Home / Calculators / Building Permit Fee Calculator

Orem, Utah Building Permit Cost Calculator

Estimates permit cost in Orem from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Building permit
Read from Table 3A of the 1997 Uniform Administrative Code on value from the ICC valuation tables
see rule
Plan review
Lesser of 65% of the permit fee or actual cost
see rule
○Required call-back reinspection
Flat fee $125.00
$125.00
Inspection outside normal working hours
$151.00 plus $88.00 per hour beyond two hours
see rule
Temporary certificate of occupancy, residential
$250.00 with $100.00 refunded if finished within 30 days
see rule
How this jurisdiction calculates the fee

Orem builds a building permit fee from two pieces. Project value comes from the Building Valuation Tables published by the International Code Council, and the fee itself is read from Table 3A of the 1997 Uniform Administrative Code as revised in 2023, with Tables 3B, 3C and 3D added for electrical, plumbing and mechanical work where those apply. Plan review is the lesser of 65 percent of the permit fee or the actual cost. Building without a permit doubles the permit fee including the trade portions. A required call-back reinspection costs $125.00. Inspections outside normal working hours cost $151.00 plus $88.00 per hour beyond two hours. A temporary certificate of occupancy costs $390.00 for commercial and $250.00 for residential, of which $100.00 is refunded if the work finishes within 30 days. SUPERSESSION RULED OUT AT THE EDITION LEVEL, 2026-09-11 (run 757): Orem's FY 2025-2026 adopted budget expired June 30, 2026, which is exactly the pattern this lane watches for, so the successor was searched for directly. orem.gov/city-finances lists NO adopted FY 2026-2027 budget. What it publishes for FY27 is tentative or interim only: "Tentative Budget FY2026-2027" (wp-content/uploads/2026/05/Tentative-Budget-FY-2026-2027.pdf), "FY 2026-2027 Tentative (Interim) Budget Presentation", and a "FY 2026-2027 Citizens' Budget (Based on Interim Budget)". Per lane protocol a TENTATIVE or INTERIM document is not a FINAL ADOPTED one, so the FY 2025-2026 adopted budget cited here remains the last adopted fee authority and this row is NOT superseded. FIGURES NOT RE-CONFIRMED THIS PASS: Orem publishes its fees only inside Exhibit B of the adopted budget PDF, and WebFetch truncates that document around page 70, well before Exhibit B; orem.gov/building and orem.gov/development-services carry no standalone fee schedule. Row therefore left unstamped rather than stamped on an unread document. NEXT PASS: needs one curl + pdftotext -layout read of the budget PDF to reach Exhibit B, and should re-check whether an ADOPTED FY 2026-2027 budget has appeared, which would be a genuine supersession for all eight Orem rows. | 2026-09-14 (lane B run 1131) SUCCESSOR-DOCUMENT CHECK, the point of this lane: Utah FY2027 began 2026-07-01, so the cited FY 2025-2026 Adopted Budget was tested against its successor. orem.gov publishes NO adopted FY 2026-2027 budget; what exists is Tentative-Budget-FY-2026-2027.pdf (2026-05), whose Exhibit B fee schedule prints FY 2026 Adopted and FY 2027 Proposed side by side. EVERY figure this row carries is IDENTICAL in both columns: Table 3A 1997 UAC w/2023 revisions, plan review the lesser of 65% of the permit fee or actual cost, required call-back reinspection $125.00, inspections outside normal working hours $151.00 + $88.00/hour if over 2 hours, residential TCO $250.00 with $100.00 refunded if completed within 30 days. No fee change and no adopted successor, so fee_source_url stays on the FY 2025-2026 Adopted Budget, which remains the schedule in force. Per lane policy the TENTATIVE document was not adopted as the source of record.

Source: published fee schedule · Verified 11/13/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat deck permit fee is published
Not published
see rule
Wood deck lower than 30 inches with no guard and no roof
No permit required
see rule
Deck requiring a permit
Read from Table 3A of the 1997 Uniform Administrative Code
see rule
Plan review
Lesser of 65% of the permit fee or actual cost
see rule
How this jurisdiction calculates the fee

Orem publishes no flat deck permit fee. A deck needs a building permit once its walking surface sits higher than 30 inches off the ground, and it is then priced like other construction, with value taken from the International Code Council Building Valuation Tables and the fee read from Table 3A of the 1997 Uniform Administrative Code as revised in 2023. Plan review is the lesser of 65 percent of the permit fee or the actual cost. A wood deck lower than 30 inches that needs no guard and carries no roof does not require a permit.

