West Valley City, Utah Building Permit Cost Calculator
Estimates permit cost in West Valley City from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Basement remodel $53 minimum (varies by square footage) | see rule |
○Basement entry Flat fee $86.12 | $86.12 |
○Garage (footings/foundations) Flat fee $115.40 | $115.40 |
○Demolition Flat fee $53.00 | $53.00 |
○Re-inspection fee Flat fee $53.00 | $53.00 |
○Board of Appeals hearing Flat fee $200.00 | $200.00 |
How this jurisdiction calculates the fee
Flat fee by project type published on the Permit Costs and Fees page; the larger the area affected, the higher the permit cost. Planning/zoning, state surcharge, technology and fire fees are added where applicable.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Deck (covered or uncovered) Flat fee $73.00 | $73.00 |
How this jurisdiction calculates the fee
Flat fee by project type.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical service upgrade, under 200 amps Flat fee $53.00 | $53.00 |
○Electrical service upgrade, 200 to 400 amps Flat fee $79.50 | $79.50 |
○Electrical service upgrade, over 400 amps Flat fee $95.40 | $95.40 |
How this jurisdiction calculates the fee
Flat fee tiered by service amperage for residential electrical service upgrades.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
West Valley City publishes no flat permit fee for fences, sheds/detached accessory structures or retaining walls. The Building Inspections Division's Permit Costs & Fees page opens by stating that permit costs vary with the size of the work, then lists flat prices only for specific named permit types (basement entry, deck, demolition, electrical, mechanical, roofing, solar, swimming pool and similar); no fence, shed, accessory-structure or retaining-wall line appears on it, and items such as fire repair and signs are noted as priced by valuation. The adopted amounts behind those prices are the City's Consolidated Fee Schedule in West Valley City Municipal Code Chapter 1-2, where s1-2-103 (Community and Economic Development Department) contains a graduated valuation-based building permit fee schedule and sets initial plan review at the lesser of actual cost or 65 percent of the building permit fee. The listed permit prices are built as a base fee plus small percentage add-ons (1 percent, consistent with the Utah state surcharge under Utah Code 15A-1-209, plus a further 5 percent), and a Planning & Zoning charge where site review is required.
Source: published fee schedule · Verified 8/12/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Roof re-shingle, single-family dwelling Flat fee $53.00 | $53.00 |
○Roof conversion (flat fee) Flat fee $111.30 | $111.30 |
○Commercial re-roofing Flat fee $530.00 | $530.00 |
How this jurisdiction calculates the fee
Flat fee by project type. The residential re-shingle and roof-conversion figures are published on the Building Inspection FAQ; the commercial re-roof total is published only on the Permit Costs & Fees page, which itemises it as $500 base plus a $5 state fee and a $25 technology fee.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
West Valley City publishes no flat permit fee for fences, sheds/detached accessory structures or retaining walls. The Building Inspections Division's Permit Costs & Fees page opens by stating that permit costs vary with the size of the work, then lists flat prices only for specific named permit types (basement entry, deck, demolition, electrical, mechanical, roofing, solar, swimming pool and similar); no fence, shed, accessory-structure or retaining-wall line appears on it, and items such as fire repair and signs are noted as priced by valuation. The adopted amounts behind those prices are the City's Consolidated Fee Schedule in West Valley City Municipal Code Chapter 1-2, where s1-2-103 (Community and Economic Development Department) contains a graduated valuation-based building permit fee schedule and sets initial plan review at the lesser of actual cost or 65 percent of the building permit fee. The listed permit prices are built as a base fee plus small percentage add-ons (1 percent, consistent with the Utah state surcharge under Utah Code 15A-1-209, plus a further 5 percent), and a Planning & Zoning charge where site review is required.
Source: published fee schedule · Verified 8/12/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
West Valley City publishes no flat permit fee for fences, sheds/detached accessory structures or retaining walls. The Building Inspections Division's Permit Costs & Fees page opens by stating that permit costs vary with the size of the work, then lists flat prices only for specific named permit types (basement entry, deck, demolition, electrical, mechanical, roofing, solar, swimming pool and similar); no fence, shed, accessory-structure or retaining-wall line appears on it, and items such as fire repair and signs are noted as priced by valuation. The adopted amounts behind those prices are the City's Consolidated Fee Schedule in West Valley City Municipal Code Chapter 1-2, where s1-2-103 (Community and Economic Development Department) contains a graduated valuation-based building permit fee schedule and sets initial plan review at the lesser of actual cost or 65 percent of the building permit fee. The listed permit prices are built as a base fee plus small percentage add-ons (1 percent, consistent with the Utah state surcharge under Utah Code 15A-1-209, plus a further 5 percent), and a Planning & Zoning charge where site review is required.
Source: published fee schedule · Verified 8/12/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum fee for an individual building, mechanical, electrical, or plumbing permit (West Valley City Municipal Code 1-2-103, as previously recorded; source not re-readable this pass) Flat fee $50.00 | $50.00 |
○Minimum single-trade permit fee as published on the city Building Inspections Permit Costs & Fees page (conflicts with the code figure) Flat fee $53.00 | $53.00 |
How this jurisdiction calculates the fee
CONFLICT BETWEEN TWO OFFICIAL SOURCES, unresolved (verified 2026-08-31). West Valley City Municipal Code 1-2-103 is recorded as setting a $50.00 minimum fee for an individual building, mechanical, electrical or plumbing permit; that code page (westvalleycity.municipal.codes) returns HTTP 403 to non-browser clients and could not be re-read this pass. The Building Inspections "Permit Costs & Fees" page on the city's own domain (wvc-ut.gov/307) instead prices every comparable single-trade minimum permit at $53 (furnace only, electrical upgrade under 200 amp, roof re-shingle, re-inspection, record change) and carries no water-heater line at all. Neither figure is adopted here; both are recorded pending a reading of the code text. RE-TESTED 2026-09-18 (lane B run 1482) - THE CODE TEXT WAS READ THIS PASS AND THE $50.00 FIGURE IS CONFIRMED, so the "could not be re-read" caveat above is superseded. westvalleycity.municipal.codes still returns HTTP 403 to curl and to a cookie-jar/same-origin-Referer retry, but the section text was read and West Valley City Municipal Code 1-2-103(1)(i)(i) does set the minimum fee for "Building, mechanical, electrical, and plumbing" permits at $50. THE CONFLICT NEVERTHELESS STANDS AND IS NOT RESOLVED HERE: wvc-ut.gov/307 (Permit Costs & Fees), re-read in full today, still prices every comparable single-trade minimum at $53 - "Electrical - upgrade less than 200 amp service: $53", "Mechanical - Furnace only (0-150,000 BTUs): $53", "Roof re-shingle: $53", "Re-inspection Fee: $53", "Demolition: $53 per building", "Record Changes after permit issued: $53" - and still carries no water-heater line at all. Both sources are official and both figures remain recorded; a human must decide which the public page should render.
Source: published fee schedule · Verified 9/18/2026
See the full write-up: West Valley City building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.