Salt Lake County, Utah Building Permit Cost Calculator
Estimates permit cost in Salt Lake County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Reroofing – residential roof with sheathing Flat fee $125.00 | $125.00 |
○Reroofing – residential roof without sheathing Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
Under the adopted fee schedule for unincorporated Salt Lake County, administered by the Greater Salt Lake Municipal Services District on the county's behalf, residential reroofing permits are flat fees: the higher fee applies to a roof with sheathing and includes inspection of the sheathing or decking, and the lower fee applies to shingles only, with no decking or sheathing. Building permits are charged a state surcharge equal to 1% of the permit fee. Re-verified 2026-09-10: every stored figure re-read in the cited document and unchanged (Reroofing - residential roof with sheathing $125.00, without sheathing $75.00; Mechanical, Plumbing & Electrical Permit $70.00 with $20.00 per additional appliance or fixture). SCHEDULE-TERM NOTE, NOT RESOLVED HERE: the document at this URL is captioned "2025 Fee Schedule for Salt Lake County, adopted June 17, 2025, effective date July 1, 2025" - the county's FY2026, whose term ended 30 June 2026. No FY2027 successor is published on msd.utah.gov and this file is still the county's current linked fee schedule, so the figures stand, but a successor is overdue and should be the first thing checked next pass.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Mechanical, Plumbing & Electrical Permit Flat fee $70.00 | $70.00 |
○Fee per additional appliance or fixture Flat fee $20.00 | $20.00 |
How this jurisdiction calculates the fee
Under the adopted fee schedule for unincorporated Salt Lake County, administered by the Greater Salt Lake Municipal Services District on the county's behalf, the flat mechanical, plumbing and electrical permit fee includes on-site inspection of one system; each additional appliance or fixture inspected while the inspector is on site is charged a per-unit fee. Mechanical, plumbing and electrical permits are charged a state surcharge equal to 1% of the permit fee. Re-verified 2026-09-10: every stored figure re-read in the cited document and unchanged (Reroofing - residential roof with sheathing $125.00, without sheathing $75.00; Mechanical, Plumbing & Electrical Permit $70.00 with $20.00 per additional appliance or fixture). SCHEDULE-TERM NOTE, NOT RESOLVED HERE: the document at this URL is captioned "2025 Fee Schedule for Salt Lake County, adopted June 17, 2025, effective date July 1, 2025" - the county's FY2026, whose term ended 30 June 2026. No FY2027 successor is published on msd.utah.gov and this file is still the county's current linked fee schedule, so the figures stand, but a successor is overdue and should be the first thing checked next pass.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Salt Lake County building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.