Taylorsville, Utah Building Permit Cost Calculator
Estimates permit cost in Taylorsville from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation under $2,000 $24.00 for the first $500.00, plus 2,495 x $3.50 for $249,500.00 over (rounded up per "or fraction thereof") = $8,756.50 | $8,756.50 |
○Valuation $2,000 to $25,000 $76.50 for the first $2,000.00, plus 248 x $16.50 for $248,000.00 over (rounded up per "or fraction thereof") = $4,168.50 | $4,168.50 |
○Valuation $25,000 to $50,000 $456.00 for the first $25,000.00, plus 225 x $12.00 for $225,000.00 over (rounded up per "or fraction thereof") = $3,156.00 | $3,156.00 |
○Valuation $50,000 to $100,000 $765.00 for the first $50,000.00, plus 200 x $8.50 for $200,000.00 over (rounded up per "or fraction thereof") = $2,465.00 | $2,465.00 |
○Valuation $100,000 to $500,000 $1,181.00 for the first $100,000.00, plus 150 x $6.50 for $150,000.00 over (rounded up per "or fraction thereof") = $2,156.00 | $2,156.00 |
○Valuation $500,000 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $3,781.00 applies | $3,781.00 |
○Valuation over $1,000,000 $250,000.00 is within the first $1,000,000.00, so the base $6,531.00 applies | $6,531.00 |
○Residential valuation - main floor / second floor $88.03 x 2,000 = $176,060.00 | $176,060.00 |
○Residential valuation - rough basement $36.50 x 2,000 = $73,000.00 | $73,000.00 |
○Residential valuation - finished basement $15.00 x 2,000 = $30,000.00 | $30,000.00 |
○Residential valuation - converted garage/carport living space $45.00 x 2,000 = $90,000.00 | $90,000.00 |
○Manufactured home setup Flat fee $300.00 | $300.00 |
○Temporary structures Flat fee $150.00 | $150.00 |
○Land disturbance application Flat fee $100.00 | $100.00 |
○Demolition Flat fee $60.00 | $60.00 |
How this jurisdiction calculates the fee
Permit fee is set from a tiered table applied to the total construction valuation of the job. Taylorsville publishes its own per-square-foot construction values used to compute that valuation for residential work.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential valuation - deck $20.00 x 2,000 = $40,000.00 | $40,000.00 |
○Residential valuation - carport/covered deck $25.00 x 2,000 = $50,000.00 | $50,000.00 |
How this jurisdiction calculates the fee
Decks are not given a flat fee. The Consolidated Fee Schedule assigns a per-square-foot construction value to deck and covered deck area; that value is run through the tiered valuation-based building permit fee table.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical service charge Flat fee $60.00 | $60.00 |
○Temporary power Flat fee $60.00 | $60.00 |
How this jurisdiction calculates the fee
Common residential electrical work is charged as a flat permit fee on the Consolidated Fee Schedule rather than by valuation.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fences Flat fee $60.00 | $60.00 |
How this jurisdiction calculates the fee
Fences are a flat-fee permit on the Consolidated Fee Schedule.
Source: published fee schedule · Verified 9/15/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Roofing Flat fee $60.00 | $60.00 |
○Exterior coverings Flat fee $60.00 | $60.00 |
○Replacing windows & doors Flat fee $60.00 | $60.00 |
How this jurisdiction calculates the fee
Roofing is a flat-fee residential permit on the Consolidated Fee Schedule. Related exterior work is listed at the same flat rate.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
No flat retaining wall fee is printed on the Consolidated Fee Schedule; the permit is priced from the tiered valuation-based building permit fee table using the construction valuation of the wall.
Source: published fee schedule · Verified 8/3/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential valuation - garage/shed $34.18 x 2,000 = $68,360.00 | $68,360.00 |
How this jurisdiction calculates the fee
Sheds and detached garages are priced by valuation. The Consolidated Fee Schedule publishes a per-square-foot construction value for garage/shed space, which is run through the tiered valuation-based building permit fee table.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Hot water heater Flat fee $60.00 | $60.00 |
○HVAC Flat fee $60.00 | $60.00 |
○Gas line Flat fee $60.00 | $60.00 |
How this jurisdiction calculates the fee
Water heater replacement is a flat-fee residential permit on the Consolidated Fee Schedule. Related mechanical and gas work is listed at the same flat rate.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Taylorsville building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.