Riverton, Utah Building Permit Cost Calculator
Estimates permit cost in Riverton from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Permits - Building (valuation data based on February 2020 ICC (BVD) Table) Fees Based on the 1994 Modified UBC 1-A Fee Table | see rule |
○1994 Modified UBC 1-A Fee Table – permit fee for valuation up to $1,000.00 Flat fee $43.00 | $43.00 |
○1994 Modified UBC 1-A Fee Table – permit fee for valuation from $99,000.00 to $100,000.00 Flat fee $1,075.00 | $1,075.00 |
1994 Modified UBC 1-A Fee Table – permit fee for valuation from $100,000.00 to $500,000.00 1,075+(((Total Valuation-100,000)/1,000)*5.8) | see rule |
1994 Modified UBC 1-A Fee Table – permit fee for valuation from $500,000.00 to $1,000,000.00 3354+(((Total Valuation-500,000)/1,000)*4.94) | see rule |
1994 Modified UBC 1-A Fee Table – permit fee for valuation over $1,000,000.00 5824+(((Total Valuation-1,000,000)/1,000)*3.8) | see rule |
Permits - Basement - Unfinished $15 / sq ft - valuation calc | see rule |
Permits - Basement - Finished $35 / sq ft - valuation calc | see rule |
Permits - Basement - Existing Home $20 / sq ft - valuation calc | see rule |
Permits - Carport / Covered Patio $25 / sq ft - valuation calc | see rule |
Plan Check Fee - SFD Residential 1st Review of Floor Plan · add-on 45% of Bldg Permit Fee — select the permit fee line above to calculate | see rule |
Plan Check Fee - MFD 1st Review of Floor Plan · add-on 65% of Bldg Permit Fee — select the permit fee line above to calculate | see rule |
Plan Check Fee - Non-Residential · add-on 65% of Bldg Permit Fee — select the permit fee line above to calculate | see rule |
Admin Fee - Residential SFD and MFD (with same floor plan after 1st review) · add-on 15% of Bldg Permit Fee — select the permit fee line above to calculate | see rule |
○Subsequent Review of Plans – All Departments Flat fee $100.00 | $100.00 |
○Inspections Flat fee $50.00 | $50.00 |
○Inspection - Re-Inspection Fee Flat fee $50.00 | $50.00 |
○Permits - Demolition Flat fee $50.00 | $50.00 |
○Permits - Temporary Power Flat fee $50.00 | $50.00 |
Inclement Weather Bond Engineer's Estimate ($500 minimum) | see rule |
Frontage Improvement Bond - Curb, Gutter, Asphalt Tie In, and Sidewalk Engineer's Estimate ($500 minimum) | see rule |
How this jurisdiction calculates the fee
Riverton converts project valuation into a permit fee using the 1994 Modified UBC Table 1-A fee table it republishes, with valuations calculated from the ICC Valuation Tables (the fee schedule cites the February 2020 ICC Building Valuation Data table for general building permits). Certain project types have a published per-square-foot valuation rate rather than an ICC lookup. Plan check is charged as a percentage of the building permit fee, and each inspection carries a flat fee. PROVENANCE NOTE: Riverton's adopted fee schedule sets building permit fees by reference to the 1994 Modified UBC Table 1-A rather than reproducing it, so the bracket amounts and per-thousand multipliers shown here are not printed in any Riverton document. All other figures in this row are verified against the FY2026-2027 Fee Schedule. SOURCING GAP FOUND 2026-09-15 (run 1291), NOT GUESSED, FIGURES LEFT AS STORED: the Riverton FY 2026-2027 Adopted Fee Schedule was downloaded and read in full today (462 lines, pdftotext -layout). Its BUILDING section prints only the words "Fees Based on the 1994 Modified UBC 1-A Fee Table" - the table itself is NOT reproduced anywhere in the document, and the strings $43.00, $1,075.00, 5.8, 3354, 4.94 and 5824 appear nowhere in it. The five UBC 1-A lines on this row therefore have NO published source at the cited URL. Everything else on the row DOES verify verbatim in the schedule: Basement Unfinished $15/sq ft, Finished $35/sq ft, Existing Home $20/sq ft, Carport/Covered Patio $25/sq ft, Plan Check SFD 45%, MFD 65%, Non-Residential 65%, Admin Fee 15%, Subsequent Review $100.00, Inspections $50.00, Re-Inspection $50.00, Demolition $50.00, Temporary Power $50.00. rivertonutah.gov/departments/community-development/building returns 404, so the modified UBC table could not be located on the city domain this pass and was deliberately not guessed at. HUMAN ACTION: obtain Riverton's modified UBC 1-A table and cite it, or drop the five unsourced lines.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Permits - Deck $20 / sq ft - valuation calc | see rule |
Permits - Covered Patio and Deck $35 / sq ft - valuation calc | see rule |
Permits - Carport / Covered Patio $25 / sq ft - valuation calc | see rule |
How this jurisdiction calculates the fee
Riverton sets deck valuation on a per-square-foot basis and then converts that valuation to a permit fee using the 1994 Modified UBC Table 1-A fee table. Covered decks and covered patios use a higher per-square-foot valuation rate.
