Cedar City, Utah Building Permit Cost Calculator
Estimates permit cost in Cedar City from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1 to $500 Flat fee $24.00 | $24.00 |
Total valuation $501 to $2,000 $24 for the first $500; plus $3 for each additional $100 or fraction therof, to and including $2,000. | see rule |
Total valuation $2,001 to $40,000 $69 for the first $2,000; plus $11 for each additional $1,000 or fraction thereof, to and including $40,000 | see rule |
Total valuation $40,001 to $100,000 $487 for the first $40,000; plus $9 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
Total valuation $100,001 to $500,000 $1,027 for the first $100,000; plus $7 for each additional $1,000 or fraction thereof, to and including $500,000. | see rule |
Total valuation $500,001 to $1,000,000 $3,827 for the first $500,000; plus $5 for each additional $1,000 or fraction thereof, to and including $1,000,000. | see rule |
Total valuation $1,000,001 and over $6,387 for the first $1,000,000; plus $4 for each additional $1,000 or fraction thereof. | see rule |
Plan Review · add-on 30% of Building Permit — select the permit fee line above to calculate | see rule |
Utah State Fee · add-on 1% of Building Permit — select the permit fee line above to calculate | see rule |
○Re-inspection Flat fee $50.00 | $50.00 |
○Inspection (not part of a building permit) Flat fee $50.00 | $50.00 |
○Revised Plan Review Flat fee $50.00 | $50.00 |
Building valuation - Remodel $50.00 per Sq foot | see rule |
Building valuation - Basement Finish $50.00 per Sq foot | see rule |
Building valuation - New Construction As set by ICC Building Valuation Data Table August 2011 | see rule |
How this jurisdiction calculates the fee
Cedar City sets a valuation first, then runs it through the Building Permit Calculation Table in the Consolidated Fee Schedule. New construction valuation comes from the ICC Building Valuation Data Table (August 2011 edition as cited in the schedule); remodels, basement finishes and tenant improvements are valued at $50.00 per square foot; electrical, mechanical and plumbing work each carry a fixed $50.00 valuation; solar and retaining walls use the contractor's estimate; grading and excavation use the engineer's estimate. Plan review adds 30% of the building permit fee and the Utah state surcharge adds 1%. No bond is required at permit issuance.
Source: published fee schedule · Verified 11/9/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building Permit Calculation Table - valuation $1 to $500 Flat fee $24.00 | $24.00 |
○Building Permit Calculation Table - valuation $501 to $2,000: $24 for the first $500, plus $3 for each additional $100 or fraction thereof, to and including $2,000 Flat fee $24.00 | $24.00 |
○Building Permit Calculation Table - valuation $2,001 to $40,000: $69 for the first $2,000, plus $11 for each additional $1,000 Flat fee $69.00 | $69.00 |
○Building Permit Calculation Table - valuation $40,001 to $100,000: $487 for the first $40,000, plus $9 for each additional $1,000 Flat fee $487.00 | $487.00 |
Plan Review · add-on 30% of Building Permit — select the permit fee line above to calculate | see rule |
Utah State Fee · add-on 1% of Building Permit — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
No separate deck fee line is published. Cedar City's Consolidated Fee Schedule prices deck work through the general Building Permit Calculation Table, which is driven by project valuation. The city's Fee Estimate Request form (https://www.cedarcityut.gov/DocumentCenter/View/14851/Estimate-of-Fees) confirms decks are an estimated project type, listing 'Covered Deck', 'Uncovered Deck' and 'Patio Cover' as selectable project types and a project-description field reading 'Deck, Patio, Shed or etc.' On top of the calculated building permit amount the schedule adds Plan Review at 30% of the Building Permit and a Utah State Fee at 1% of the Building Permit. Separate Electrical, Plumbing and Mechanical fees apply only if that work is included. Fee schedule header reads 'LAST UPDATED 24-Jun-26'.
