Saratoga Springs, Utah Building Permit Cost Calculator
Estimates permit cost in Saratoga Springs from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Non-refundable application deposit - Single Family Flat fee $200.00 | $200.00 |
○Non-refundable application deposit - Commercial/Multi-Family Flat fee $500.00 | $500.00 |
Plan Review · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Permits not requiring complete plan review · add-on 25% of building permit fees — select the permit fee line above to calculate | see rule |
State of Utah inspector training · add-on 1% of permit fee — select the permit fee line above to calculate | see rule |
○Demolition, when required by the Building Official Flat fee $25.00 | $25.00 |
Inspections outside normal business hours (min. charge two (2) hours) $47.00/hour | see rule |
Re-inspection (min. charge one (1) hour) $47.00/hour | see rule |
Inspections for which no fee is specifically indicated (min. charge one (1) hour) $47.00/hour | see rule |
Additional plan reviews required by changes, additions, or revisions to the plans (min. charge one (1) hour) $47.00/hour | see rule |
For use of outside consultants for plan reviews, inspections, or both Actual costs | see rule |
Escrow bond - Replacement of Sidewalks $100.00/section | see rule |
Escrow bond - Final Grade $200.00/lot | see rule |
○Escrow bond - Remove Dirt Piles Flat fee $500.00 | $500.00 |
Escrow bond - Install Approach $500.00/2 car drive; $750.00/3 car drive | see rule |
Escrow bond - Replacement of Curb and Gutter $50.00/foot | see rule |
Escrow bond - Concrete Steps and Porches $5.00/sq. ft. | see rule |
Escrow bond - Flat Work Concrete $2.00/sq. ft | see rule |
Escrow bond - Asphalt $2.00/sq. ft | see rule |
How this jurisdiction calculates the fee
The base building permit fee is not published as a city dollar table, and two official City sources describe it differently. Both are recorded here; neither is treated as controlling. (1) The Consolidated Fee Schedule, which the City's Fees page (https://www.saratogasprings-ut.gov/191/Fees) links as current, states "Building permit fee shall be as per fee schedule found in the International Residential Code", with valuation "determined at 75% of the 'Building Valuation Data' published by the ICC in Building Safety magazine"; that document carries no adoption date later than Resolution R14-7, 2-4-14. (2) The Building Department's Building Permit Fee Schedule page (https://www.saratogasprings-ut.gov/211/Building-Permit-Fee-Schedule) publishes as its base permit fee table a scan of Appendix L of the 2012 Seattle Residential Code - a model-code appendix, not an IRC table and not a Saratoga Springs adoption. Audited 2026-08-27; the discrepancy is unresolved and the City should be asked which table it applies. The city-published dollar amounts and percentages that do apply are listed in examples below. A non-refundable deposit is required with every application and is applied toward the cost of the permit (source: https://www.saratogasprings-ut.gov/220/Obtaining-a-Building-Permit). 2026-09-17 (lane B run 1390, pipeline run 94): re-verified; all nineteen stored figures read verbatim in the cited PDF (2,156 lines, pdftotext -layout, whole file). SUCCESSOR HUNT NEGATIVE: the city fee page saratogasprings-ut.gov/191/Fee-Schedule still links DocumentCenter/View/1707/Consolidated-Fee-Schedule - our exact cited URL - and no other fee document. SOURCING OBSERVATION, NOT A DEFECT IN THE FIGURES: the schedule carries NO printed effective date, adoption date or revision date anywhere in its 2,156 lines (the only date in the document is an unrelated "ambulance rates beginning July 1, 2023" note), so the edition in force cannot be established from the document itself and there is nothing to compare a future edition against. Worth asking the city for a dated edition. No figure changed.
