B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Washington, Utah Building Permit Cost Calculator

Estimates permit cost in Washington from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, valuation 1.00 to 1,000
Flat fee $30.00
$30.00
○Building permit fee, valuation 1,001. to 1,100.
Flat fee $30.75
$30.75
○Building permit fee, valuation 9,001. to 10,000.
Flat fee $141.18
$141.18
○Building permit fee, valuation 25,001. to 26,000.
Flat fee $317.33
$317.33
○Building permit fee, valuation 50,001. to 51,000.
Flat fee $499.81
$499.81
○Building permit fee, valuation 99,001. to 100,000.
Flat fee $738.93
$738.93
○Building permit fee, valuation over $100,000
$738.93 for the first $100,000.00, plus 150 x $4.03 for $150,000.00 over (rounded up per "or fraction thereof") = $1,343.43
$1,343.43
○Building permit fee, valuation over $500,000
$250,000.00 is within the first $500,000.00, so the base $2,350.93 applies
$2,350.93
○Building permit fee, valuation over $1,000,000
$250,000.00 is within the first $1,000,000.00, so the base $4,070.93 applies
$4,070.93
Plan review fee
The plan review fee shall be equal to 45% of the total calculated building permit fee.
see rule
○Square foot construction cost, R-3 residential one- and two-family, Type VB (dollars per square foot)
Flat fee $90.35
$90.35
○Square foot construction cost, R-2 residential multiple family, Type VB (dollars per square foot)
Flat fee $72.38
$72.38
○Square foot construction cost, U utility/miscellaneous, Type VB - used for private garages (dollars per square foot)
Flat fee $31.46
$31.46
Unfinished basements (all use groups)
$15. per square foot
see rule
How this jurisdiction calculates the fee

The building permit fee is read off BUILDING PERMIT FEE TABLE A using the project valuation, and valuation for new construction is derived from the square foot construction costs in TABLE B by occupancy group and type of construction. A plan review fee equal to 45% of the total calculated building permit fee is added.

Source: published fee schedule · Verified 11/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, valuation 1.00 to 1,000
Flat fee $30.00
$30.00
○Building permit fee, valuation 2,001. to 3,000.
Flat fee $62.43
$62.43
Plan review fee
The plan review fee shall be equal to 45% of the total calculated building permit fee.
see rule
How this jurisdiction calculates the fee

Simple permits require a builder valuation to be entered on the application; the permit fee is then read off BUILDING PERMIT FEE TABLE A in the Master Fee Schedule using that valuation, plus the 45% plan review fee.

Source: published fee schedule · Verified 11/9/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, valuation 1.00 to 1,000
Flat fee $30.00
$30.00
Plan review fee
The plan review fee shall be equal to 45% of the total calculated building permit fee.
see rule
How this jurisdiction calculates the fee

Washington City does not publish a separate fence permit fee. Where a permit is required, the fee is read off BUILDING PERMIT FEE TABLE A in the Master Fee Schedule using the project valuation, plus the 45% plan review fee.

Source: published fee schedule · Verified 11/9/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $1,000 (lowest bracket, Building Permit Fee Table A)
Flat fee $30.00
$30.00
○Valuation $99,001 to $100,000 (top of Table A)
Flat fee $738.93
$738.93
How this jurisdiction calculates the fee

Washington City does not publish a roofing-specific or flat re-roof fee. Building permit fees are set by valuation on the city's Building Permit Fee Table A, and the plan review fee is stated as 45% of the total calculated building permit fee. Above the table, the schedule reads "$738.93 for the first $100,000.00 plus $4.03 for each additional $1,000.00, or fraction thereof, to and including $500,000.00." Fee table published at https://washingtonutah.gov/development/building/buildingfeeschedule (the site formerly served at washingtoncity.org redirects there).

Source: published fee schedule · Verified 11/9/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit, lowest valuation band ($1.00 to $1,000)
Flat fee $30.00
$30.00
○Building permit base at $100,000 valuation (plus $4.03 per additional $1,000)
Flat fee $738.93
$738.93
Plan review · add-on
45% of the calculated building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Washington City (Washington County, Utah) publishes no flat retaining-wall permit fee. The Building section of the City Master Fee Schedule prices every building permit from valuation in two steps: valuation is derived from an adopted Square Foot Construction Costs table (Table B, keyed to 2018 IBC occupancy groups and construction types, with private garages valued as Utility/miscellaneous and unfinished basements at $15 per square foot), and the permit fee is then read from Building Permit Fee Table A, a graduated valuation-to-fee table whose lowest band, valuation $1.00 to $1,000, is $30.00. Above $100,000 the fee is $738.93 for the first $100,000 plus $4.03 for each additional $1,000 or fraction thereof, to and including $500,000. The plan review fee is 45% of the total calculated building permit fee. Utah's 1% state surcharge under Utah Code 15A-1-209 is statutory statewide but is not itemised in this schedule.

Source: published fee schedule · Verified 11/5/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Square foot construction cost, U utility/miscellaneous, Type VB - used for private garages (dollars per square foot)
Flat fee $31.46
$31.46
○Building permit fee, valuation 9,001. to 10,000.
Flat fee $141.18
$141.18
Plan review fee
The plan review fee shall be equal to 45% of the total calculated building permit fee.
see rule
How this jurisdiction calculates the fee

The shed/patio cover application requires a builder valuation; the permit fee is read off BUILDING PERMIT FEE TABLE A using that valuation, plus the 45% plan review fee. For a detached private garage the Master Fee Schedule directs use of the Utility, miscellaneous square foot construction cost row in TABLE B.

Source: published fee schedule · Verified 11/9/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, valuation 1.00 to 1,000
Flat fee $30.00
$30.00
○Building permit fee, valuation 1,001. to 1,100.
Flat fee $30.75
$30.75
Plan review fee
The plan review fee shall be equal to 45% of the total calculated building permit fee.
see rule
How this jurisdiction calculates the fee

Simple permits require a builder valuation to be entered on the application; the permit fee is then read off BUILDING PERMIT FEE TABLE A in the Master Fee Schedule using that valuation, plus the 45% plan review fee. Washington City does not publish a flat water heater permit fee.

Source: published fee schedule · Verified 11/9/2026

See the full write-up: Washington building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.