205.04 Method of Measurement.
and the lessees shall not preclude the Engineer from inspecting the moved structure and requiring any corrective work to be done that he considers n ecessary. No disposition or modification of the structure, other than that shown on the plans, will be made by any agreement between the Contractor and owner without the prior written approval of the Engineer. If the owners or lessees of any structure refu se to execute a release for the Contractor and, if after inspection, the Engineer determines that the Contractor has done all that could be reasonably expected to be done to affect a satisfactory removal and re- establishment of the structure, the Engineer may certify such upon the Department's form, which will be sufficient to release monies due to the Contractor; however, such certification and release of monies to the Contractor will in no way be construed as a release of the liability or responsibility o f the Contractor under Subarticle 107.14(a), but shall be a release only for the purpose of releasing monies to the Contractor.
205.04 Method of Measurement.
The removal or relocation of structures will be measured per each structure removed or relocated.
205.05 Basis of P ayment.
206.01 Description.
The work under this Section shall cover the removal, wholly or in part, and the satisfactory salvaging or disposal of miscellaneous facilities and obstructions which will not be permitted to remain within the right of way except those items removed and disposed of under other sections of these specifications. Salvaging of materials for reuse by the State will be required only when such is designated b y the plans or proposal; otherwise, the materials shall become the property of the Contractor. Quantities and limits of this type work indicated on the plans are approximate only, subject to the Engineer's evaluation of the actual site condition.
206.02 Ma terials.
All new material required shall meet the applicable requirements of Division 800, Materials.
206.03 Construction Requirements.
206.03 Construction Requirements.
Each existing bridge or portion thereof requires a removal plan to be submitted to the Construction Bureau prior to star ting demolition. The bridge removal plan shall include the following information: • Station numbers for the existing bridge to be removed. • Description of the bridge: number of spans, length and width of bridge, number and types of bridge components. • Sequence of bridge removal. • List of equipment to be used including the make, model, number and size. • List and description/drawings of any proposed temporary encroachments if applicable for removing any bridge components within or over a stream, water body or wetland. Temporary encroachments shall be submitted in accordance with Articles 107.09, 107.23, and applicable plan requirements. • List of all materials and methods proposed to be used in accordance with the plans and stormwater best manageme nt practices to protect to the maximum extent practicable the water quality of the intersecting stream, water body or wetland during the bridge removal. • Estimated length of time for the bridge removal. • Plan for final disposition of materials removed. • Photo graphs of the existing bridge. No demolition work can start until the removal plan has been accepted and distributed. The Contractor and the Project Manager shall meet to discuss the removal plan prior to beginning any demolition work. No existing bridge shall be removed or closed to traffic until satisfactory provisions for the passage of traffic have been made and approved by the Engineer. When the plans provide for using old bridge substructures or parts of them as permanent parts of a new structure, on ly those portions shall be removed which are so indicated on the plans. All portions of existing bridges, including debris, at or just above the mudline of a stream, water body, or wetland shall be removed unless otherwise specified on the plans. Otherwis e, all portions of existing bridges may be either removed entirely or broken down to an elevation of at least 3 feet {1 m} below subgrade or natural ground. During the removal of an existing bridge, no heavy equipment (except as noted above for temporary encroachments) shall be allowed in a stream, water body or wetland. Portions of an existing bridge over a stream, water body or wetland, including any piers/bents within them, shall be removed from the top down utilizing saw cutting or other approved methods which prevent to the maximum extent practicable debris from entering the water. Slurry from any saw cutting operations shall also be contained to the maximum extent practicable. On navigable waterways, provisions shall also be made for waterway traffic in accordance with U.S. Coast Guard and/or Corps of Engineers, Rules and Regulations. The Coast Guard and Corps of Engineers shall be given notification of the dates and work procedures planned for the removal of existing bridges over navigable waterways. The Contractor shall give this notification at least 21 calendar days prior to the date of the beginning of the removal work. Use of methods or equipment which might damage completed structures, structures to be retained, or portions of structures, will no t be permitted. Blasting will not be permitted without prior written approval of the Engineer. Blasting, if approved, shall be in accordance with Article 107.11. Where portions of existing pavement, curb and gutter, walks, and similar items are to remain a nd join the surface of the new work, they shall be removed to an existing joint or cut off to a neat line with vertical face using saws or other approved equipment that will not damage the retained portion of the work. Pipe that is not to be salvaged shall be removed or, if concrete, it may be broken up in place. In removing manholes, inlets, etc., any live sewers connected with them shall be satisfactorily bypassed, rebuilt, and reconnected without additional compensation. Removing railway or street railwa y tracks shall include removal of all rails, paving, switches, frogs, guardrails, ties, track, encasement, and other appurtenances. Ballast and concrete foundations shall be included unless otherwise directed. Removing pipe headwalls shall include removal and disposal of the encased joint of pipe unless otherwise directed.
