610PAINTING

AZ · 2021 Standard SpecificationsBook pages View official source ↗

SEC TION 610 609- 5 Basis of Payment: The accepted quantities of drilled shafts and rock sockets, measured as provided above, will be paid for at the contract unit price per lineal foot for the diameter designated in the bidding schedule, complete in place. Price shall include excavation and disposal of spoils; drilling slurry; metal casing; steel reinforcing; Portland cement concrete; any needed forming, curing and finishing; exposing of concrete and the subsequent repair of foundations; furnishing all materials, equipment, and labor for splic ing of reinforcing steel; all labor, conduit, and equipment for CSL and GGL; and all required testing and test reports. No additional payment will be made for metal casing that is to remain in place. No additional payment will be made for confirmation shafts, as the costs are considered to be included in the cost of constructing the drilled shaft foundation. Payment for belled sections will be at the contract unit price for each type of foundation cons tructed, including excavation and concrete beyond the diameter of the shaft. Obstructions will be defined as either material or objects of excessive dimension, which were not recorded in the geotechnical and foundation report, either in the text or boring logs. Payment for obstructions will be made in accordance with the provisions of Subsection 109.04 of the specifications. SECTION 610 PAINTING: 610- 1 Description: The work under this section shall consist of furnishing paint and other materials and painting concrete, structural steel, or other surfaces where shown on the plans in accordance with the requirements of the specifications. The work shall include preparation of the surfaces to be painted, the protection and drying of the paint coatings and the protection of pedestrian, vehicular or other traffic near or under the work from paint spatter and disfigurement. 610- 2 Materials: Paint shall conform to the requirements of Section 1002 of the specifications, unless otherwise specified. TABLE OF CONTENTS INDEX 610- 3 Construction Requirements: 610- 3.01 Weather Conditions : Paint shall be applied only on thoroughly dry surfaces and only when the atmospheric temperatur e is in the range from 50 degrees F to 100 degrees F, inclusive, and when the relative humidity is at or below 75 percent. Paint shall only be applied to a surface which is at least 5 degrees F above the dew point. The surface temperature should remain above the minimum temperature specified above until the paint is thoroughly dry. Paint shall not be applied when the air is misty or when weather conditions exist which might damage the work. If fresh paint is damaged by the elements, it shall be replaced or repaired by the contractor at no additional cost to the Department. The contractor may provide suitable enclosures to permit painting during inclement weather. 610- 3.02 Surface Cleaning :

A.Metal Surfaces: All surfaces of structural steel or other metals, except galvanized surfaces, shall be cleaned prior to painting. All surfaces of new structural steel or other metals which are to be painted shall be blast cleaned to a near -white finish in accordance with SSPC Standard SP10, unless otherwise specified or approved in writing by the Engineer. When repainting existing steel structures, the method of cleaning will be specified in the Special Provisions. Areas not designated for repainting which are damaged as a result of the contractor's operations shall be repaired by the contractor, at no additional cost to the Department, and as approved by the Engineer.
1.Blast Cleaning: All dirt, rust, old paint, mill scale, and other foreign material shall be removed from steel or other metal surfaces with an approved blast cleaning apparatus. Blast cleaning shall leave all surfaces with a dense, uniform anchor pattern or profile of 1.0 to 3.0 mils, as measured with an approved surface profil e comparator or pressed film replica tape. Abrasives used for blast cleaning shall be clean dry sand, mineral grit, steel shot, or steel grit and shall be graded to produce satisfactory results. The use of other abrasives will not be permitted unless approved in writing by the Engineer. When blast cleaning is b eing performed near machinery, all journals, bearings, motors and moving parts shall be sealed against entry of abrasive dust. TABLE OF CONTENTS INDEX Blast cleaned surfaces shall be primed or treated the same day blast cleaning is done, unless otherwise authorized by the Engineer. If cleaned surfaces rust or are contaminated with foreign material before painting is accomplished, they shall be recleaned by the contractor at no additional cost to the Department.
2.Steam Cleaning: All dirt, grease, loose chalky paint , or other foreign material which has accumulated on previously painted surfaces shall be removed with a steam cleaning apparatus prior to all other phases of cleaning. It is not intended that sound paint be removed by this process. After steam cleaning, any paint which has become loose, curled, lifted, or loses its bond to the preceding coat or coats shall be removed to sound paint or metal surface by the contractor at no additional cost to the Department. A detergent shall be added to the feed water of t he steam generator or applied to the surface to be cleaned. The detergent shall be of such composition and shall be added in such quantity that the specified cleaning is accomplished. Any residue, detergent or other foreign material which may accumulate on cleaned surfaces shall be removed by flushing with fresh water. Steam cleaning shall not be performed more than two weeks prior to starting painting operations or other phases of cleaning. Subsequent painting shall not be performed until the cleaned surf aces are thoroughly dry and in no case in less than 24 hours after cleaning.
3.Hand Cleaning: Manual or powered wire brushes, hand scraping tools, power grinders, or sandpaper shall be used to remove all dirt, loose rust, mill scale, or paint which is not fi rmly bonded to the surfaces.
4.Water Blast Cleaning: Water blast cleaning shall be done in accordance with NACE (National Association of Corrosion Engineers) Standard RP -01-72 with normal water, no additives to the water will be allowed. All areas of oil and grease on surfaces to be coated shall be hand cleaned with clean petroleum solvents. The solution of solvent and contaminates shall be wiped clean and the surfaces allowed to air dry prior to the water blast cleaning. The contractor shall not use power spray equipment or similar methods to apply the solvent. All the surfaces to be coated shall be power washed with a water pressure of not less than 2000 pounds per square inch and not greater than 5000 pounds per square inch. The water blasting equipment shall have a minimum water usage of 5 gallons per minute. TABLE OF CONTENTS INDEX Water blast cleaning shall be perform ed no more than two weeks prior to the start of painting operations or other phases of cleaning. Subsequent painting shall not be performed until the cleaned surfaces are thoroughly dry and in no case less than 24 hours after cleaning.
B.Concrete Surfaces: Prior to painting concrete surfaces, laitance and curing compounds shall be removed from the surface by abrasive blast cleaning in accordance with the requirements of ASTM D4259. The cleaned surface shall have a roughened, textured appearance consistent w ith the surrounding concrete surface. Concrete surfaces shall be thoroughly dry and free of dust at the time the paint is to be applied. Any artificial drying procedures and methods shall be subject to approval by the Engineer.
C.Surfaces other than Metal or Concrete: Prior to painting any surfaces other than metal or concrete, the surface shall be in accordance with the manufacturer recommendations and as approved by the Engineer. 610- 3.03 Application: Painting shall be accomplished in a neat and professional manner. For painting metal surfaces, paint shall normally be applied by spraying with limited use of hand brushes or rollers. For painting concrete surfaces, the contractor shall develop an Application Plan according to the manufacturer's written recommendations. The Plan shall include:
A.Rate of application;
B.Number of necessary coats (minimum of two coats) ;
C.Ambient air temperature;
D.Ambient surface temperature;
E.Application equipment ;
F.Qualification of workers;
G.Safety and damage protection; and
H.Proposed surface preparation. For painting concrete surfaces, the contractor shall apply all paint applications to a test specimen or to the concrete surface, according to Application Plan, for the subsequent approval of the Engineer. The contractor shall refinish the test inspection areas to match the paint finish of the surrounding concrete surfaces. TABLE OF CONTENTS INDEX 610- 3.04 Protection Against Damage: The contractor shall provide protective devices as necessary to prevent damage to the work and to other property or persons from all cleaning and painting operations. Paint which result s in an unsightly appearance on surfaces not designated to be painted shall be removed or obliterated as approved by the Engineer. All painted surfaces that are marred or damaged as a result of the contractor's operations shall be repaired with materials and to a condition equal to that of the paint coating specifie d herein. Upon completion of all painting operations and of any other work the painted surfaces shall be thoroughly cleaned. 610- 3.05 Painting :
A.Metal Surfaces:
1.General: All surfaces of new metals shall be painted with one shop coat (primer) and two field coats (the intermediate coat and topcoat), unless otherwise specified. All paints used shall be appropriately chosen from among the types described in Subsections 1002 -2.01 through 1002- 2.05 of the specifications and shall conform to the requirements given therein. The dry film thickness of the paint will be measured in place with a calibrated magnetic film thickness gauge in accordance with SSPC Standard PA2. If the minimum dry film thickness is exceeded, it shall be limited to that which will result in uniform drying throughout the paint film.
