Pleasant Grove, Utah Building Permit Cost Calculator
Estimates permit cost in Pleasant Grove from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit submittal fee - New Single Family Flat fee $250.00 | $250.00 |
○Building permit submittal fee - New Commercial Flat fee $500.00 | $500.00 |
○Building permit submittal fee - Commercial Remodel/Tenant Improvement (fee schedule page) Flat fee $250.00 | $250.00 |
○Building permit submittal fee - Commercial Remodel/Tenant Improvement (Building Division page) Flat fee $75.00 | $75.00 |
○Building permit submittal fee - All Others (Solar, Signs, Basements) Flat fee $75.00 | $75.00 |
○Impact fees on a home, per city FAQ Flat fee $11,019.19 | $11,019.19 |
○Water and sewer connection fees, per city FAQ Flat fee $995.00 | $995.00 |
Total building permit fees for an average home, per city FAQ $15,500 to $16,000 | see rule |
How this jurisdiction calculates the fee
A submittal fee (the plan check fee) is collected after the application is filed and is applied toward the cost of the building permit; the balance of the permit fee is calculated and collected at issuance and is not published online. Impact and connection fees are charged separately. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 9/17/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Deck application fee Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
The deck checklist directs the applicant to pay a $75 application fee, with the balance of the permit paid at the time the permit is issued. Pleasant Grove publishes only its building permit submittal (plan check) fee tiers online; the submittal fee is applied toward the cost of the building permit and the balance is calculated and collected when the permit is issued. The balance calculation is not published on the city website. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 11/9/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit submittal fee - Solar, Basements, Additions, Pools, Plan Revisions Flat fee $75.00 | $75.00 |
○Building permit submittal fee - New Single Family Residential Flat fee $250.00 | $250.00 |
○Building permit submittal fee - New Commercial Shell Flat fee $500.00 | $500.00 |
○Building permit submittal fee - Commercial Remodel/Tenant Improvement Flat fee $75.00 | $75.00 |
Balance of the building permit fee, calculated and collected at issuance Not published online | see rule |
How this jurisdiction calculates the fee
Pleasant Grove publishes only its building permit submittal (plan check) fee tiers online; the submittal fee is applied toward the cost of the building permit and the balance is calculated and collected when the permit is issued. The balance calculation is not published on the city website. | 2026-09-14 (lane B run 1068): examples populated from the Pleasant Grove Building Division page (pgcityutah.gov/departments/community_development/building.php), read in full this pass. Pleasant Grove publishes no flat fee for this permit type; what it does publish is the submittal (plan check) fee table, and the page states the submittal fee is applied towards the total cost of the building permit, with the balance calculated and collected at issuance and NOT published online. The four submittal tiers below are printed verbatim on that page as of this pass. Nothing was guessed, and the unpublished balance is not estimated. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 11/9/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Fence permit, new or replacement (permit required; city FAQ, "Building A Fence") There is no fee for the permit | see rule |
How this jurisdiction calculates the fee
The city's FAQ states there is no fee for the fence permit. | 2026-09-14 (lane B run 1068): examples populated and the source re-confirmed on the agency's own domain. The Community Development FAQ at pgcityutah.gov/departments/community_development/faqs.php, under the heading "Building A Fence", reads verbatim: "You need a permit for a new or a replacement fence. The application requires information of where and how you intend to install the fence. There is no fee for the permit." A permit is therefore required and free. Note the previously cited faq.php path now returns HTTP 404; the live page is faqs.php, and fee_source_url has been repointed to it. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 11/9/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit submittal fee - Solar, Basements, Additions, Pools, Plan Revisions Flat fee $75.00 | $75.00 |
○Building permit submittal fee - New Single Family Residential Flat fee $250.00 | $250.00 |
○Building permit submittal fee - New Commercial Shell Flat fee $500.00 | $500.00 |
○Building permit submittal fee - Commercial Remodel/Tenant Improvement Flat fee $75.00 | $75.00 |
Balance of the building permit fee, calculated and collected at issuance Not published online | see rule |
How this jurisdiction calculates the fee