206.04 Disposal of Materials.
Rubble shall be removed in accordance with the requirements shown on the plans. Walls and foundations that are not needed shall be removed to an elevation at least 2 feet {600 mm} below excavation limits in excavation areas, 3 feet {1 m} below subgrade in embankment areas and to ground level or as directed elsewhere. All trenches and excavations resulting from the removal or breaking down of old culverts or structures shall be filled with suitable materials placed in accordance with Section 210. Any reinforcing steel to be left in place to serve as dowels or ties shall not be injured by the removal of the concrete. Such dowels or ties shall be cleaned and straightened or bent as requir ed to fit new work. Removing cable guiderail shall include removal and disposal of all related items (Cables, end anchors, footings, posts, concrete pads, hardware, etc.) associated with the cable guiderail system.
206.04 Disposal of Materials.
206.06 Basis of Payment.
206.05 Method of Measurement.
Each old bridge or portion thereof, each box culvert or culvert type structure, exclusive of pipe culverts to be removed and for which direct payment is to be made, will be designated on the plans by its station number and description, and for the purpose of measurement and payment will be considered a complete and separate unit. The quantity of plain or reinforced concret e pavement, plain or reinforced concrete base, and cement treated base removed, including overlying surface, will be measured and the surface area computed in square yards {square meters}. The quantity of other surfaces and bases removed will be measured by cross sections as unclassified excavation. Removing concrete or stone curb, combination curb and gutter, gutter and valley gutter, including any overlying surface material, will be measured in linear feet {meters}. Concrete sidewalk and concrete crosswal k removed as directed will be surface measured and the area computed in square yards {square meters}. The length of culvert pipe removed will be measured in linear feet {meters}. The quantity of pipe headwalls, manholes, inlets, and catch basins removed will be the number of separate units. The Removal of Rubble as described on the plans will be measured as one lump sum unit. Guardrail removed as directed will be measured in linear feet {meters} along the top of the rail in place between extreme l imits of an installation. Railway track removed will be measured in linear feet {meters} of separate two -rail track. A turnout will be measured as a separate two -rail track beginning at the point of frog. Where rails have previously been removed, removal o f the remaining crossties, concrete foundation, and all remaining track appurtenances will not be measured and paid for but considered as a part of clearing and grubbing. Cable guiderail removal will be measured in linear feet {meter} along the length of t he top cable from anchor to anchor. Removal shall include all items associated with the cable guiderail system. No additional costs will be paid for removal of associated items of the cable guiderail system.
206.06 Basis of Payment.
208.01 Description.
SECTION 208 REMOVAL AND REINTERMENT OF GRAVES
208.01 Description.
This Section shall cover the services necessary to remove, disinter, and reinter graves or remains found within the limits of the highway right of way. The removal, disinterment, and reinterment shall be in compliance with all State, County, and/or City ru les and regulations. Reinterment shall be in approved, established cemeteries or burial grounds. The number of graves specified in the contract is approximate only; the actual number may vary and will depend upon a close investigation of the existing buria l site during preliminary grading operations. Only the number of graves actually moved as directed will be paid for at the contract unit price, and no claim will be allowed for extra compensation due to overruns or underruns of the items provided under thi s Section.
208.02 Materials.
All materials furnished for use in connection with work under this item must be acceptable to the Engineer and suitable for the particular work with which it is associated.
208.03 Construction Details.
208.04 Method of Measurement.
The removal, disinterment, and reinterment of grav es, when provided by the plans or proposal, shall be measured in individual grave units, with each grave actually removed and relocated considered as a separate individual unit.