Source: published fee schedule · Verified 11/13/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical only permit base fee
Flat fee $40.00
$40.00
Added to the base fee
Amount from Table 3B of the 1997 Uniform Administrative Code
see rule
Changing light fixtures, switches or outlets
No permit required
see rule
Plan review
Lesser of 65% of the permit fee or actual cost
see rule
How this jurisdiction calculates the fee

An electrical only permit in Orem costs a $40.00 base fee plus the amount read from Table 3B of the 1997 Uniform Administrative Code as revised in 2023. When electrical work forms part of a larger building permit its charge is folded into that permit instead. Plan review is the lesser of 65 percent of the permit fee or the actual cost. Replacing light fixtures, switches or outlets does not require a permit. | 2026-09-29 (lane B run 1809) ADOPTION STATUS MOVED, FIGURES DID NOT. The FY 2025-2026 Adopted Budget cited here was re-read and orem.gov/city-finances re-listed in full. Still NO "Adopted Budget FY 2026-2027" PDF exists on the site. What changed since the 2026-09-14 pass: the FY27 Citizens Budget link is now wp-content/uploads/2026/09/FINAL-BUDGET-City-of-Orems-Citizen-Budget-FY27-1.pdf and is labelled plainly "FY 2026-2027 Citizens Budget", where the prior pass recorded it as "(Based on Interim Budget)" - i.e. Orem appears to have moved from interim to finally adopted for FY27, but has published no adopted budget document carrying Exhibit B. That Citizens Budget is a 20-page summary and contains no fee schedule. MATERIALLY THIS CHANGES NOTHING FOR THESE ROWS: Tentative-Budget-FY-2026-2027.pdf Exhibit B prints FY 2026 Adopted and FY 2027 Proposed side by side and the two columns are identical for every figure these rows carry - Table 3A 1997 UAC w/2023 revisions, $40 Base Fee + Table 3B for an Electrical Only Permit, $94.00 miscellaneous/engineering permit, plan review the lesser of 65% of the permit fee or actual cost. So no stored amount is at risk whichever document is deemed in force. fee_source_url deliberately left on the FY 2025-2026 Adopted Budget, the last document containing an ADOPTED Exhibit B. NEXT PASS: check for an Adopted Budget FY 2026-2027 PDF; if one appears, repoint all eight Orem rows to it.

Source: published fee schedule · Verified 11/12/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Concrete or masonry fence review
Flat fee $440.00
$440.00
○Fence modification or waiver
Flat fee $590.00
$590.00
Fence permit for other fence types
Not published
see rule
Repair of an existing fence
No permit required
see rule
How this jurisdiction calculates the fee

Orem charges $440.00 to review a concrete or masonry fence, listed among its development review applications, and $590.00 for a fence modification or waiver. A masonry or concrete fence over seven feet also needs a building permit. Other fences need a fence permit but not a building permit, and the budget fee schedule publishes no separate amount for that fence permit. Repairing an existing fence needs no permit.

Source: published fee schedule · Verified 11/13/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat reroofing fee is published
Not published
see rule
Reroofing permit
Read from Table 3A of the 1997 Uniform Administrative Code
see rule
Minor roof repairs
No permit required
see rule
Plan review
Lesser of 65% of the permit fee or actual cost
see rule
How this jurisdiction calculates the fee

Orem publishes no flat reroofing fee. Reroofing requires a permit and is priced like other construction, with value taken from the International Code Council Building Valuation Tables and the fee read from Table 3A of the 1997 Uniform Administrative Code as revised in 2023. Plan review is the lesser of 65 percent of the permit fee or the actual cost. Minor roof repairs do not require a permit.

Source: published fee schedule · Verified 11/13/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat retaining wall permit fee is published
Not published
see rule
Wall under four feet with no added load above
No permit required
see rule
Wall requiring a permit
Read from Table 3A of the 1997 Uniform Administrative Code
see rule
○Engineering permit fee where site work is involved
Flat fee $94.00
$94.00
How this jurisdiction calculates the fee