2.Primer: The dry film thickness of the primer shall not be less than 2.0 mils and be sufficient to cover the blast profile pattern. A deep profile pattern from steel shot blasting may require additional applications of primer to obtain sufficient coating of the steel surface. After structural steel has been fabricated, bl ast cleaned and accepted by the Engineer, all surfaces, except metal surfaces which are to be embedded in concrete, or within 3 inches of a high strength bolted connection, shall be painted with a primer. TABLE OF CONTENTS INDEX Structural steel which is to be welded shall not be painted before welding is complete. If it is to be welded only in the fabricating shop and subsequently erected by bolting, it shall receive one coat of primer after the shop welding is completed. Areas of structural steel to be field welded shall be masked and the remainder of the steel shall be given one coat of primer. As soon as practicable after being accepted by the Engineer and prior to removal from the shop, machine- finished surfaces shall be coated with a rust inhibitor which can easi ly be removed. Surfaces of milled or finished iron and steel castings shall be painted with one coat of primer. Erection marks for field identification of steel members and weight marks shall be painted upon surface areas previously painted with the primer.
3.Intermediate Coat: The intermediate coat shall be appropriately tinted to contrast with the primer . The dry film thickness of the intermediate coat shall not be less than 2.0 mils. After ere ction of steel structures has been completed, including all riveting, welding, bolting , and any straightening of bent metal, all adhering rust, scale, dirt, grease, and other foreign material shall be removed as specified under Subsection 610- 3.02 of the specifications. All areas where the primer is damaged or deteriorated shall be thoroughly cleaned and spot painted with the same type of paint used for the primer and to the specified dry film thickness. When the spot painting coat is thoroughly dry, the i ntermediate coat shall be applied. In no case shall a succeeding coat be applied until the previous coat has dried throughout the full thickness of the paint film.
4.Topcoat: All small cracks and cavities which have not become sealed in a watertight manner by the intermediate coat shall be filled before the topcoat is applied. At the option of the contractor, the intermediate coat and the topcoat may be applied in the shop. When f inished coats are applied in the shop, the contractor shall repaint all damaged or deteriorated areas in the field as directed by the Engineer. The dry film thickness of the topcoat shall be not less than 2.0 mils.
B.Concrete Surfaces: When painting is specified on the plans or in the special provisions, paint conforming to the requirements of Subsection 1002- 2.06 of the TABLE OF CONTENTS INDEX specifications, shall be applied to the exposed concrete surfaces tabulated below, except that sidewalks, appurtenant cur bs, downdrains, and bridge deck surfaces shall be excluded. All concrete shall be finished and cured in accordance with the requirements of the specifications prior to the application of the paint.
1.Cast -in-Place Box Girder Bridges: All surfaces of the superstructure, including the sides and bottoms of the box girders, shall be painted.
2.Pre-cast I -Girder Bridges: Bridge structures with vehicular traffic passing beneath at posted speeds of less than 55 miles per hour, or with pedestrian traffic beneath, shall be painted on all surfaces of the superstructure including both sides and bottoms of the pre- cast girders and the underside of decks. Bridge structures with vehicular traffic passing beneath at posted speeds of 55 miles per hour or more, and with no pedestrian traffic beneath, shall be painted on all surfaces of the superstructure with the exception of the sides of the interior girders, the interior side of exterior girders, and the underside of the deck.
3.Pre-cast Box and Slab Girder Bridges: All surfaces of the superstructure including the sides of exterior girders and the bottom surfaces of the box or slab girder when exposed to traffic view shall be painted.
4.Bridge Substructure and Walls: All surfaces of bridge piers, including the pier caps and bottoms of integral pier caps, piles, columns, parapet walls and abutments, concrete retaining walls and noise barrier walls shall be painted to at least 1 foot below finished grade.
5.Barriers: All surfaces of bridge barriers and the sides and tops of permanent barriers not adjacent to the traveled way shall be painted.
C.Surfaces other than Metal or Concrete: Surfaces other than metal or concrete shall be painted as recommended by the paint manufacturer and as approved by the Engineer. TABLE OF CONTENTS INDEX All miscellaneous steel items that are not elements of bridges, cantilever sign supports, or bridge truss sign structures, may be hand- cleaned and have the required field paint coats applied in the shop. 610- 3.06 Painting Damaged Galvanized Coating : Damaged areas of galvanized coating shall be roughened by sanding or acid treatment. The roughened areas shall be painted with two coat s of zinc- rich primer , conforming to the requirements of Subsection 1002- 2.02 of the specifications . 610- 4 Field Adhesion Testing: Random adhesion testing of the completed paint f inish may be performed by the Department after a minimum of 30 days from the time of application. If adhesion testing is performed, it will be done according to one or both of the following methods and shall meet the respective requirements. When testing is performed in accordance with ASTM D4541, Method E, a strength of at least 100 pounds per square inch is required. When testing is performed in accordance with ASTM D3359, Method A, a rating of 3A or higher is required. 610- 5 Basis of Payment: No measurement or payment will be made for painting as specified herein and on the plans, or for independent laboratory tests, surface preparation, and supplying samples, the cost being considered as included in the prices paid for the various contract items of work involving painting. TABLE OF CONTENTS INDEX SECTION 701 SECTION 701 MAINTENANCE AND PROTECTION OF TRAFFIC: 701- 1 Description: The work under this section shall consist of providing flagging services and pilot trucks, and furnishing, installing, maintaining, moving and removing barricades, warning signs, lights, signals, cones, and other traffic control devices to provide safe and efficient passage through and/or around the work and to protect workers in or adjacent to the work zone. The work shall be done in accordance with the requirements of Part 6 of the Manual on Uniform Traffic Control Devices (MUTCD) and the associated A rizona Department of Transportation supplement. When referred to herein, these documents will be referred to as MUTCD and associated ADOT Supplement. The requirements of the MUTCD and associated ADOT Supplement shall be considered as the minimum standards for the protection of workers and the traveling public. When a traffic control plan is included in the project plans, this plan shall govern unless an alternate plan, acceptable to the Engineer, is submitted by the contractor. If no traffic control plan is provided or if the contractor desires to deviate from the provisions for maintaining traffic as described in this section, it shall submit to the Engineer for approval a proposed sequence of operations and a compatible method of maintaining traffic. The contractor’s submittal shall be prepared by an individual meeting one of the following criteria:
A.Has successfully completed a recognized traffic control supervisor training and certification program. The traffic control supervisor training and certification provided by the American Traffic Safety Services Association (A.T.S.S.A.) or the International Municipal Signal Association (IMSA) shall be acceptable. Training and certification through other programs must be approved in advance by the Engineer. The individual’s training and certification shall be current and must be valid throughout the duration of the pr oject. In order to remain current with the Department, training and certification shall be completed or renewed at least once every four years; or
B.Be a licensed professional engineer registered in the State of Arizona and have completed an approved traffi c control supervisor training program, as specified in Subsection

108.03 of the specifications. The training shall be current

and must be valid throughout the duration of the project. In order for the training to remain current with the Department, it sh all be completed or renewed every four years. TABLE OF CONTENTS INDEX SECTION 701 The contractor shall submit proof of the proposed individual’s credentials at the preconstruction conference. The contractor bears all responsibility for any such contractor -submitted traffic control plan, whe ther prepared by its direct employee or other individual. The contractor’s proposal shall be submitted early enough to allow at least two weeks for review and approval before use of the proposed traffic control plan. The traffic control and safety plan of the contractor, along with the contractor's work schedule and actual operations, shall be such that no condition that is considered to be unsafe, in the opinion of the Engineer, shall exist. The traffic control plan shall assure that miscellaneous operati ons occurring throughout the work, as well as during the final stages, are adequately protected. As a result of effective planning and efficient scheduling of the type and quantity of work, the duration, degree, length, amount, size, etc., of any traffic restriction or lane closures shall be limited to that absolutely necessary to provide a safe condition for both traffic and construction personnel. 701- 2 Materials (Equipment, Workers, Devices and Facilities): 701- 2.01 General:

A.Conformance : Except as specified herein, all equipment, procedures used by workers, devices and facilities shall conform to the requirements of the MUTCD and associated ADOT Supplement.
