · add-on 25% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - multi-family · add-on 35% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - commercial · add-on 55% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, review of duplicate plans · add-on 10% of permit fee — select the permit fee line above to calculate | see rule |
State fee · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Inspection fee Flat fee $65.00 | $65.00 |
○Residential plan review deposit (applied to total plan review charge) Flat fee $25.00 | $25.00 |
○Commercial plan review deposit Flat fee $1,000.00 | $1,000.00 |
Unpermitted building improvements 2x the building permit fee | see rule |
How this jurisdiction calculates the fee
Retaining wall permits are charged from the valuation-based building permit fee table in the consolidated fee schedule, plus the residential plan check percentage and the 1 percent state fee. A $25 residential application deposit is collected at submittal and applied toward the total. | 2026-09-14 (lane B run 1083): BLOCKAGE CLEARED, CITED DOCUMENT NOW FULLY READABLE. The AngularJS shell at kaysville.municipalcodeonline.com/book?type=fees is bypassed by its own print view: GET https://kaysville.municipalcodeonline.com/book/print?type=fees returns HTTP 200 with the complete Consolidated Fee Schedule as server-rendered HTML (~265KB, 644 dollar figures). The schedule read this pass is EFFECTIVE JULY 1, 2026, most recently amended by Res. 26-06-06 on 6/18/2026. Every stored figure in this row was confirmed verbatim against it, on the same line as its own label, including the eight 1997 UBC Table 1-A valuation brackets and the 35 percent multi-family / 55 percent commercial / 10 percent duplicate-plan check percentages that no prior pass could confirm. No figure changed. SUPERSEDES THE STANDING ADVICE ABOVE: scraping this host is NOT waste - use the /book/print?type=fees route, not /book, and not WebFetch. | 2026-09-24 (lane B run 1728) CARRIED-FORWARD ITEMS CLOSED. Run 1482 left the four Kaysville rows unstamped because four figures on this row could not be verified from the Consolidated Fee Schedule alone. All four were read verbatim today on the city's own Building Permit Fees page (kaysville.gov/749): "Central Davis Sewer: $2,400", "North Davis Sewer: $3,454.03", "Residential Solar: Fees: $260" and "Basement Finishes and Remodel Fees: $245.70". The Consolidated Fee Schedule itself (Effective July 1, 2026, latest amendment Res. 26-06-06 of 6/18/2026, unchanged from the 2026-09-18 pass) confirms the whole 1997 UBC valuation ladder, the 25/35/55/10 percent plan-check percentages, the 1 percent state fee, the $65.00 inspection fee, the $25.00 residential and $1,000.00 commercial plan-review deposits, the 2x unpermitted-improvement fee, "Existing Residential Structure (Remodels) $50.00 / $10.00 for each $1,000 or fraction thereof in valuation", "Manufactured Homes, Basement Finishes $195.00", pools $260.00, tubs and spas $130.00, the $1,500.00 and $500.00 and $200.00 construction bonds, the parks impact fees $4,480.00 and $2,742.00, water impact $769.00 and $1,282.00, connection and meter $345.00 and $400.00, roadway $1,330.00, fire facilities $296.00 and public safety $356.00. NO FIGURE CHANGED.
Source: published fee schedule · Verified 9/24/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, valuation $1.00 to $500 Flat fee $23.50 | $23.50 |
Building permit fee, valuation $500.01 to $2,000 $23.50 for first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Building permit fee, valuation $2,000.01 to $25,000 $69.25 for first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Building permit fee, valuation $25,000.01 to $50,000 $391.25 for the first $25,000.00, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00 | see rule |
Building permit fee, valuation $50,000.01 to $100,000 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00 | see rule |
○Building permit fee, valuation $100,000.01 to $500,000 $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Building permit fee, valuation $500,000.01 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,233.75 applies | $3,233.75 |
Building permit fee, valuation $1,000,000.01 and up $5,608.75 for first $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof | see rule |
Plan check fee - residential · add-on 25% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - multi-family · add-on 35% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee - commercial · add-on 55% of permit fee — select the permit fee line above to calculate | see rule |
Plan check fee, review of duplicate plans · add-on 10% of permit fee — select the permit fee line above to calculate | see rule |
State fee · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Inspection fee Flat fee $65.00 | $65.00 |
○Residential plan review deposit (applied to total plan review charge) Flat fee $25.00 | $25.00 |
○Commercial plan review deposit Flat fee $1,000.00 | $1,000.00 |
