Home / Calculators / Building Permit Fee Calculator

Cedar City, Utah Building Permit Cost Calculator

Estimates permit cost in Cedar City from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 to $500
Flat fee $24.00
$24.00
Total valuation $501 to $2,000
$24 for the first $500; plus $3 for each additional $100 or fraction therof, to and including $2,000.
see rule
Total valuation $2,001 to $40,000
$69 for the first $2,000; plus $11 for each additional $1,000 or fraction thereof, to and including $40,000
see rule
Total valuation $40,001 to $100,000
$487 for the first $40,000; plus $9 for each additional $1,000 or fraction thereof, to and including $100,000
see rule
Total valuation $100,001 to $500,000
$1,027 for the first $100,000; plus $7 for each additional $1,000 or fraction thereof, to and including $500,000.
see rule
Total valuation $500,001 to $1,000,000
$3,827 for the first $500,000; plus $5 for each additional $1,000 or fraction thereof, to and including $1,000,000.
see rule
Total valuation $1,000,001 and over
$6,387 for the first $1,000,000; plus $4 for each additional $1,000 or fraction thereof.
see rule
Plan Review · add-on
30% of Building Permit — select the permit fee line above to calculate
see rule
Utah State Fee · add-on
1% of Building Permit — select the permit fee line above to calculate
see rule
○Re-inspection
Flat fee $50.00
$50.00
○Inspection (not part of a building permit)
Flat fee $50.00
$50.00
○Revised Plan Review
Flat fee $50.00
$50.00
Building valuation - Remodel
$50.00 per Sq foot
see rule
Building valuation - Basement Finish
$50.00 per Sq foot
see rule
Building valuation - New Construction
As set by ICC Building Valuation Data Table August 2011
see rule
How this jurisdiction calculates the fee

Cedar City sets a valuation first, then runs it through the Building Permit Calculation Table in the Consolidated Fee Schedule. New construction valuation comes from the ICC Building Valuation Data Table (August 2011 edition as cited in the schedule); remodels, basement finishes and tenant improvements are valued at $50.00 per square foot; electrical, mechanical and plumbing work each carry a fixed $50.00 valuation; solar and retaining walls use the contractor's estimate; grading and excavation use the engineer's estimate. Plan review adds 30% of the building permit fee and the Utah state surcharge adds 1%. No bond is required at permit issuance.

Source: published fee schedule · Verified 11/9/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building Permit Calculation Table - valuation $1 to $500
Flat fee $24.00
$24.00
○Building Permit Calculation Table - valuation $501 to $2,000: $24 for the first $500, plus $3 for each additional $100 or fraction thereof, to and including $2,000
Flat fee $24.00
$24.00
○Building Permit Calculation Table - valuation $2,001 to $40,000: $69 for the first $2,000, plus $11 for each additional $1,000
Flat fee $69.00
$69.00
○Building Permit Calculation Table - valuation $40,001 to $100,000: $487 for the first $40,000, plus $9 for each additional $1,000
Flat fee $487.00
$487.00
Plan Review · add-on
30% of Building Permit — select the permit fee line above to calculate
see rule
Utah State Fee · add-on
1% of Building Permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

No separate deck fee line is published. Cedar City's Consolidated Fee Schedule prices deck work through the general Building Permit Calculation Table, which is driven by project valuation. The city's Fee Estimate Request form (https://www.cedarcityut.gov/DocumentCenter/View/14851/Estimate-of-Fees) confirms decks are an estimated project type, listing 'Covered Deck', 'Uncovered Deck' and 'Patio Cover' as selectable project types and a project-description field reading 'Deck, Patio, Shed or etc.' On top of the calculated building permit amount the schedule adds Plan Review at 30% of the Building Permit and a Utah State Fee at 1% of the Building Permit. Separate Electrical, Plumbing and Mechanical fees apply only if that work is included. Fee schedule header reads 'LAST UPDATED 24-Jun-26'.