B.Safety:
1.General Requirements: All traffic control devices listed below as Category I and Cat egory II devices shall meet the evaluation criteria for Test Level III per NCHRP (National Cooperative Highway Research Program) Report 350. At the pre- construction conference the contractor shall submit a letter certifying that all such traffic control devices to be used on the project will meet the above- referenced criteria. The certification shall contain the following:
a.A list of all Category I and II traffic control devices to be used on the project ;
b.The project number ; TABLE OF CONTENTS INDEX SECTION 701
c.A statement verifying that these devices, and their application, meet the requirements of NCHRP Report 350 Test Level III ; and
d.The name, title and signature of a person having legal authority to bind the manufacturer or supplier of the Category I and II devices. The binding authori ty shall be in accordance with the applicable requirements of Subsection 106.05(B) of the specifications . If additional Category I and II devices are required at a later date, the contractor shall provide an amended certification letter to the Engineer specifying that such devices also comply with the requirements of NCHRP Report 350 Test Level III. For all Category I and Category II devices used on the project the contractor shall also acquire or have access to reports which verify that such devices meet the above- referenced criteria. The reports shall contain the name and model of the tested traffic control devices, detailed drawings or product literature of each, and under what conditions the devices passed. The traffic control devices detailed in t he report shall be the complete warning devices, including warning lights, flags, ballast and any other auxiliary attachment allowed. Reports for Category II devices are prepared by the FHWA. For Category I devices, the supplier is responsible for testing the product and providing a report which verifies that the device meets the criteria of NCHRP Report 350, Test Level III. If requested by the Engineer, the contractor shall provide copies of such reports within one working day.
2.Category I Devices: Categ ory I devices are low -mass traffic control devices that will not cause an appreciable change in speed of an impacting vehicle, nor is it likely that any part of the device will intrude into the passenger compartment. The following traffic control devices will be considered Category I devices: rubber or plastic traffic cones, rubber or plastic tubular markers, single piece plastic drums, plastic or fiberglass delineators. No warning lights, signs, flags or other auxiliary devices are allowed on Cat egory I devices. Should any of these attachments be added to a Category I device, the Category I device will be considered a Category II device. Ballast at the base, such as a rubber tire, is an acceptable attachment to Category I devices. The single pi ece plastic drum refers to the construction of the body of the drum exclusive of a separate base, if any.
3.Category II Devices: Category II devices are low -mass traffic control devices that will not cause a significant change in speed of an impacting vehicl e. The following traffic control devices will be considered Category II devices: type I, II, and III barricades with or without warning lights; vertical TABLE OF CONTENTS INDEX SECTION 701 panels with or without warning lights; signs and sign stand (all types) with or without warning lights and/or flags; drums, other than those listed in Category I, with or without warning lights; and any Category I devices with attached warning lights. 701- 2.02 Flashing Arrow Panels : Flashing arrow panels shall conform to the requirements of the MUTCD and associated ADOT Supplement with the following additions: Each arrow panel shall have its own independent power source. The power source shall be capable of supplying adequate continuous power for the sign operation over extended periods of time. Fuel capacity shall be such as to provide for at least 12 hours of continuous operation without refueling. Panels may be solar powered with adequate energy source to provide for at least 12 hours of continuous operation without refueling or recharging. 701- 2.03 Temporary Concrete Barrier: Temporary concrete barrier shall be precast sections conforming to the requirements of Signing and Marking Standard Drawing C -3 and Subsections 910- 2 and 910- 3 of the specifications. The contractor shall provide, at the preconstruction conference, a certificate of compliance, conforming to the requirements of Subsection

106.05 of the specifications, s tating that any temporary concrete barrier

to be used on the project conforms to Signing and Marking Standard Drawing C- 3. The contractor shall include the project number on the submittal. 701- 2.04 Temporary Impact Attenuation Devices: Temporary impact attenuation devices shall conform to the requirements of Subsections 702- 2 and 702- 3 of the specifications for the type of device shown on the project plans or as approved by the Engineer. Temporary Impact attenua tion devices shall also meet evaluation criteria for Test Level 3 per NCHRP (National Cooperative Highway Research Program) Report 350, or for Test Level 3 per MASH (AASHTO Manual for Assessing Safety Hardware) . The contractor shall provide, at the preconstruction conference, a certificate of compliance, conforming to the requirements of Subsection 106.05 of the specifications, certifying that any temporary impact attenuation devices to be used on the project will meet the above requirement. The contractor shall include the project number on the submittal. TABLE OF CONTENTS INDEX SECTION 701 701- 2.05 Temporary Pavement Markings:

A.Temporary Raised Pavement Markers and Chip Seal Pavement Markers: Temporary Pavement Markers may be Temporary Reflective Markers, Permanent Reflective Markers ( used as Temporary) or Non- Reflective Markers, as required on the Project Plans or as approved by the Engineer. Temporary Pavement Markers shall be in conformance with Standard Drawings M -19 and M -20, and Subsections 706- 2 and 706- 3 of the specifications, a nd will be included on a list of pre- approved products maintained by the Department. Chip Seal Pavement Markers shall conform to Standard Drawing M -20. The Chip Seal marker body and cover shall be manufactured from a polyurethane material conforming to the following requirements: Requirement ASTM Test Method Specific Gravity (Min.) 1.19 D792 Hardness (Min.) 80A D2240 Tensile Strength (Min. PSI) 4,600 D412 Ultimate Elongation (Min. %) 330 Modulus @ 300% PSI 1,000 Stiffness @ -20 °F (Min. PSI) 70 °F (Min. PSI) 17,000 D1053 Compression Set 22 hrs. @ 70 °C 65 D395 Taber Abrasion; CS 17 wheel, Wt. Loss (mg/1000 cycles) 3 --- Reflective tape shall be metalized polycarbonate microprism retroreflective material with acrylic backing or equal. The tape shall have a minimum reflectance equal to or greater than 1,800 candelas per foot -candle per square foot at 0.10- degree observation and 0-degree entrance angles.
