West Jordan, Utah Building Permit Cost Calculator
Estimates permit cost in West Jordan from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Valuation $1 to $2,000 $60.50 base plus $3.70 per each additional $100 | see rule |
Valuation $2,001 to $25,000 $116.00 base plus $16.90 per each additional $1,000 | see rule |
Valuation $25,001 to $50,000 $505.00 base plus $12.20 per each additional $1,000 | see rule |
Valuation $50,001 to $100,000 $810.00 base plus $8.45 per each additional $1,000 | see rule |
Valuation $100,001 to $500,000 $1,233.00 base plus $6.76 per each additional $1,000 | see rule |
Valuation $500,001 to $1,000,000 $3,938.00 base plus $5.75 per each additional $1,000 | see rule |
Valuation more than $1,000,000 $6,803.00 base plus $3.80 per each additional $1,000 | see rule |
○Single family residential 'Same As' (exact plan copy) plan review Flat fee $200.00 | $200.00 |
○Permit processing fee Flat fee $12.00 | $12.00 |
○Demolition permit Flat fee $175.00 | $175.00 |
○Miscellaneous minimum permit (plumbing, electrical, mechanical) Flat fee $70.00 | $70.00 |
How this jurisdiction calculates the fee
Tiered by project valuation per ICC Building Valuation Data (updated each July 1): a base fee plus a rate for each additional $100 (or fraction) in the lowest tier and each additional $1,000 in higher tiers. Residential plan review adds 40% of the permit fee, plus a 1% state surcharge and a $12 permit processing fee.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Miscellaneous minimum permit (plumbing, electrical, mechanical) Flat fee $70.00 | $70.00 |
How this jurisdiction calculates the fee
Miscellaneous minimum permit fee for plumbing, electrical and mechanical work, plus the $12 permit processing fee and 1% state surcharge.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit base fee, valuation $1 to $2,000 (plus $3.70 per additional $100 after $500) Flat fee $60.50 | $60.50 |
○Permit processing fee, each permit issued Flat fee $12.00 | $12.00 |
○Land Disturbance Permit (Planning and Engineering; grading work, not the wall permit itself) Flat fee $165.00 | $165.00 |
How this jurisdiction calculates the fee
West Jordan publishes no flat retaining-wall permit fee. The FY 2027 Consolidated Fee Schedule (effective through 30 June 2027, updated 23 June 2026 by Res. 26-021) prices building permits as a base fee plus an incremental rate, with valuation determined by the current issue of the ICC Building Valuation Data as of July 1 each year. The lowest band, valuation $1 to $2,000, is a $60.50 base fee plus $3.70 for each additional $100 (or fraction) after $500; the $2,001 to $25,000 band is a $116.00 base plus $16.90 per additional $1,000. Residential plan review adds 40% of the building permit fee, a permit processing fee of $12 per permit issued applies, and the State Surcharge is 1% of the building permit fee (Utah Code 15A-1-209). A separate Land Disturbance Permit of $165 sits under Planning and Engineering and applies to grading/land-disturbing work rather than being a retaining-wall building permit fee.
Source: published fee schedule · Verified 11/4/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Valuation $1 - $2,000 $60.50 base fee, plus $3.70 for each additional $100 or fraction thereof after $500 | see rule |
Valuation $2,001 - $25,000 $116.00 base fee, plus $16.90 for each additional $1,000 or fraction thereof | see rule |
Valuation $25,001 - $50,000 $505.00 base fee, plus $12.20 for each additional $1,000 or fraction thereof | see rule |
Valuation $50,001 - $100,000 $810.00 base fee, plus $8.45 for each additional $1,000 or fraction thereof | see rule |
Plan Review - Residential · add-on 40% of the building permit fee — select the permit fee line above to calculate | see rule |
Plan Review - Non-Residential · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
○Permit Processing Fee Flat fee $12.00 | $12.00 |
State Surcharge · add-on 1% of building permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Tiered by project valuation per the Consolidated Fee Schedule building permit table. POPULATED 2026-09-13 (Lane B second tranche): the row previously carried an empty examples array and was therefore unreachable by target selection. The West Jordan Consolidated Fee Schedule (FY-2027-Consolidated-Fee-Schedule, header "Effective through June 30, 2027", "Updated June 23, 2026 Res. 26-021") was downloaded and read in full this pass. It publishes no flat shed or accessory-structure permit fee; a shed is priced from the Building Permits valuation table below, with valuation taken from the current issue of the ICC Building Valuation Data as of July 1st of each year. LAYOUT NOTE: the first bracket uses a per-$100 rate after $500 while every later bracket uses a per-$1,000 rate after that bracket's minimum valuation, and the two rate-column headers are printed as separate stacked blocks - reading a single rate header across the whole table would misprice every bracket.
Source: published fee schedule · Verified 11/9/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Miscellaneous minimum permit (plumbing, electrical, mechanical) Flat fee $70.00 | $70.00 |
How this jurisdiction calculates the fee
Miscellaneous minimum permit fee for plumbing, electrical and mechanical work, plus the $12 permit processing fee and 1% state surcharge.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: West Jordan building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.