B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

West Jordan, Utah Building Permit Cost Calculator

Estimates permit cost in West Jordan from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Valuation $1 to $2,000
$60.50 base plus $3.70 per each additional $100
see rule
Valuation $2,001 to $25,000
$116.00 base plus $16.90 per each additional $1,000
see rule
Valuation $25,001 to $50,000
$505.00 base plus $12.20 per each additional $1,000
see rule
Valuation $50,001 to $100,000
$810.00 base plus $8.45 per each additional $1,000
see rule
Valuation $100,001 to $500,000
$1,233.00 base plus $6.76 per each additional $1,000
see rule
Valuation $500,001 to $1,000,000
$3,938.00 base plus $5.75 per each additional $1,000
see rule
Valuation more than $1,000,000
$6,803.00 base plus $3.80 per each additional $1,000
see rule
○Single family residential 'Same As' (exact plan copy) plan review
Flat fee $200.00
$200.00
○Permit processing fee
Flat fee $12.00
$12.00
○Demolition permit
Flat fee $175.00
$175.00
○Miscellaneous minimum permit (plumbing, electrical, mechanical)
Flat fee $70.00
$70.00
How this jurisdiction calculates the fee

Tiered by project valuation per ICC Building Valuation Data (updated each July 1): a base fee plus a rate for each additional $100 (or fraction) in the lowest tier and each additional $1,000 in higher tiers. Residential plan review adds 40% of the permit fee, plus a 1% state surcharge and a $12 permit processing fee.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Miscellaneous minimum permit (plumbing, electrical, mechanical)
Flat fee $70.00
$70.00
How this jurisdiction calculates the fee

Miscellaneous minimum permit fee for plumbing, electrical and mechanical work, plus the $12 permit processing fee and 1% state surcharge.

Source: published fee schedule · Verified 9/15/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit base fee, valuation $1 to $2,000 (plus $3.70 per additional $100 after $500)
Flat fee $60.50
$60.50
○Permit processing fee, each permit issued
Flat fee $12.00
$12.00
○Land Disturbance Permit (Planning and Engineering; grading work, not the wall permit itself)
Flat fee $165.00
$165.00
How this jurisdiction calculates the fee

West Jordan publishes no flat retaining-wall permit fee. The FY 2027 Consolidated Fee Schedule (effective through 30 June 2027, updated 23 June 2026 by Res. 26-021) prices building permits as a base fee plus an incremental rate, with valuation determined by the current issue of the ICC Building Valuation Data as of July 1 each year. The lowest band, valuation $1 to $2,000, is a $60.50 base fee plus $3.70 for each additional $100 (or fraction) after $500; the $2,001 to $25,000 band is a $116.00 base plus $16.90 per additional $1,000. Residential plan review adds 40% of the building permit fee, a permit processing fee of $12 per permit issued applies, and the State Surcharge is 1% of the building permit fee (Utah Code 15A-1-209). A separate Land Disturbance Permit of $165 sits under Planning and Engineering and applies to grading/land-disturbing work rather than being a retaining-wall building permit fee.

Source: published fee schedule · Verified 11/4/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Valuation $1 - $2,000
$60.50 base fee, plus $3.70 for each additional $100 or fraction thereof after $500
see rule
Valuation $2,001 - $25,000
$116.00 base fee, plus $16.90 for each additional $1,000 or fraction thereof
see rule
Valuation $25,001 - $50,000
$505.00 base fee, plus $12.20 for each additional $1,000 or fraction thereof
see rule
Valuation $50,001 - $100,000
$810.00 base fee, plus $8.45 for each additional $1,000 or fraction thereof
see rule
Plan Review - Residential · add-on
40% of the building permit fee — select the permit fee line above to calculate
see rule
Plan Review - Non-Residential · add-on
65% of the building permit fee — select the permit fee line above to calculate
see rule
○Permit Processing Fee
Flat fee $12.00
$12.00
State Surcharge · add-on
1% of building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Tiered by project valuation per the Consolidated Fee Schedule building permit table. POPULATED 2026-09-13 (Lane B second tranche): the row previously carried an empty examples array and was therefore unreachable by target selection. The West Jordan Consolidated Fee Schedule (FY-2027-Consolidated-Fee-Schedule, header "Effective through June 30, 2027", "Updated June 23, 2026 Res. 26-021") was downloaded and read in full this pass. It publishes no flat shed or accessory-structure permit fee; a shed is priced from the Building Permits valuation table below, with valuation taken from the current issue of the ICC Building Valuation Data as of July 1st of each year. LAYOUT NOTE: the first bracket uses a per-$100 rate after $500 while every later bracket uses a per-$1,000 rate after that bracket's minimum valuation, and the two rate-column headers are printed as separate stacked blocks - reading a single rate header across the whole table would misprice every bracket.

Source: published fee schedule · Verified 11/9/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Miscellaneous minimum permit (plumbing, electrical, mechanical)
Flat fee $70.00
$70.00
How this jurisdiction calculates the fee

Miscellaneous minimum permit fee for plumbing, electrical and mechanical work, plus the $12 permit processing fee and 1% state surcharge.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: West Jordan building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.