B.Preformed Pavement Markings: Preformed Pavement Markings shall be either Type II (Temporary-Removable) or III (Temporary- Nonremovable), as indicated on the project plans or as approved by the Engineer. Preformed Pavement Markings shall be in conformance with the requirements of Section 705 of the specifications and shall be included on a list of pre- approved products maintained by the Department. TABLE OF CONTENTS INDEX SECTION 701 701- 2.06 Temporary Sign Supports: Temporary Sign Supports may be wood, steel or aluminum, at the option of the contractor and shall be approved by the Engineer prior to installation. Wood posts shall be Southern Pine, Douglas Fir or other soft wood. Wood posts need not be treated. Embedded posts shall meet the criteria established under NCHRP Report 350 for breakaway sign supports. Angle braces will not be allowed. 701- 2.07 Delineators: Delineators shall be as shown on the plans and shall be in conformance with the Standard Drawings and Subsection 703- 2 of the specifications. 701- 2.08 Barricades and Other Channelizing Devices: Type I barricades having a minimum of 270 square inches of retroreflective area facing traffic, and otherwise conforming to the MUTCD, may be used in lieu of Type II barricades in freeway or other high speed applications, unless specifically excepted in the project plans. All sheeting for barricades and other channelizing devices shall conform to the requirements of Section 1007 of the specifications. 701- 2.09 Drums: Sheeting type for drums shall conform to the requirements for work zone devices shown in Section 1007 of the specifications . 701- 3 Construction Requirements: 701- 3.01 General: The contractor shall provide for the adequate protection of all vehicular and pedestrian traffic and workers through any portion of the work where construction operations interfere with, obstruct, or create a hazard to the movement of traffic. At the pre- construction conference, the contractor shall provide the Engineer with the name of the contractor's employee who is responsible for implementing, monitoring, and altering, as necessary, t he traffic control plan. The Engineer will then advise the local law enforcement agency having jurisdiction, of the names of the contractor's representative and a representative of the Department who will act in a similar capacity. The contractor's desig nee shall be available at any time to respond to calls involving damage or displacement to barricades, TABLE OF CONTENTS INDEX SECTION 701 lights, signs and other devices resulting from vandalism, traffic accident or other causes. If, at any time, the Engineer determines that sufficient traf fic control is not being provided or maintained, the Engineer may order suspension of the work until the proper level of traffic control is achieved. In cases of serious or willful disregard for safety of the public or workers by the contractor, the Engineer may proceed to place the traffic control measures in proper condition and deduct the cost thereof from monies due or becoming due the contractor. All contractor's personnel, equipment, machinery, tools and supplies shall be kept clear of active traffic lanes, except as necessary for the prosecution of the work. The contractor shall promptly remove any material or debris that is spilled or tracked onto the traveled roadway as a result of the prosecution of the work at no additional cost to the Department. Materials, vehicles and parked equipment shall be kept as far from the traveled way as practical. The contractor shall not park equipment or store materials within 30 feet of the edge of a traveled way unless an adequate barrier is present. Equipment may be parked and materials may be stored in the right -of-way only at locations approved by the Engineer. Any devices provided under this section which are lost, stolen, destroyed or are deemed unacceptable by the Engineer, while their use is required on the project, shall be replaced by the contractor and, except as hereinafter specified for temporary impact attenuators, at no additional cost to the Department. All such devices shall be replaced by the end of the work shift unless otherwise specified. The Engineer shall be sole judge as to which signs may require embedded posts, portable stands or another type of support. 701- 3.02 Maintenance and Protection of Traffic: All traffic control devices necessary for the first stage of construction shall be properly placed and in operation before any construction is allowed to start. When work of a progressive nature is involved, such as resurfacing a roadway under traffic, the necessary devices shall be moved concur rently with the advancing operation. The use of temporary devices shall not be extended beyond the anticipated duration of one work shift's production. All traffic control devices shall be kept clean and free from dirt, mud, and roadway grime. Scratches, rips and tears in reflective sheeting, or loss of fluorescence in fluorescent prismatic sheeting, as determined by the Engineer, shall be promptly corrected by the contractor. Temporary pavement markings shall be applied in conjunction with changes in the traffic pattern. Placement of new pavement markings and removal of old markings shall be done immediately when the need TABLE OF CONTENTS INDEX SECTION 701 for each arises. Temporary markings and devices shall be removed and new roadway marking shall be completed within 24 hours after any changes in traffic pattern unless otherwise directed by the Engineer. Obliteration of the temporary pavement markings shall be in conformance with Subsection 701- 3.06 of the specifications. Types of barricades, supports or devices not specifically described in the MUTCD and associated ADOT Supplement, but which would cause a hazard to traffic if used by the contractor, will not be permitted in the work area. The methods used by a contractor to control traffic when there are no details included in the contract, shall produce a safe condition for travel to the maximum extent possible at all times. 701- 3.03 Temporary Concrete Barriers: Barriers s hall be installed in accordance with the details and at the locations shown on the project plans or where directed by the Engineer. Sections of temporary barrier shall be fastened together as shown on the Standard Drawings to form a continuous chain. Aft er placement, each unit shall be moved longitudinally to remove slack in the joints between the units. Where shown on the project plans or directed by the Engineer, the ends of the barrier run shall be flared back or fitted with an impact attenuation devi ce. Attenuation devices shall be installed in accordance with the requirements of Subsection 701 -3.04 of the specifications. Barrier Markers shall be installed as shown on the project plans or standard drawings. Any unit which has been excessively damaged, as determined by the Engineer, shall not be used. Any unit damaged during or after installation shall be replaced with an undamaged unit by the close of that work shift, at no additional cost to the Department. Temporary Glare Screen shall be installed on barriers at locations shown on plans, and on barriers used to separate opposing traffic on freeway construction contracts in urban areas. When barrier is used on freeway construction to separate traffic from construction operations, glare screen may be required when construction activity is continuous for at least 1,500 feet adjacent to the active traffic lanes. Temporary Glare Screen shall be expanded metal or plastic attached to the barrier by a method satisfactory to the Engineer. Temporary Glare Screen shall have the following characteristics:
A.When hit, the device shall not penetrate the passenger compartment of the errant vehicle or present a hazard to workers and other traffic;
B.The device shall perform in a predictable manner when hit ; TABLE OF CONTENTS INDEX SECTION 701
C.The device shall effectively reduce glare from oncoming vehicle head lights; and
D.The device shall be resistant to vandalism and vehicle damage, and shall be easy to repair. 701- 3.04 Temporary Impact Attenuation Devices: Energy absorbing terminals be installed at the locations in accordance to the details shown on the project plans and the manufacturer's instructions. Devices that are damaged by the traveling public shall be repaired within 36 hours by the contractor utilizing a replacement parts package, which shall be on the job site whenever this system is in use. The replacement parts package supplied by the contractor shall be the one recommended by the manufacturer of the attenuation device in use. Upon completion of the work for which energy absorbing terminals are required, all temporary terminals used during the project and the associated replacement parts packages shall be carefully removed and stockpiled by the contractor within the limits of the project at a location specified by the Engineer and shall become the property of the Department. Sand barrel crash cushions conforming to the requirements of Subsection 702- 2.03 of the specifications shall be placed in accordance with the details shown on the project plans. Crash cushions damaged by the traveling public shall be removed and disposed of by the contractor. New devices shall be furnished and installed by the contractor. The contractor shall repair any damaged installations within 36 hours. Sand barrel crash cushions will remain the property of the contractor upon completion of temporary use unless permanently incorporated into the project. Upon approval of the Engineer, undamaged attenuation devices, sand barrels or metal type, may be used for permanent installation in accordance with the requirements of Subsections 702- 2 and 702- 3 of the specifications. 701- 3.05 Temporary Pavement Markings (Application and Removal):
A.General: Application of temporary pavement markings shall conform to the requirements of Subsection 708- 3 of the specifications, the MUTCD and associated ADOT Supplement, and other provisions of these specifications as applicable. Placement of new markings shall be done immediately when the need for each arises, in conjunction with changes in the traffic pattern. TABLE OF CONTENTS INDEX SECTION 701 Pavement Markings may be required by the Engineer in lieu of barricades for temporary delineation when the duration of use as shown in the traffic control plan may exceed five days or when lane widths are less than 12 feet.
