B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Murray, Utah Building Permit Cost Calculator

Estimates permit cost in Murray from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1.00 to $500.00
Flat fee $100.00
$100.00
Total valuation $501.00 to $2,000.00
$100.00 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$150.00 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Total valuation $25,001.00 to $50,000.00
$391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
see rule
Total valuation $50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
see rule
○Total valuation $100,001.00 to $500,000.00
$993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75
$1,833.75
○Total valuation $500,001.00 to $1,000,000.00
$250,000.00 is within the first $500,000.00, so the base $3,233.75 applies
$3,233.75
○Total valuation $1,000,001.00 and up
$250,000.00 is within the first $1,000,000.00, so the base $5,608.75 applies
$5,608.75
○Valuation addition - SFD Addition to Existing
Flat fee $175.92
$175.92
○Valuation addition - SFD New Finished Basement
Flat fee $43.33
$43.33
○Valuation addition - SFD New Unfinished Basement
Flat fee $31.50
$31.50
○Valuation addition - SFD Existing Finished Basement
Flat fee $20.78
$20.78
○Valuation addition - Garage (Private Wood Frame)
Flat fee $71.07
$71.07
○Valuation addition - Carport
Flat fee $44.63
$44.63
○Valuation addition - SFD Covered Porch
Flat fee $44.63
$44.63
○Valuation addition - Mall Tenant Finish
Flat fee $65.55
$65.55
Basement Finish, residential
**BOV + *PRF 50%
see rule
Swimming Pool, residential / commercial
**BOV + *PRF 50% / **BOV + *PRF 65%
see rule
○Manufactured Home
Flat fee $350.00
$350.00
Solar Roof & Ground Mounted, residential / commercial
$394 / **BOV + 65% *PRF
see rule
Energy Storage System (ESS)
$300 + $20 ea addtl
see rule
EV Chargers, residential
$300 + $20 ea addtl
see rule
Inspections outside of normal business hours
$100 / Hour (Min 2 Hrs)
see rule
○Onsite Consultation
Flat fee $160.00
$160.00
○ReInspection Fee
Flat fee $100.00
$100.00
○Inspections for which no fee is specifically indicated
Flat fee $100.00
$100.00
Additional plan review required by changes, additions or revisions to plans
$80.00 / Hour (1/2 hr min)
see rule
○Reinstatement of permit - voluntary request or one phone call
Flat fee $100.00
$100.00
○Reinstatement of permit - one or more letters sent out
Flat fee $250.00
$250.00
○Reinstatement of permit - letters sent & Certificate of Non-Compliance filed
Flat fee $400.00
$400.00
Stop Work
Double Permit Fee
see rule
How this jurisdiction calculates the fee

Building permit fee is computed from a tiered table applied to total valuation, used for both commercial and residential work. Valuation is drawn from ICC Building Valuation Data February 2026 plus Murray's own per-square-foot additions. Plan review is added as a percentage of the permit fee that depends on the work type.

Source: published fee schedule · Verified 11/6/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation addition - Deck (U-5B)
Flat fee $21.66
$21.66
○Valuation addition - Carport (U-5B)
Flat fee $44.63
$44.63
○Valuation addition - SFD Covered Porch (U-5B)
Flat fee $44.63
$44.63
How this jurisdiction calculates the fee

Decks are priced by valuation rather than a flat fee. The fee sheet publishes a per-square-foot valuation figure for decks, which is run through the tiered valuation-based building permit fee table.

Source: published fee schedule · Verified 11/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical/Service Upgrade, residential
Flat fee $100.00
$100.00
EV Chargers
$300 + $20 ea addtl
see rule
EV Chargers, commercial
$300 + $20 ea addtl + 65% *PRF
see rule
Energy Storage System (ESS)
$300 + $20 ea addtl
see rule
How this jurisdiction calculates the fee

Residential electrical work and service upgrades are a flat permit fee on the Murray fee sheet. Commercial electrical tied to a valued project is priced by valuation with plan review added.

Source: published fee schedule · Verified 11/9/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, lowest valuation bracket ($1.00 to $500.00 valuation)
Flat fee $100.00
$100.00
○Additional plan review required by changes, additions or revisions to plans
Flat fee $80.00
$80.00
How this jurisdiction calculates the fee

Murray publishes no fence permit fee. The Murray City Building Permit Fees sheet (effective July 1, 2026) lists flat fees for common jobs but states that the fees listed are the more commonly used fees and do not reflect all building permit fees; there is no fence row. All fences require Murray Planning and Zoning approval, and fences 7 feet and taller require a building permit. That permit is priced from the valuation-based Building Permit Fees (Commercial/Residential) table on the same sheet, whose lowest bracket ($1.00 to $500.00 of valuation) is $100.00; valuation is taken from the ICC Building Valuation Data table attached to the sheet. Utah's 1% state surcharge (Utah Code 15A-1-209) applies statewide but is not itemized on the sheet.

Source: published fee schedule · Verified 11/5/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○ReRoof, residential
Flat fee $200.00
$200.00
○ReRoof with sheathing, residential add
Flat fee $100.00
$100.00
ReRoof, commercial
**BOV + 10% *PRF
see rule
○Stucco, Siding, Etc., residential
Flat fee $200.00
$200.00
○Windows, residential
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

Residential re-roofs are a flat permit fee with a flat add-on when sheathing is replaced. Commercial re-roofs are priced by valuation with a 10% plan review fee added.

Source: published fee schedule · Verified 11/9/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plumbing, residential
Flat fee $100.00
$100.00
○Mechanical, residential
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

Water heater replacement falls under Murray's flat residential plumbing permit fee on the Building Permit Fees sheet. Murray does not publish a separate water heater line item.

Source: published fee schedule · Verified 11/9/2026

See the full write-up: Murray building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.