Source: published fee schedule · Verified 11/9/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Issuance of each Electrical Permit Fee $22.00/each | see rule |
Issuance of each Supplemental Permit for which the original permit has not expired $6.50/each | see rule |
New multi-family residential buildings (apartments and condominiums) having three (3) or more living units, not including the area of the garage, carports, or other non-commercial automobile storage areas constructed at the same time $.045/sq. ft. | see rule |
One (1) and two (2) family residential building, not including garages, carports, and other minor accessory buildings constructed at the same time $.050/sq. ft. | see rule |
All other types of residential occupancies and alterations, additions, and modifications to existing residential buildings Use the Unit Fee Schedule | see rule |
New private, residential, in-ground swimming pools for single-family and multi-family occupancies including the complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping, and other similar electrical equipment directly related to the operation of a swimming pool $44.25/each pool | see rule |
Fixed residential appliance or receptacle outlets for the same, including wall-mounted electric ovens, counter-mounted cooking tops, electric ranges, self-contained room, console or through wall air conditioners, space heaters, food waste grinder, dishwashers, washing machines, water heater, clothes dryers, or other motor-operated appliances not exceeding one horse power (HP-746W) in rating $4.25/each | see rule |
Power apparatus - rating in horse power (HP), kilowatt (KW), kilovolt-ampere (KVA), or kilovolt-Ampere-reactive (KVAR) $4.25/each, up to and including 1 | see rule |
Pole or platform-mounted fixtures $1.00/each | see rule |
Theatrical type lighting fixtures or assemblies $1.00/each | see rule |
How this jurisdiction calculates the fee
Flat issuance fee plus a system/unit fee schedule, published in the ELECTRICAL PERMIT FEES tables of the Consolidated Fee Schedule. The new-residential rates include the wiring and electrical equipment on each building or other electrical equipment on the premises constructed at the same time. The system fee schedule amounts do not include permit issuing fees.
Source: published fee schedule · Verified 11/5/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Appendix L, total valuation $1 to $500 Flat fee $24.00 | $24.00 |
Appendix L, total valuation $501 to $2,000 $24 for the first $500; plus $3 for each additional $100 or fraction thereof, up to and including $2,000 | see rule |
Appendix L, total valuation $2,001 to $40,000 $69 for the first $2,000; plus $11 for each additional $1,000 or fraction thereof, up to and including $40,000 | see rule |
Appendix L, total valuation $40,001 to $100,000 $487 for the first $40,000; plus $9 for each additional $1,000 or fraction thereof, up to and including $100,000 | see rule |
Building valuation basis set by the Consolidated Fee Schedule · add-on 75% of the ICC Building Valuation Data — select the permit fee line above to calculate | see rule |
Plan review · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Permits not requiring complete plan review · add-on 25% of the building permit fee — select the permit fee line above to calculate | see rule |
State of Utah inspector-training surcharge (Utah Code 15A-1-209) · add-on 1% of the permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Saratoga Springs publishes no flat fence permit fee. Neither the City Consolidated Fee Schedule (BUILDING section) nor the separately published Building Permit Fee Schedule contains any fence line item, and the City does not require a building permit for a fence. Where a building permit is required for a structure, the fee is valuation-based: the Consolidated Fee Schedule sets building valuation at 75% of the ICC Building Valuation Data and states that the building permit fee is per the fee schedule found in the International Residential Code; the City publishes that schedule as residential-code Appendix L (Permit Fees), a graduated total-valuation table. Plan review is 65% of the building permit fee, permits not requiring complete plan review are 25% of building permit fees, and a State of Utah inspector-training surcharge of 1% of the permit fee is added (Utah Code 15A-1-209). | 2026-09-12 (lane B run 897): populated from the primary document. The cited Building Permit Fee Schedule was downloaded and read in full; it is the model-code Appendix L (Permit Fees) table, internal filename 56_AppL_Seattle_Res_2012.fm, and carries the disclaimer that "the provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance". ADOPTION IS UNESTABLISHED - the figures below are the table Saratoga Springs publishes as its building permit fee schedule, but the City ordinance referencing it was not located. Recorded rather than resolved.