B.Raised Pavement Markers: The adhesive shall be applied uniformly to the cleaned pavement surface and the raised pavement marker shall be placed in the correct position on the adhesive area with the application of pressure as specified by the manufacturer.
C.Preformed Pavement Markings: Preformed pavement markings for temporary applications shall be Type II (Temporary- Removable) and III (Temporary -Nonremovable) and shall conform to the requirements of S ection 705 of the specifications. Preformed Pavement Markings, Type II, shall only be used on surfaces or finish pavement courses where eventual removal will be required. Preformed Pavement Markings, Type III, shall only be used where removal of markings is not required due to obliteration, abandonment or overlaying the pavement surface. 701- 3.06 Obliteration of Existing Pavement Markings : Pavement marking obliteration shall be accomplished by the contractor as indicated on the plans or as directed by the Engineer. Pavement markings shall be removed to the fullest extent possible from the pavement by any method that does not materially damag e the surface, color, or texture of the usable pavement. Abrasive blasting, using air or water, is an acceptable method for removing pavement markings, however, other methods may be approved by the Engineer. Overpainting of markings with paint or asphalt will not be permitted. Sand or other material deposited on the pavement as a result of removing pavement markings shall be removed as the work progresses. Accumulations of sand or other material, which might interfere with drainage or might constitute conditions adverse to traffic safety, shall be removed by the contractor. Where blast cleaning is used for the removal of pavement markings or for removal of objectionable material, the residue, including dust, shall be removed immediately after contact betw een the sand and the surface being treated. Such removal shall be by a vacuum attachment operating concurrently with the blast cleaning operation, or by other methods approved by the Engineer. Blast cleaning shall not be used within 12 feet of a lane occupied by public traffic unless a suitable barrier separates traffic from the area being cleaned. TABLE OF CONTENTS INDEX SECTION 701 Obliteration or removal of raised pavement markers shall include removal of the marker and adhesive pad, or adhesive pad alone if the marker is missing. Any damage to the pavement caused by pavement marking removal shall be repaired by methods acceptable to the Engineer. When asphalt slurry is used to repair damage to the pavement caused by pavement marking removal or the obliteration of the marks remaining aft er the markings have been removed, the asphalt slurry shall be placed parallel to the new direction of travel and shall be at least 2 feet in width. If obliteration of lead- based striping is necessary, it shall be accomplished by a method that is in compli ance with 29 CFR, Lead Exposure in Construction, Interim Final Rule. If lead exposure prevention measures are required, the contractor shall ensure that all contractor personnel, subcontractors, and ADOT personnel present on the job site are notified of t he activity and advised of precautions necessary to avoid contamination by lead compounds. The contractor shall submit a lead exposure plan to the Engineer for review at least 48 hours prior to the start of any striping obliteration activities. Payment for additional work to remove lead- based striping shall be in accordance with Subsections 104.02 or 109.04 of the specifications. 701- 3.07 Truck -Mounted and Trailer -Mounted Attenuator s: The contractor shall provide trucks and truck- mounted attenuators, or trailer -mounted attenuators and host vehicles, at the locations shown on the project plans and/or as directed by the Engineer. Attenuators shall meet either NCHRP Report 350, Test Level 3 criteria, or MASH (Manual for Assessing Safety Hardware), Test Level 3 criteria, passing both mandatory and optional tests. The truck and attenuator combination shall only be used in the configuration tested. Either the truck or attenuator shall have a sequential arrow display panel or changeable message board. Attenuators that require chocking or blocking of the vehicle to meet NCHRP Report 350 or MASH certification shall not be used. Attenuators shall have rear -mounted, retroreflective chevron stripes and a standard trailer lighting system, including brake lights, turn signals, ICC- bar lights, and two yellow rotating beacons, strobe lights, or LED lights mounted on opposite rear corners of the truck or attenuator approximately 4- 1/2 feet above the bottom of the tires. A Type C arrow panel or changeable message board shall be provided and shall be installed in accordance with the NCHRP 350/ MASH Crashworthiness Certification or FHWA Letter of Acceptance. There shall be a minimum of 7 feet from the roadway to the bottom of the panel or board. Frame work shall be an integral part of the truck and be permanently mounted in such a way as to prevent the unit from separating from the truck in the case of a collision. TABLE OF CONTENTS INDEX SECTION 701 For each proposed truck -mounted or trailer -mounted attenuator, the contractor shall provide a Certificate of Compliance, in accordance with Subsection 106.05 of the specifications, to the Engineer for approval prior to use. For truck- mounted attenuators, the certificate shall also include the certified weigh bill for the truck, and f or trailer -mounted attenuators the certificate shall state the minimum weight for the host vehicle. The certificate shall state that the attenuator meets the specified criteria, and shall clearly state the roll -ahead distance. When trucks require ballast ing to comply with NCHRP 350/MASH Crashworthiness Certifications, the contractor shall provide a letter from the owner supplying the attenuator and truck stating that the ballast is in compliance with the manufacturer’s recommendations and that it is anchored to the truck frame. The letter shall be on the supplier’s official company letterhead and shall include:
A.The current name, address, and phone number of the supplier of the attenuator ;
B.A statement that the individual signing the letter has the legal authority to bind the supplier ;
C.The name, title and signature of the responsible individual ; and
D.The date of the signature. A copy of the Certificate of Compliance and if required, the letter regarding ballast shall be kept in the truck cab or host vehicle, available for immediate inspection when requested by the Engineer. When in use for attenuation, trucks shall be used exclusively for attenuators. When in use for attenuation, such trucks shall not be used to carry or store equipment or devices, secured or unsecured. No modification in configuration or use shall be allowed without a resubmitted certified weigh bill for the Engineer’s approval. Truck- mounted or trailer -mounted attenuators used as shadow vehicles per the MUTCD shall be positioned at a distance greater than the roll - ahead distance in advance of the workers or equipment being protected so that there will be sufficient distance, but not so much that errant vehicles will travel around the shadow vehicle and strike the protected workers and/or equipment. The contractor shall cease operations when a truck- mounted or trailer - mounted attenuator is damaged. The contractor shall not resume operations until the attenuator h as been repaired or replaced, unless authorized by the Engineer. TABLE OF CONTENTS INDEX SECTION 701 701- 3.08 Changeable Message Board: Changeable message boards shall be furnished and maintained by the contractor at the locations shown on the plans and as specified by the Engineer. The operations and messages programmed into the board controller shall be as directed by the Engineer. The changeable message board shall be a complete and operational portable unit which shall consist of a wheeled trailer with an adjustable, changeable message board, board message controller and self -contained power supply. The power supply for the changeable message board shall be a fully independent self -contained trailer -mounted system. The changeable message board power supply shall be battery operated and rechargeable from a solar panel mounted above the changeable message board. The message characters shall be delineated by either elect romagnetically actuated reflective dots or optically enhanced light emitting diode pixels (LED) operating under the control of a digital computer. The contractor shall submit, at the pre- construction conference, a Certificate of Compliance that the changeable message board to be used on this project shall be as described herein. The character formation system and components shall conform to the following requirements:
A.The changeable message board shall be programmable, and shall be capable of displaying a minimum of three lines of message copy, with a minimum of eight characters per line, in various alphanumeric combinations;