Source: published fee schedule · Verified 11/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building valuation - Electrical (service upgrade, new meter base, etc.)
Flat fee $50.00
$50.00
○Permit fee for total valuation $1 to $500
Flat fee $24.00
$24.00
Plan Review · add-on
30% of Building Permit — select the permit fee line above to calculate
see rule
Utah State Fee · add-on
1% of Building Permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

The fee schedule assigns a fixed building valuation of $50.00 to electrical work such as a service upgrade or new meter base; the permit fee is then read off the Building Permit Calculation Table, with plan review at 30% and the Utah state fee at 1%.

Source: published fee schedule · Verified 11/9/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building Permit Calculation Table - valuation $1 to $500
Flat fee $24.00
$24.00
Building Permit Calculation Table - valuation $501 to $2,000
$24 for the first $500, plus $3 for each additional $100 or fraction thereof, to and including $2,000
see rule
○Building Permit Calculation Table - valuation $2,001 to $40,000
$69.00 for the first $2,000.00, plus 248 x $11.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,797.00
$2,797.00
Plan Review · add-on
30% of Building Permit — select the permit fee line above to calculate
see rule
Utah State Fee · add-on
1% of Building Permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Cedar City's Consolidated Fee Schedule publishes no fence permit fee. | 2026-09-14 (lane B run 1068): examples populated from the Cedar City Consolidated Fee Schedule (cedarcityut.gov/DocumentCenter/View/18323), downloaded and read in full this pass with curl + pdftotext -layout. Cedar City prints no fence permit line, so where a permit is required the published price is the general Building Permit Calculation Table plus the plan review and state percentages, all read verbatim from that schedule. No fence-specific figure was guessed.

Source: published fee schedule · Verified 11/9/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building valuation - Retaining Walls
Contractor's Estimate
see rule
Plan Review · add-on
30% of Building Permit — select the permit fee line above to calculate
see rule
Utah State Fee · add-on
1% of Building Permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Retaining walls are valued at the contractor's estimate, and that valuation is run through the Building Permit Calculation Table, plus 30% plan review and the 1% Utah state fee.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 to $500
Flat fee $24.00
$24.00
Total valuation $501 to $2,000
$24 for the first $500; plus $3 for each additional $100 or fraction therof, to and including $2,000.
see rule
Total valuation $2,001 to $40,000
$69 for the first $2,000; plus $11 for each additional $1,000 or fraction thereof, to and including $40,000
see rule
Total valuation $40,001 to $100,000
$487 for the first $40,000; plus $9 for each additional $1,000 or fraction thereof, to and including $100,000
see rule
Total valuation $100,001 to $500,000
$1,027 for the first $100,000; plus $7 for each additional $1,000 or fraction thereof, to and including $500,000.
see rule
Total valuation $500,001 to $1,000,000
$3,827 for the first $500,000; plus $5 for each additional $1,000 or fraction thereof, to and including $1,000,000.
see rule
Total valuation $1,000,001 and over
$6,387 for the first $1,000,000; plus $4 for each additional $1,000 or fraction thereof.
see rule
How this jurisdiction calculates the fee

Cedar City sets a valuation first, then runs it through the Building Permit Calculation Table in the Consolidated Fee Schedule. New construction valuation comes from the ICC Building Valuation Data Table (August 2011 edition as cited in the schedule); remodels, basement finishes and tenant improvements are valued at $50.00 per square foot; electrical, mechanical and plumbing work each carry a fixed $50.00 valuation; solar and retaining walls use the contractor's estimate; grading and excavation use the engineer's estimate. Plan review adds 30% of the building permit fee and the Utah state surcharge adds 1%. No bond is required at permit issuance.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building valuation - Plumbing (water heater, etc.)
Flat fee $50.00
$50.00
○Permit fee for total valuation $1 to $500
Flat fee $24.00
$24.00
Plan Review · add-on
30% of Building Permit — select the permit fee line above to calculate
see rule
Utah State Fee · add-on
1% of Building Permit — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

The fee schedule assigns a fixed building valuation of $50.00 to plumbing work such as a water heater; the permit fee is then read off the Building Permit Calculation Table, with plan review at 30% and the Utah state fee at 1%.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Cedar City building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.