Source: published fee schedule · Verified 11/4/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit, lowest valuation band ($1 to $500 total valuation) Flat fee $24.00 | $24.00 |
How this jurisdiction calculates the fee
No flat retaining-wall permit fee is published. Saratoga Springs prices building permits from valuation: the Consolidated Fee Schedule sets building valuation at 75% of the ICC Building Valuation Data and states the building permit fee is per the fee schedule found in the International Residential Code. The City publishes that schedule as residential-code Appendix L (Permit Fees), a graduated total-valuation table whose lowest band ($1 to $500 total valuation) is a $24 permit fee. Plan review adds 65% of the building permit fee (25% of building permit fees where complete plan review is not required), plus a State of Utah inspector-training surcharge of 1% of the permit fee (Utah Code 15A-1-209). A separate Grading Permit fee schedule exists for land-disturbing work and is not a retaining-wall building permit fee. | PROVENANCE FLAG RAISED 2026-09-12 (lane B run 814), FIGURE UNCHANGED AND CORRECT AS AGAINST THE CITED DOCUMENT: the cited "Building-Permit-Fee-Schedule-PDF" (saratogasprings-ut.gov DocumentCenter/View/156) is not a Saratoga Springs-adopted schedule at all. It is a scan of the model code APPENDIX L PERMIT FEES table (internal filename 56_AppL_Seattle_Res_2012.fm, typeset 2013) and it carries the model-code disclaimer "The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance." The stored $24.00 for the $1-$500 valuation band does appear verbatim in that table, so the figure matches its source; what is unestablished is whether Saratoga Springs has adopted Appendix L by reference. A human should confirm the adopting ordinance or repoint this row at the City consolidated fee schedule.
Source: published fee schedule · Verified 11/5/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit, lowest valuation band ($1 to $500 total valuation) Flat fee $24.00 | $24.00 |
How this jurisdiction calculates the fee
No flat shed or accessory-building permit fee is published. Saratoga Springs prices building permits from valuation: the Consolidated Fee Schedule sets building valuation at 75% of the ICC Building Valuation Data and states the building permit fee is per the fee schedule found in the International Residential Code. The City publishes that schedule as residential-code Appendix L (Permit Fees), a graduated total-valuation table whose lowest band ($1 to $500 total valuation) is a $24 permit fee. Plan review adds 65% of the building permit fee (25% of building permit fees where complete plan review is not required), plus a State of Utah inspector-training surcharge of 1% of the permit fee (Utah Code 15A-1-209).
Source: published fee schedule · Verified 11/5/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Plumbing permit issuance $22.00/each | see rule |
Supplemental Permit Issuance $10.00/each | see rule |
Water heater including vents $11.00/each | see rule |
Installation, alteration or repair of water piping or water treating equipment, or both $4.25/each | see rule |
Plumbing plan review (estimated fees may be required prior to review) · add-on 25% of the Plumbing Permit fee — select the permit fee line above to calculate | see rule |
Plumbing - State of Utah Inspector Training · add-on 1% of the plumbing permit fee — select the permit fee line above to calculate | see rule |
Plumbing - inspections outside normal business hours (min. charge two (2) hours) $47.00/hour | see rule |
Plumbing - re-inspections under provisions of the code $47.00/hour | see rule |
Electrical unit fee - fixed residential appliance or receptacle outlets for the same, including water heater $4.25/each | see rule |
How this jurisdiction calculates the fee
Plumbing permit issuance fee plus a unit fee schedule, published in the PLUMBING PERMITS FEES and unit fee tables of the Consolidated Fee Schedule. The unit fee schedule amounts do not include permit issuing fees. An electrical unit fee may also apply where the water heater is a fixed residential appliance or receptacle outlet.
Source: published fee schedule · Verified 11/10/2026
See the full write-up: Saratoga Springs building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.