B.The changeable message board matrix configuration shall be 35 dots or pixels per character in a 5 horizontal by 7 vertical arrangement of the dots or pixels;
C.The dot or pixel size shall be a 2.5 -inch high by 1.625- inch wide rectangle (minimum), or equivalent area;
D.Each character shall be 18 inches in height and 12 inches in width (minimum) ;
E.The horizontal character separation shall be 3 inches or more ;
F.Dot color shall be fluorescent yellow upon activation and flat black when not activated. The LED pixels shall emit amber light upon activation and be dark when not activated; TABLE OF CONTENTS INDEX SECTION 701
G.The line separation shall be 5 to 12 inches;
H.Changeable message boards shall be protected with a clear lexan- type or equivalent shield that shall not interfere with or diminish the visibility of the sign message;
I.The programmable message board shall be capable of displaying moving arrow patterns as one of the operator - selected programs;
J.The message board shall also be capable of displaying up to two messages in sequence, with variable timing in a minimum of quarter -second increments;
K.The message board shall be clearly visible and legible from a distance of 800 feet under both day and night conditions. The dot -matrix board shall have an internal illumination system that shall automatically activate under low light conditions to achieve the visibility requirements. The LED - pixel matrix board shall adjust light output (pulse width modulation) to achieve the visibility requirements; and
L.The power supply achieved from the battery and solar panel recharging system shall have sufficient capacity to operate the changeable message board for a minimum of 20 days without direct sunshine. The solar panel array shall be capable of recharging the batteries such that 2.5 to 3.5 hours of direct sunshine shall provide for a minimum of one 24- hour period of usage. Additionally, the battery recharging controller shall have an ambient temperature sensing device which will automatically adjust the voltage supplied from the solar panels to the batteries. The sensing device shall ensure that the batteries are properly charged in hot or cold weather and shall provide the sign with sufficient power to operate the sign as specified. When in operation, the changeable message board trailer shall be offset a minimum of 8 feet from the nearest edge of pavement . If the trailer is located behind temporary concrete barrier, a minimum offset of 6 feet will be required. Should the specified shoulder width not be available, a minimum 2 -foot offset from the nearest edge of pavement or temporary concrete barrier shall be required. When positioned on the highway, the changeable message board trailer shall be delineated with a minimum of 10 Type II barricades or vertical panels with Type C steady burn lights at a spacing of 10 to 20 feet , or as shown on the approved traffic control plan. When not in operation, the changeable message board shall be moved a minimum of 30 feet from the edge of pavement . TABLE OF CONTENTS INDEX SECTION 701 The changeable message board trailer shall be placed on a level surface and be secured as recommended by the manufacturer and as directed by the Engineer. The contractor shall provide any necessary incidental grading and cl earing work required to provide a level surface and clear area for the sign. 701- 3.09 Chip Seal Pavement Marker: Chip Seal Pavement Markers and covers shall be located and placed on the asphaltic concrete prior to any work being started on the chip seal coat, all in a manner as approved by the Engineer. Immediately after application of the chip seal coat to the roadway pavement, the plastic covers shall be removed, exposing the reflective tape surfaces. Chip Seal Pavement Markers that are damaged by the contractor shall be replaced by the contractor at no additional cost to the Department. 701- 3.10 Sign Sheetings: Sign sheeting for all temporary work zone signs shall conform to the requirem ents of Section 1007 of the specifications. 701- 3.11 Temporary Removal or Covering of Signs: Where existing signs are not applicable during construction, they shall be removed or have the affected legends covered in place. Unless otherwise stated in the plans, or if a discrepancy exists, the Engineer will approve the method or methods to be used. Removed signs shall be properly shipped, stored, and handled in accordance with the manufacturer's recommendations and in a manner approved by the Engineer to assure that such signs will continue to be suitable upon reinstallation. Where temporary removal of a sign or legend is not practical, the sign face may be covered with an opaque porous cloth or fiber material, folded over the sign edges, and secured at the rear of the sign in such a manner that the sign shall not be damaged. Tape, hardware, ropes, cables, etc., used to secure the covering material shall not touch, place any pressure on, or damage the sign face. The covering shall be maintained by the contractor until the Engineer directs reactivation of the sign by removal of the coverings or the contract ends. The contractor shall restore the signs and legends to their previous conditions, as directed by the Engineer. The contractor shall repair any TABLE OF CONTENTS INDEX SECTION 701 damage to the signs or shall replace the damaged signs, as directed by the Engineer when damage is the result of the contractor's operations. 701- 3.12 Temporary Sign Support s: Temporary Sign supports installed in the ground shall be removed at the completion of the project, the post holes filled and compacted, and the immediate area restored to match the surrounding area. 701- 3.13 Flagging Services: Flagging services shall consist of either civilian, local enforcement officers and their vehicles, or DPS (Department of Public Safety) officers and their vehicles. The Engineer will determine the type of flagger needed, and may adjust the relative number of hours of each type of flagger specified in the traffic control plan. If available, only DPS officers shall be used on Interstate Highways and Urban Freeways. DPS officers shall also be used on other construction projects except when a local law enforcement agency has j urisdiction, in which case a local law enforcement officer and vehicle shall be used. The contractor shall be responsible to procure civilian flaggers, DPS officers, and local enforcement officers. When procuring DPS officers, the contractor shall contact DPS at least two days, excluding weekends and holidays, before flagging services will be required. Such contact must be made between the hours of 7:00 A.M. and 5:00 P.M. (M.S.T.). In the event that local enforcement officers or DPS officers are temporarily unable to provide flagging services, the contractor shall ensure that traffic control is maintained and all personnel are protected, either by providing civilian flaggers or through other means as ap proved by the Engineer. No adjustments to the contract will be allowed for any delays resulting from the unavailability of local enforcement officers or DPS officers. A DPS or local enforcement officer shall not work more than 12 consecutive hours unless an emergency situation exists which, in the opinion of the Engineer, requires that the officer remain in the capacity of a flagger. The contractor shall furnish verification to the Engineer that all civilian flaggers have completed a recognized training and certification program. Flaggers certified by the American Traffic Safety Services Association
A.T.S.S.A.) or by the National Safety Council shall be acceptable. Certification through other programs offering flagger training must be approved by the Eng ineer. Flagger certification must be current. Training and certification shall be required at least once every four years. TABLE OF CONTENTS INDEX SECTI ON 701 701- 4 Method of Measurement: 701- 4.01 General: The Department will reimburse the contractor for the work of maintaining and protecting traffic on the basis of unit bid prices for the various Elements of Work. No additional measurement for payment to the contractor will be made for any Elements of Work other than those listed in the bidding schedule. Elements of Work specified under this subsection which are lost, stolen, destroyed, or are deemed unacceptable by the Engineer, while in use on a project shall be replaced by the contractor and, e xcept as hereinafter specified for temporary impact attenuators, at no additional cost to the Department. Elements of Work will be measured for payment as follows:
A.Elements of Work (Complete -in-Place): The Elements of Work listed herein under Subsection 701- 5 of the specifications will be measured for payment upon the satisfactory completion of the initial installation or obliteration. Except as hereinafter specified under Basis of Payment, no subsequent measurements will be made.