Orem publishes no flat retaining wall permit fee. A retaining wall needs a building permit once it reaches four feet measured from grade, and also whenever it carries an added load above it, whatever its height. Walls under that height with no added load need no permit. A wall that does need one is priced from the International Code Council Building Valuation Tables with the fee read from Table 3A of the 1997 Uniform Administrative Code as revised in 2023. | 2026-09-29 (lane B run 1809) ADOPTION STATUS MOVED, FIGURES DID NOT. The FY 2025-2026 Adopted Budget cited here was re-read and orem.gov/city-finances re-listed in full. Still NO "Adopted Budget FY 2026-2027" PDF exists on the site. What changed since the 2026-09-14 pass: the FY27 Citizens Budget link is now wp-content/uploads/2026/09/FINAL-BUDGET-City-of-Orems-Citizen-Budget-FY27-1.pdf and is labelled plainly "FY 2026-2027 Citizens Budget", where the prior pass recorded it as "(Based on Interim Budget)" - i.e. Orem appears to have moved from interim to finally adopted for FY27, but has published no adopted budget document carrying Exhibit B. That Citizens Budget is a 20-page summary and contains no fee schedule. MATERIALLY THIS CHANGES NOTHING FOR THESE ROWS: Tentative-Budget-FY-2026-2027.pdf Exhibit B prints FY 2026 Adopted and FY 2027 Proposed side by side and the two columns are identical for every figure these rows carry - Table 3A 1997 UAC w/2023 revisions, $40 Base Fee + Table 3B for an Electrical Only Permit, $94.00 miscellaneous/engineering permit, plan review the lesser of 65% of the permit fee or actual cost. So no stored amount is at risk whichever document is deemed in force. fee_source_url deliberately left on the FY 2025-2026 Adopted Budget, the last document containing an ADOPTED Exhibit B. NEXT PASS: check for an Adopted Budget FY 2026-2027 PDF; if one appears, repoint all eight Orem rows to it.

Source: published fee schedule · Verified 11/12/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

No flat shed permit fee is published
Not published
see rule
Shed of 200 square feet or less on a one or two family lot
No building permit required, site plan approval still needed
see rule
Shed requiring a permit
Read from Table 3A of the 1997 Uniform Administrative Code
see rule
Plan review
Lesser of 65% of the permit fee or actual cost
see rule
How this jurisdiction calculates the fee

Orem publishes no flat shed permit fee. A storage shed needs a building permit once it exceeds 200 square feet on a one or two family lot, or 120 square feet on commercial and multi-family property. Smaller sheds need no building permit but still require site plan approval. A shed that needs a permit is priced from the International Code Council Building Valuation Tables with the fee read from Table 3A of the 1997 Uniform Administrative Code as revised in 2023. | 2026-09-29 (lane B run 1809) ADOPTION STATUS MOVED, FIGURES DID NOT. The FY 2025-2026 Adopted Budget cited here was re-read and orem.gov/city-finances re-listed in full. Still NO "Adopted Budget FY 2026-2027" PDF exists on the site. What changed since the 2026-09-14 pass: the FY27 Citizens Budget link is now wp-content/uploads/2026/09/FINAL-BUDGET-City-of-Orems-Citizen-Budget-FY27-1.pdf and is labelled plainly "FY 2026-2027 Citizens Budget", where the prior pass recorded it as "(Based on Interim Budget)" - i.e. Orem appears to have moved from interim to finally adopted for FY27, but has published no adopted budget document carrying Exhibit B. That Citizens Budget is a 20-page summary and contains no fee schedule. MATERIALLY THIS CHANGES NOTHING FOR THESE ROWS: Tentative-Budget-FY-2026-2027.pdf Exhibit B prints FY 2026 Adopted and FY 2027 Proposed side by side and the two columns are identical for every figure these rows carry - Table 3A 1997 UAC w/2023 revisions, $40 Base Fee + Table 3B for an Electrical Only Permit, $94.00 miscellaneous/engineering permit, plan review the lesser of 65% of the permit fee or actual cost. So no stored amount is at risk whichever document is deemed in force. fee_source_url deliberately left on the FY 2025-2026 Adopted Budget, the last document containing an ADOPTED Exhibit B. NEXT PASS: check for an Adopted Budget FY 2026-2027 PDF; if one appears, repoint all eight Orem rows to it.

Source: published fee schedule · Verified 11/12/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plumbing only permit base fee
Flat fee $40.00
$40.00
Added to the base fee
Amount from Table 3D of the 1997 Uniform Administrative Code
see rule
Water heater installation or replacement
Permit required
see rule
Plan review
Lesser of 65% of the permit fee or actual cost
see rule
How this jurisdiction calculates the fee

Installing or replacing a water heater in Orem requires a plumbing permit. A plumbing only permit costs a $40.00 base fee plus the amount read from Table 3D of the 1997 Uniform Administrative Code as revised in 2023. Orem notes that minor permits such as replacement water heaters can usually be issued within one business day. Plan review is the lesser of 65 percent of the permit fee or the actual cost.

Source: published fee schedule · Verified 11/13/2026

See the full write-up: Orem building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.