Home / Calculators / Building Permit Fee Calculator

Cottonwood Heights, Utah Building Permit Cost Calculator

Estimates permit cost in Cottonwood Heights from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
Plan review fee (residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
Plan review fee (non-residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
○Demolition permit
Flat fee $47.47
$47.47
Grading permit · add-on
100% of IBC schedule — select the permit fee line above to calculate
see rule
○Public works inspection fee
Flat fee $150.00
$150.00
○Public works reinspection (if needed)
Flat fee $200.00
$200.00
○Authorized weekend inspection
Flat fee $75.00
$75.00
○Bond release inspection fee
Flat fee $100.00
$100.00
○Bond release reinspection fee
Flat fee $100.00
$100.00
○Right of way permit application
Flat fee $300.00
$300.00
○Road cuts
$7.50 x 2,000 = $15,000.00
$15,000.00
Stop work order fee (no permit) · add-on
200% of the above calculated fees plus $500 — select the permit fee line above to calculate
see rule
○Stop work order (other)
Flat fee $200.00
$200.00
○Stormwater Pollution Prevention Plan (SWPPP)
Flat fee $1,500.00
$1,500.00
How this jurisdiction calculates the fee

Valuation-based by reference to the IBC building valuation data table; the city publishes no dollar table of its own. Plan review and trade permits are charged as percentages of the base building permit fee.

Source: published fee schedule · Verified 9/18/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
Plan review fee (residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
Stop work order fee (work started without a permit) · add-on
200% of the above calculated fees plus $500 — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cottonwood Heights publishes no flat deck permit fee and no dollar valuation table of its own. The Consolidated Fee Schedule sets the building permit fee at 100% of the building valuation data table from the most current version of the International Building Code adopted in Utah, with plan review at 65% of the base building permit fee. Where the city cannot practically apply the fee schedule, the building official determines the fee.

Source: published fee schedule · Verified 9/14/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Electrical, mechanical and plumbing fees
Each is 5% of base building permit fee when applying with the building permit. If you apply separately, fee follows the IBC schedule
see rule
How this jurisdiction calculates the fee

Percentage of the base building permit fee when applied for together with the building permit; otherwise by IBC schedule. Published in the BUILDING FEES (Code Title 15) section of the city fee schedule.

Source: published fee schedule · Verified 9/18/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
Plan review fee (residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
Stop work order fee (work started without a permit) · add-on
200% of the above calculated fees plus $500 — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cottonwood Heights publishes no flat fence permit fee and no dollar valuation table of its own. Where a fence requires a building permit, the Consolidated Fee Schedule sets the building permit fee at 100% of the building valuation data table from the most current version of the International Building Code adopted in Utah, with plan review at 65% of the base building permit fee. Where the city cannot practically apply the fee schedule, the building official determines the fee.

Source: published fee schedule · Verified 9/14/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
Plan review fee (residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
Stop work order fee (work started without a permit) · add-on
200% of the above calculated fees plus $500 — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cottonwood Heights publishes no flat reroofing permit fee and no dollar valuation table of its own. The Consolidated Fee Schedule sets the building permit fee at 100% of the building valuation data table from the most current version of the International Building Code adopted in Utah, with plan review at 65% of the base building permit fee. Where the city cannot practically apply the fee schedule, the building official determines the fee.

Source: published fee schedule · Verified 9/14/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
Plan review fee (residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
Grading permit · add-on
100% of IBC schedule — select the permit fee line above to calculate
see rule
Stop work order fee (work started without a permit) · add-on
200% of the above calculated fees plus $500 — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cottonwood Heights publishes no flat retaining wall permit fee and no dollar valuation table of its own. The Consolidated Fee Schedule sets the building permit fee at 100% of the building valuation data table from the most current version of the International Building Code adopted in Utah, with plan review at 65% of the base building permit fee. A separate grading permit, also charged at 100% of the IBC schedule, may apply where the work involves grading. Where the city cannot practically apply the fee schedule, the building official determines the fee. === 2026-10-01 DELIBERATELY HELD UNSTAMPED, DOCUMENT BLOCKED AT THE EDGE. The cited URL was probed twice today, first with curl and then from a real headless-Chromium browser context with a current desktop user agent, and BOTH returned HTTP 403 from Akamai with an errors.edgesuite.net reference, not a 404. Per the lane rule, trust a 404 and never a 403: this is the edge refusing our CLIENT, and it proves nothing whatever about whether the path, the document or the figures still exist. No CAPTCHA or proof-of-work challenge was solved and none will be. This row was therefore left untouched and unstamped rather than guessed at, so it sorts to the front of the next rotation. ESCALATION FOR A HUMAN: this jurisdiction has now been unreadable to automated verification across passes, so its figures cannot be confirmed or refuted by this lane at all while the edge block holds. It needs either a one-off manual read of the schedule, or an agreed residential-IP or allow-listed fetch path, before its public "verified" date can honestly advance. Candidate next step for an automated pass: look for the same schedule mirrored on a non-Akamai host (an agenda packet, a council resolution PDF, or a state-level aggregator on a .gov domain), which would give a citable official source without fighting the edge.

Source: published fee schedule · Verified 9/14/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
Plan review fee (residential) · add-on
65% of base building permit — select the permit fee line above to calculate
see rule
Stop work order fee (work started without a permit) · add-on
200% of the above calculated fees plus $500 — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cottonwood Heights publishes no flat shed or accessory structure permit fee and no dollar valuation table of its own. Where a permit is required, the Consolidated Fee Schedule sets the building permit fee at 100% of the building valuation data table from the most current version of the International Building Code adopted in Utah, with plan review at 65% of the base building permit fee. Where the city cannot practically apply the fee schedule, the building official determines the fee.

Source: published fee schedule · Verified 9/14/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Electrical, mechanical and plumbing fees
Each is 5% of base building permit fee when applying with the building permit. If you apply separately, fee follows the IBC schedule
see rule
Base building permit fee · add-on
100% of the building valuation data table from the most current version of the international building code (IBC) adopted in Utah — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cottonwood Heights publishes no flat water heater fee. A water heater replacement is a plumbing permit, and the Consolidated Fee Schedule charges electrical, mechanical and plumbing permits at 5% of the base building permit fee each when they are applied for together with the building permit; when applied for separately the fee follows the IBC schedule. The base building permit fee is 100% of the building valuation data table from the most current version of the International Building Code adopted in Utah. Where the city cannot practically apply the fee schedule, the building official determines the fee.

Source: published fee schedule · Verified 9/14/2026

See the full write-up: Cottonwood Heights building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.