B.Elements of Work (In Use): The elements of work listed herein under Subsection 701- 6 of the specifications will be measured for payment from the time at which the element is put into active use on the project and accepted by the Engineer until such time that the Engineer determines that the element is no longer required. 701- 4.02 Relocation of Work Elements: Following the initial installation of an Element of Work described above, the Engineer may direct the contractor to move the Element of Work from one location and reinstall it at another location. Except as specified elsewhere herein, in Subsection 701 -5.01 of the specificati ons for Temporary Concrete Barrier (Installation and Removal), and Subsection 701- 5.02 of the specifications for Temporary Impact Attenuators (Installation and Removal), no measurement for payment will be made for relocation of Work Elements. When work of a progressive nature is involved, such as resurfacing a road under traffic, or closing a lane or lanes for work to be accomplished during a shift, no measurement for payment will be made for setting up or relocating the necessary traffic control equipment, workers, devices, facilities, signs etc., that are moved concurrently with the advancing operation, or removal at the end of a shift. TABLE OF CONTENTS INDEX SECTION 701 701- 4.03 Payment Exceptions:
A.Deficient Elements of Work: Any deficiencies in the traffic control plan, devices, equipment, services, or other elements of work listed herein under Subsection 701- 4.01(B) of the specifications will be b rought to the attention of the contractor by the Engineer and all deficiencies shall be corrected before the close of that work shift, unless otherwise specified. The contractor shall not be paid for those deficient Elements of Work listed herein under Subsection 701- 4.01(B) of the specifications unless restored to full usefulness prior to the close of the work shift in which notice of the defect is given, or within the time limits specified in Subsection 701- 3 of the specifications. Measurement for payment will not resume until the beginning of the work shift following that work shift in which those elements are restored to usefulness.
B.Substantial Deficiencies: For each work day or work shift during which there are, as determined by the Engineer, substant ial deficiencies in the contractor's traffic control plan, devices, and/or services, no payment will be made to the contractor for any Element of Work listed herein under Subsection 701- 4.01(B) of the specifications. Measurement for payment will not resume for any Element of Work until the beginning of the work day or work shift following that work day or work shift in which all corrective measures have been performed by the contractor and approved by the Engineer. In cases of serious or willful disregard for the safety of the public or its employees by the contractor, the Engineer may place the traffic control elements in proper condition and deduct the cost thereof from monies due or becoming due the contractor.
C.Nondiligent Prosecution of Work: In t he event that the Engineer determines that the contractor's construction operations are not resulting in the diligent prosecution of the work under contract, no payment will be made to the contractor for the Elements of Work listed herein under Subsection 701-4.01(B) of the specifications until such time as the Engineer determines that the contractor is devoting appropriate efforts toward completion of the work. Payment will be suspended effective with the end of the work day or work shift in which written notice is issued to the contractor by the Engineer notifying the contractor of its failure to prosecute the work. Payment will resume with the beginning of the work day or work shift following that work day or work shift in which the Engineer determines that satisfactory efforts are being made by the contractor toward completion of the work. In any case, the contractor shall continue to be TABLE OF CONTENTS INDEX SECTION 701 responsible for maintaining all barriers, attenuators, signs, lights and other traffic control devices in proper fun ctioning condition at all times.
D.Non -Working Periods: Measurement for payment of the Elements of Work listed herein under Subsection 701- 4.01(B) of the specifications will begin on the day they are installed in place for traffic control and direction. When the elements are not needed for traffic control, they shall be removed or covered and will not be measured unless they are required to stay on site in anticipation of future use or emergency use as determined by the Engineer. Should devices be required on site for these purposes they will be measured and paid for by the unit prices. During non- working periods such as holidays and Sundays, the elements in place and in satisfactory condition will be measured for payment on the day following such downtime. During these non- working periods the contractor shall conduct a minimum of one check per day to verify that the elements are in place and in satisfactory condition. No payment will be made to the contractor for the Elements of Work listed herein under S ubsection 701- 4.01(B) of the specifications for non- working periods resulting from a suspension of work that, in the opinion of the Engineer, is due to the fault of the contractor. In any case, the contractor shall continue to be responsible for maintaining all barriers, attenuators, signs, lights and other traffic control devices in proper functioning condition at all times.
E.Limitation of Measurement: Elements of Work listed herein under Subsection 701- 4.01(B) of the specifications that are measured on a unit per day basis will be measured for payment for each 24- hour day. Measurement will be based on the maximum number of units of the specific element of work that are in simultaneous use during any given period regardless of the length of time that the elements are in use and regardless of the number of times the elements are relocated. Measurement will be made after the initial installation and once weekly thereafter for items in continuous use and at any other times changes are made in the use of traffic control elements listed under Subsection 701-4.01(B) of the specifications. The contractor shall notify the Engineer when any changes are made in the use or location of traffic control elements.
F.Expiration of Contract Time: No reimbursement will be made to the contractor for the Elements of Work listed herein under Subsection 701- 4.01(B) of the specifications when they are required in association with construction work being performed after the expiration of the contract time and all approved extensions. TABLE OF CONTENTS INDEX SECTION 701 In any case, the contractor shall continue to be responsible for maintaining all barriers, attenuators, signs, lights and other traffic control devices in proper functioning condition at all times. 701- 4.04 Measurement of Work Elements: Measur ement will be made as follows:
A.Temporary concrete barrier will be measured by the linear foot along the center line of the uppermost surface upon its initial installation (Complete- in-Place) , and upon any subsequent relocations, as defined in Subsection 701- 5.01 of the specifications. Barrier will be measured by linear foot for each 24- hour day for the "In- Use" condition;
B.Temporary Impact Attenuators, such as Sand Barrels and Energy Absorbing Terminals, will be measured by the unit for each complete sand barrel array, regardless of the number of barrels, or energy absorbing terminal upon its initial installation (Complete- in-Place) and upon any subsequent re-installations, as defined in Subsection 701- 5.02 of the specifications. Temporary Impact Attenuators will be measured by the day for each 24- hour day that a temporary sand barrel array or energy absorbing terminal impact attenuator is in place and functional for the “In- Use” condition;
C.Truck-Mounted Attenuators, including driver, and Trailer - Mounted Attenuators, including host vehicle and driver, will be measured by the day for each 24- hour day that a truck- mounted or trailer -mounted attenuator and operator are used to protect the work site;
D.Flashing Arrow Panels will be measured by the day for each 24-hour day that each panel is in place and operating ;
E.Pilot Vehicles, including driver, will be measured by the hour for each approved hour of operation;
F.Civilian flagging services will be measured by the hour for each hour that a civilian flagger is provided. Flagging services by DPS officers and local enforcement officers will be measured for each hour that a uniformed, off -duty DPS officer or law enforcement officer with vehicle is employed directly by the contractor as a flagger within the project limits , when authorized in advance by the Engineer. Quantities will be rounded to the nearest 0.5 hour ; Civilian , DPS, or local enforcement flagging services and traffic control devices required to permit contractors' traffic to enter safely into normal traffic within the project limits will TABLE OF CONTENTS INDEX SECTION 701 be paid under their respective items. Flaggers required by a written local permit agreement will be measured for payment under this item. Additional civilian, DPS, or local enforcement flagging services used within the project limits shall be m easured for payment under this item, subject to the approval of the Engineer ; Civilian , DPS, or local enforcement flagging services and traffic control devices used outside the project limits will be measured under their respective items. The Department will pay 50 percent of the unit bid price for such flaggers and traffic control devices used as described in this paragraph, subject to the approval of the Engineer. The project limits are defined as the construction work zone as shown on the appr oved traffic control plan for the specific section of highway under construction;