Source: published fee schedule · Verified 11/9/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation - Electrical (service upgrade, new meter base, etc.) Flat fee $50.00 | $50.00 |
○Permit fee for total valuation $1 to $500 Flat fee $24.00 | $24.00 |
Plan Review · add-on 30% of Building Permit — select the permit fee line above to calculate | see rule |
Utah State Fee · add-on 1% of Building Permit — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The fee schedule assigns a fixed building valuation of $50.00 to electrical work such as a service upgrade or new meter base; the permit fee is then read off the Building Permit Calculation Table, with plan review at 30% and the Utah state fee at 1%.
Source: published fee schedule · Verified 11/9/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building Permit Calculation Table - valuation $1 to $500 Flat fee $24.00 | $24.00 |
Building Permit Calculation Table - valuation $501 to $2,000 $24 for the first $500, plus $3 for each additional $100 or fraction thereof, to and including $2,000 | see rule |
○Building Permit Calculation Table - valuation $2,001 to $40,000 $69.00 for the first $2,000.00, plus 248 x $11.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,797.00 | $2,797.00 |
Plan Review · add-on 30% of Building Permit — select the permit fee line above to calculate | see rule |
Utah State Fee · add-on 1% of Building Permit — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Cedar City's Consolidated Fee Schedule publishes no fence permit fee. | 2026-09-14 (lane B run 1068): examples populated from the Cedar City Consolidated Fee Schedule (cedarcityut.gov/DocumentCenter/View/18323), downloaded and read in full this pass with curl + pdftotext -layout. Cedar City prints no fence permit line, so where a permit is required the published price is the general Building Permit Calculation Table plus the plan review and state percentages, all read verbatim from that schedule. No fence-specific figure was guessed.
Source: published fee schedule · Verified 11/9/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Building valuation - Retaining Walls Contractor's Estimate | see rule |
Plan Review · add-on 30% of Building Permit — select the permit fee line above to calculate | see rule |
Utah State Fee · add-on 1% of Building Permit — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Retaining walls are valued at the contractor's estimate, and that valuation is run through the Building Permit Calculation Table, plus 30% plan review and the 1% Utah state fee.
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1 to $500 Flat fee $24.00 | $24.00 |
Total valuation $501 to $2,000 $24 for the first $500; plus $3 for each additional $100 or fraction therof, to and including $2,000. | see rule |
Total valuation $2,001 to $40,000 $69 for the first $2,000; plus $11 for each additional $1,000 or fraction thereof, to and including $40,000 | see rule |
Total valuation $40,001 to $100,000 $487 for the first $40,000; plus $9 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
Total valuation $100,001 to $500,000 $1,027 for the first $100,000; plus $7 for each additional $1,000 or fraction thereof, to and including $500,000. | see rule |
Total valuation $500,001 to $1,000,000 $3,827 for the first $500,000; plus $5 for each additional $1,000 or fraction thereof, to and including $1,000,000. | see rule |
Total valuation $1,000,001 and over $6,387 for the first $1,000,000; plus $4 for each additional $1,000 or fraction thereof. | see rule |
How this jurisdiction calculates the fee
Cedar City sets a valuation first, then runs it through the Building Permit Calculation Table in the Consolidated Fee Schedule. New construction valuation comes from the ICC Building Valuation Data Table (August 2011 edition as cited in the schedule); remodels, basement finishes and tenant improvements are valued at $50.00 per square foot; electrical, mechanical and plumbing work each carry a fixed $50.00 valuation; solar and retaining walls use the contractor's estimate; grading and excavation use the engineer's estimate. Plan review adds 30% of the building permit fee and the Utah state surcharge adds 1%. No bond is required at permit issuance.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building valuation - Plumbing (water heater, etc.) Flat fee $50.00 | $50.00 |
○Permit fee for total valuation $1 to $500 Flat fee $24.00 | $24.00 |
Plan Review · add-on 30% of Building Permit — select the permit fee line above to calculate | see rule |
Utah State Fee · add-on 1% of Building Permit — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The fee schedule assigns a fixed building valuation of $50.00 to plumbing work such as a water heater; the permit fee is then read off the Building Permit Calculation Table, with plan review at 30% and the Utah state fee at 1%.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Cedar City building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.