Pleasant Grove publishes only its building permit submittal (plan check) fee tiers online; the submittal fee is applied toward the cost of the building permit and the balance is calculated and collected when the permit is issued. The balance calculation is not published on the city website. | 2026-09-14 (lane B run 1068): examples populated from the Pleasant Grove Building Division page (pgcityutah.gov/departments/community_development/building.php), read in full this pass. Pleasant Grove publishes no flat fee for this permit type; what it does publish is the submittal (plan check) fee table, and the page states the submittal fee is applied towards the total cost of the building permit, with the balance calculated and collected at issuance and NOT published online. The four submittal tiers below are printed verbatim on that page as of this pass. Nothing was guessed, and the unpublished balance is not estimated. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 11/11/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Garage/shed application fee Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
The garages and sheds checklist directs the applicant to pay a $75 application fee, with the balance of the permit paid at the time the permit is issued. The city's FAQ states the fee for a shed 200 square feet or larger is calculated based on size. Pleasant Grove publishes only its building permit submittal (plan check) fee tiers online; the submittal fee is applied toward the cost of the building permit and the balance is calculated and collected when the permit is issued. The balance calculation is not published on the city website. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 11/9/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit submittal fee - Solar, Basements, Additions, Pools, Plan Revisions Flat fee $75.00 | $75.00 |
○Building permit submittal fee - New Single Family Residential Flat fee $250.00 | $250.00 |
○Building permit submittal fee - New Commercial Shell Flat fee $500.00 | $500.00 |
○Building permit submittal fee - Commercial Remodel/Tenant Improvement Flat fee $75.00 | $75.00 |
Balance of the building permit fee, calculated and collected at issuance Not published online | see rule |
How this jurisdiction calculates the fee
Confirmed absence. Pleasant Grove requires a building permit for any modification or alteration of a plumbing, heating or electrical system, which covers a water heater replacement, but the city publishes no fee for it. The adopted FY 2026 Fee Schedule (effective July 1, 2025) has a Community Development Building Fees heading that contains only culinary and pressurized-irrigation meter-set charges, no plumbing, mechanical or water-heater line, and no building-permit valuation table anywhere in its 17 pages. Pleasant Grove City Code 7-8-5 defers all permit fees to the consolidated fee schedule. The only published building charges are plan-check submittal fees collected at application and credited toward the total permit cost, and none of the published submittal categories names a water heater, so no figure can be attributed to this permit type. | 2026-09-14 (lane B run 1068): examples populated from the Pleasant Grove Building Division page (pgcityutah.gov/departments/community_development/building.php), read in full this pass. Pleasant Grove publishes no flat fee for this permit type; what it does publish is the submittal (plan check) fee table, and the page states the submittal fee is applied towards the total cost of the building permit, with the balance calculated and collected at issuance and NOT published online. The four submittal tiers below are printed verbatim on that page as of this pass. Nothing was guessed, and the unpublished balance is not estimated. 2026-09-17 (lane B run 1390, pipeline run 94): FISCAL-YEAR SUCCESSOR HUNT DRIVEN TO AN ANSWER. The water_heater row cited cms2.revize.com/revize/pleasantgroveut/Fee Schedule_FY2026_Adopted.pdf, which is headed "Adopted FY 2026 Fee - Effective July 1, 2025" - a fiscal year that ended 2026-06-30. No FY2027 PDF exists (guessed FY2027 Adopted and Proposed paths both return a clean 404 with content-length 0), and the city no longer links any fee-schedule PDF at all: pgcityutah.gov/departments/community_development/fee_schedule.php now prints the Building Permit Submittal Fees table inline as HTML. source_url has been repointed to that live page, which prints exactly the stored figures: New Single Family $250, New Commercial $500, Commercial Remodel/Tenant Improvement $250, All Others (Solar, Signs, Basements) $75, with the note "The submittal fee is applied towards the cost of the building permit". THE KNOWN TWO-PAGE DISCREPANCY IS RE-CONFIRMED AND STILL NOT RESOLVED: the Building Division page (building.php) prices Commercial Remodel/Tenant Improvement at $75 while the Fee Schedule page prices it at $250. Both are official City of Pleasant Grove pages; the row carries both, each labelled with its source. Also re-confirmed verbatim on the city FAQ page: impact fees $11,019.19, water and sewer connection fees $995.00, total building permit fees for an average home "currently around $15,500 to $16,000", and "You need a permit for a new or a replacement fence... There is no fee for the permit". No figure changed.
Source: published fee schedule · Verified 11/9/2026
See the full write-up: Pleasant Grove building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.