Unpermitted building improvements 2x the building permit fee | see rule |
○Construction bond - additions, detached garages, accessory buildings and swimming pools Flat fee $500.00 | $500.00 |
How this jurisdiction calculates the fee
Accessory building permits are charged from the valuation-based building permit fee table in the consolidated fee schedule, plus the residential plan check percentage and the 1 percent state fee. Detached garages and accessory buildings also carry a $500 construction bond. A $25 residential application deposit is collected at submittal and applied toward the total. | 2026-09-14 (lane B run 1068): ROW DELIBERATELY NOT STAMPED - CITED DOCUMENT UNREADABLE. kaysville.municipalcodeonline.com/book?type=fees returns HTTP 200 but is an AngularJS shell: the served HTML is ~2.4KB of template with no fee data, and WebFetch on the same URL returns only interface elements, so the Consolidated Fee Schedule cannot be read by any non-browser client. No data endpoint was found (/api/book, /Home/GetBook, /book/gettoc, /Book/GetSections all 404). The city's own kaysville.gov/749/Building-Permit-Fees page WAS read in full and corroborates the fee basis and every flat amount stored elsewhere for Kaysville ($65.65 furnace/AC/water heater, $245.70 basement, $195 electrical service upgrade, $535.60 power extension, power impact fees $954/$1,272/$1,500/$1,908, $25 residential application deposit, $1,500 and $500 construction bonds, $260 pools, $260 residential solar, all impact-fee lines), plus "Building Permit fee is based on Valuation ... plus a 1% State education fee and a 25% plan check fee". What could NOT be confirmed line-by-line is the valuation fee table itself (the 1997 UBC Table 1-A amounts) and the 35%/55% multi-family and commercial plan-check percentages. Nothing was changed and nothing was guessed. FOR FUTURE PASSES: either accept kaysville.gov as the source of record for this jurisdiction and re-point fee_source_url there, or find a PDF export of the code book; re-scraping municipalcodeonline with curl or WebFetch is waste. | 2026-09-14 (lane B run 1083): BLOCKAGE CLEARED, CITED DOCUMENT NOW FULLY READABLE. The AngularJS shell at kaysville.municipalcodeonline.com/book?type=fees is bypassed by its own print view: GET https://kaysville.municipalcodeonline.com/book/print?type=fees returns HTTP 200 with the complete Consolidated Fee Schedule as server-rendered HTML (~265KB, 644 dollar figures). The schedule read this pass is EFFECTIVE JULY 1, 2026, most recently amended by Res. 26-06-06 on 6/18/2026. Every stored figure in this row was confirmed verbatim against it, on the same line as its own label, including the eight 1997 UBC Table 1-A valuation brackets and the 35 percent multi-family / 55 percent commercial / 10 percent duplicate-plan check percentages that no prior pass could confirm. No figure changed. SUPERSEDES THE STANDING ADVICE ABOVE: scraping this host is NOT waste - use the /book/print?type=fees route, not /book, and not WebFetch. | 2026-09-24 (lane B run 1728) CARRIED-FORWARD ITEMS CLOSED. Run 1482 left the four Kaysville rows unstamped because four figures on this row could not be verified from the Consolidated Fee Schedule alone. All four were read verbatim today on the city's own Building Permit Fees page (kaysville.gov/749): "Central Davis Sewer: $2,400", "North Davis Sewer: $3,454.03", "Residential Solar: Fees: $260" and "Basement Finishes and Remodel Fees: $245.70". The Consolidated Fee Schedule itself (Effective July 1, 2026, latest amendment Res. 26-06-06 of 6/18/2026, unchanged from the 2026-09-18 pass) confirms the whole 1997 UBC valuation ladder, the 25/35/55/10 percent plan-check percentages, the 1 percent state fee, the $65.00 inspection fee, the $25.00 residential and $1,000.00 commercial plan-review deposits, the 2x unpermitted-improvement fee, "Existing Residential Structure (Remodels) $50.00 / $10.00 for each $1,000 or fraction thereof in valuation", "Manufactured Homes, Basement Finishes $195.00", pools $260.00, tubs and spas $130.00, the $1,500.00 and $500.00 and $200.00 construction bonds, the parks impact fees $4,480.00 and $2,742.00, water impact $769.00 and $1,282.00, connection and meter $345.00 and $400.00, roadway $1,330.00, fire facilities $296.00 and public safety $356.00. NO FIGURE CHANGED.
Source: published fee schedule · Verified 9/24/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Furnace, A/C, water heater permit Flat fee $65.65 | $65.65 |
○Application deposit, all residential types Flat fee $25.00 | $25.00 |
How this jurisdiction calculates the fee
The city publishes a single flat fee covering furnace, air conditioning and water heater permits. The Building Permit Fees page notes that tankless water heaters require a review fee.
Source: published fee schedule · Verified 11/9/2026
See the full write-up: Kaysville building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.