Home / Calculators / Building Permit Fee Calculator

St. George, Utah Building Permit Cost Calculator

Estimates permit cost in St. George from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum building permit ($60.00 permit plus $0.60 D.O.C.)
Flat fee $60.60
$60.60
○Mobile home permit
Flat fee $200.00
$200.00
○Swimming pool permit
Flat fee $200.00
$200.00
○Valuation $1 to $500
Flat fee $23.50
$23.50
○Airport hangars - capitalization (Code 5313)
Flat fee $1,000.00
$1,000.00
How this jurisdiction calculates the fee

Per the St. George Building Fee Sheet, permit fees follow the 1997 Uniform Building Code valuation scale: $1 to $500 is $23.50; $501 to $2,000 is $23.50 for the first $500 plus $3.05 per additional $100; $2,001 to $25,000 is $69.25 for the first $2,000 plus $14.00 per additional $1,000; $25,001 to $50,000 is $391.75 for the first $25,000 plus $10.10 per additional $1,000; $50,001 to $100,000 is $643.75 for the first $50,000 plus $7.00 per additional $1,000; $100,001 to $500,000 is $993.75 for the first $100,000 plus $5.60 per additional $1,000; $500,001 to $1,000,000 is $3,233.75 for the first $500,000 plus $4.75 per additional $1,000; and $1,000,001 and up is $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000. Add 1% D.O.C. of the building permit fee, a plan check fee of 65% of the building permit fee, and a Habitat Control Plan fee of 0.2% of valuation.

Source: published fee schedule · Verified 11/5/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

St. George City Code section 9-5-2 requires the permit fee to be paid in the amount established by resolution of the city council; the ordinance itself publishes no dollar figure. The city's separately published Building Fee Sheet is a valuation-based scale and contains no electrical line item.

Source: published fee schedule · Verified 8/3/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit, total valuation $1 to $500
Flat fee $23.50
$23.50
How this jurisdiction calculates the fee

St. George publishes no flat fence, retaining-wall or shed permit fee. The Adopted FY27 Master Fee Schedule (adopted 16 July 2026) prices building permits from a graduated Total Valuation table beginning at $23.50 for total valuation of $1 to $500. A Utah Department of Commerce fee of 1% of the building fee is added (the Utah state surcharge under Utah Code 15A-1-209); commercial plan check is 65% of the building permit fee and internal commercial plan review is $60 per hour; a Habitat Control Plan fee of 0.2% of valuation also applies. The schedule does list several flat $60 residential permits, including a Residential Misc permit, but does not define which project types fall into that category. The schedule's only Fences/Walls and Accessory Buildings lines sit in the Code Enforcement Fees table and are per-day violation fines, not permit fees.

Source: published fee schedule · Verified 11/5/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit, total valuation $1 to $500
Flat fee $23.50
$23.50
How this jurisdiction calculates the fee

St. George publishes no flat fence, retaining-wall or shed permit fee. The Adopted FY27 Master Fee Schedule (adopted 16 July 2026) prices building permits from a graduated Total Valuation table beginning at $23.50 for total valuation of $1 to $500. A Utah Department of Commerce fee of 1% of the building fee is added (the Utah state surcharge under Utah Code 15A-1-209); commercial plan check is 65% of the building permit fee and internal commercial plan review is $60 per hour; a Habitat Control Plan fee of 0.2% of valuation also applies. The schedule does list several flat $60 residential permits, including a Residential Misc permit, but does not define which project types fall into that category. The schedule's only Fences/Walls and Accessory Buildings lines sit in the Code Enforcement Fees table and are per-day violation fines, not permit fees.

Source: published fee schedule · Verified 11/5/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit, total valuation $1 to $500
Flat fee $23.50
$23.50
How this jurisdiction calculates the fee

St. George publishes no flat fence, retaining-wall or shed permit fee. The Adopted FY27 Master Fee Schedule (adopted 16 July 2026) prices building permits from a graduated Total Valuation table beginning at $23.50 for total valuation of $1 to $500. A Utah Department of Commerce fee of 1% of the building fee is added (the Utah state surcharge under Utah Code 15A-1-209); commercial plan check is 65% of the building permit fee and internal commercial plan review is $60 per hour; a Habitat Control Plan fee of 0.2% of valuation also applies. The schedule does list several flat $60 residential permits, including a Residential Misc permit, but does not define which project types fall into that category. The schedule's only Fences/Walls and Accessory Buildings lines sit in the Code Enforcement Fees table and are per-day violation fines, not permit fees.

Source: published fee schedule · Verified 11/5/2026

See the full write-up: St. George building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.