Source: published fee schedule · Verified 11/9/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permits - Temporary Power Flat fee $50.00 | $50.00 |
○Permits - Solar Flat fee $175.00 | $175.00 |
○Plan Check Fee - Solar Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
Riverton's adopted fee schedule has no general electrical trade permit line; electrical work forms part of the valuation-based building permit converted through the 1994 Modified UBC Table 1-A fee table. Two electrical-related flat fees are published.
Source: published fee schedule · Verified 11/9/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, lowest valuation bracket (valuation under $1,000.00) Flat fee $43.00 | $43.00 |
○Plan Check Fee - Basement Finishes, Accessory Structures, etc. Flat fee $25.00 | $25.00 |
○Inspections Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Riverton's adopted FY 2026-2027 Fee Schedule publishes no fence line item. Fences up to 6 feet high require no building permit; a taller fence is permitted as a building permit and priced from the 1994 Modified UBC 1-A Fee Table that Riverton adopts as its permit fee table, applied to a valuation calculated using the current ICC Valuation Tables. The table's lowest bracket (valuation under $1,000.00) is $43.00. Plan check for accessory structures is $25.00 and inspections are $50.00. Utah's 1% state surcharge (Utah Code 15A-1-209) applies statewide but is not itemized in Riverton's schedule. | 2026-09-12 (lane B run 897): cited FY 2026-2027 Adopted Fee Schedule re-read in full and is current. Items 177 ($25.00 Plan Check - Basement Finishes, Accessory Structures, etc.) and 179 ($50.00 Inspections) verify verbatim. PROVENANCE GAP: the $43.00 lowest-bracket figure is NOT printed anywhere in the cited schedule. The schedule adopts the fee table only by reference - items 165-171 carry the marginal note "Fees Based on the 1994 Modified UBC 1-A Fee Table" and Riverton publishes no copy of that modified table. The $43.00 is therefore unverifiable against the cited source and should be repointed to whatever document states the modified table, or confirmed with the department.
Source: published fee schedule · Verified 11/5/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permits - Re-Roof Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Riverton charges a flat re-roof permit fee rather than a valuation calculation.
Source: published fee schedule · Verified 11/9/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permits - Basement walkout/Retaining Wall over 4' Flat fee $175.00 | $175.00 |
○Inspection - Re-Inspection Fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Riverton charges a flat permit fee for a retaining wall over 4 feet, shared with the basement walkout permit line.
Source: published fee schedule · Verified 11/9/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plan Check Fee - Basement Finishes, Accessory Structures, etc. Flat fee $25.00 | $25.00 |
○Inspections Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Accessory structures that do require a permit are valued using the ICC valuation tables and converted to a permit fee through the 1994 Modified UBC Table 1-A fee table. Riverton charges a separate flat plan check fee for accessory structures and basement finishes rather than a percentage of the permit fee.
Source: published fee schedule · Verified 11/9/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit fee, lowest valuation bracket (valuation under $1,000.00) Flat fee $43.00 | $43.00 |
○Inspections Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Riverton's adopted FY 2026-2027 Fee Schedule publishes no water-heater, plumbing or mechanical line item. Riverton requires a building permit to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, so a water heater replacement needs a permit; it is priced from the 1994 Modified UBC 1-A Fee Table that Riverton adopts as its permit fee table, applied to a valuation calculated using the current ICC Valuation Tables. The table's lowest bracket (valuation under $1,000.00) is $43.00, and inspections are $50.00. Utah's 1% state surcharge (Utah Code 15A-1-209) applies statewide but is not itemized in Riverton's schedule.
Source: published fee schedule · Verified 11/4/2026
See the full write-up: Riverton building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.