G.Temporary Preformed Markings for Pavement, Types II and III, will be measured in accordance with the requirements of Subsection 705- 4 of the specifications;
H.Oblitera te Pavement Marking will be measured in accordance with the requirements of Subsection 708- 4 of the specifications;
I.Changeable Message Boards will be measured by the day for each 24- hour day that the sign is utilized to maintain and control traffic;
J.Oblite rate Pavement Markers will be measured for each unit, Markers and Adhesive pad, or Adhesive pad alone where Markers are missing ;
K.Temporary Delineators and Temporary Pavement Markers will be measured as a unit for each delineator and marker furnished, utili zed, and subsequently removed from the project site. No measurement for payment will be made for delineators and markers that are furnished to replace damaged units as specified under Subsection 701- 4.01 of the specifications;
L.Vertical Panels, Barricades (Types II and III), Tubular Markers, Warning Lights (Types A, B, and C), Traffic Cones (28-inch), High- Level Flag Trees, Drums, Embedded Sign Posts, and Portable Sign Stands (Spring -Type and Rigid), will be measured as a unit for each device furnished and subsequently utilized at the project site for each 24- hour day; Temporary Signs will be measured as Small (less than 10 square feet) and Large (10 square feet or more) regardless TABLE OF CONTENTS INDEX SECTION 701 of sheeting type. Temporary Signs will be measured as a unit for each sign furnished and subsequently utilized at the project site for each 24- hour day. Quantities may be determined on a weekly basis for signs in continuous use; Utilization shall be defined as including those devices ordered to remain on site or covered in accordance with Subsection 701- 4.03(D) of the specifications and approved by the Engineer ;
M.Specialty Signs are signs which are required on the job, as determined by the Engineer or shown on project plans, and are not reusable as traffic control signs. Specialty Signs shall contain information which is project and location specific. The sign sheeting shall be orange fluorescent prismatic rigid sheeting unless otherwise specified, and the size, type and legend of the Specialty Signs will be determined by the Engineer, unless specified on the project plans. Specialty Signs will be measured for payment by the square foot, inclusive of borders. Any sign over 20 square feet in area shall be considered a Specialty Sign; and
N.Obliterate Pavement Legends or Arrows will be measured by each separate symbol, arrow or legend. 701- 5 Basis of Payment for Elements of Work (Complete - in-Place): 701- 5.01 Temporary Concrete Barrier (Installation and Removal): Temporary concrete barrier, measured as provided above, will be paid for at the contract unit price, which price shall be full compensation for the work, complete in place, as specified herein and as shown on the plans, includi ng furnishing, placing, dismantling, and removal. The price bid shall also include any required connection devices, barrier markers, and glare screen. Fifty percent of the contract unit price for temporary concrete barrier will be paid upon satisfactory i nstallation. Should it be necessary to dismantle, pick up and relocate a portion of the barrier installation during construction, whether laterally or vertically, that portion of the removed and relocated barrier wil l be considered a new installation and paid for at 100 percent of the contract unit price. Fifty percent of the contract unit price will be paid upon final removal. No payment will be made for portions of the barrier which the contractor can adjust or realign without dismantling and picking up, such cost being TABLE OF CONTENTS INDEX SECTION 701 considered as included in the bid price for Temporary Concrete Barrier "Installation and Removal." The Engineer will be the sole judge as to whether devices are to be dismantled, picked up and reinstalled, or are to be adjusted or realigned. 701- 5.02 Temporary Impact Attenuators (Installation and Removal): Temporary Impact Attenuation Devices shall include Sand Barrels and Energy Absorbing Terminals. Temporary Impact Attenuation Devices, measured as provided above, will be paid for at the contract unit price, which price shall be full compensation for the work, complete in place, as specified herein and as shown on the plans, including furnishing the devices with replacement parts, installing, removing and stockpiling the devices. Fifty percent of the contract unit price for temporary impact attenuators will be paid upon satisfactory installation. Should it be necessary to dismantle, pick up and reinstall attenuation devices during construction, the work of removing and reinstalling the devices will be considered a new installation and paid for at 100 percent of the contract unit bid price. Fifty percent of the contract unit price will be paid upon final removal. The Engineer will be the sole judge as to whether devices are to be dismantled, picked up and reinstalled or are to be adjusted or realigned. No additional payment will be made for devices which are adjusted or realigned, the cost being considered as included in the contract unit price paid for Temporary Impact Attenuator “ Installation and Removal .” Measurement and payment for furnishing materials, equipment and labor and repairing attenuation devices that are damaged by the traveling public will be made in accordance with the requirements of Subsection

109.04 of the specifications.

No measurement or direct payment will be made for furnishing replacement parts and repairing devices damaged by other than the traveling public. 701- 5.03 Temporary Preformed Markings for Pavement: The accepted quantities of Temporary Preformed Markings, measured as provided above, will be paid for at the unit bid price for the type specified, which price shall be full compensation for the work, complete in place, including necessary pavement cleaning, and maintaining Types II and III temporary markings in construction work zones. Installation for accepted quantities shall be considered satisfactory when the mark ings are installed in conformance with the requirements of the plans. TABLE OF CONTENTS INDEX SECTION 701 When the type of temporary preformed marking is not specified, the contractor shall furnish Type II. Additional reimbursement will be made for replacement of Temporary Markings when the contractor is required by the Engineer to install marking materials on distressed pavements or during adverse weather conditions and subsequent failure occurs. Distressed pavement conditions are defined as alligator cracking, bleeding, or spalling of bitu minous pavements and spalling of PCC pavements. Adverse weather conditions are defined as any occurrence where application is required at pavement temperatures less than 50 degrees F or when precipitation occurs within 24 hours before application. The De partment will pay for the replacement, where failures occur, at the unit bid price for the items. In the event a second failure occurs when markings have been reapplied on distressed pavements or under weather conditions described above, the Engineer shal l determine if conditions require primer, alternate methods of marking, or reapplication of Preformed Markings. Preformed markers and markings will be paid for at the unit bid price. Primers or other methods of markings deemed necessary by the Engineer w ill be paid for in accordance with the provisions of Subsection 109.04 of the specifications. 701- 5.04 Blank : 701- 5.05 Obliterate Pavement Marking: Obliterate Striping, measured as provided above, will be paid for at the unit bid price per linear foot, which price shall be full compensation for the work, complete, including furnishing all labor and equipment required and restoring the pavement surface to a condition acceptable to the Engineer. The accepted quantities of Arrows, Symbols, or Legends obliterated shall be paid for at the unit bid price for each item. 701- 5.06 Temporary Pavement Markers and Chip Seal Pavement Markers: The accepted quantities of Temporary Pavement Markers and Chip Seal Pavement Markers measured as provided above will be paid for at the unit bid price each, which price shall be full compensation for the work, complete in place, as specified herein and as shown on the plans. 701- 5.07 Obliterate Pavement Markers: Obliterate Pavement Markers will be paid for at the unit bid price each, which price shall be full compensation for the work, complete, including adhesive pad. TABLE OF CONTENTS INDEX SECTION 701 701- 5.08 Tempora ry Delineators: The accepted quantities of Temporary Delineators, measured as provided above, will be paid for at the unit bid price each, which price shall be full compensation for the work, complete, including subsequent removal as specified herein and as shown on the plans. 701- 5.09 Specialty Signs: The accepted quantities of Specialty Signs, measured as provided above, will be paid for at the unit bid price per square foot which price shall be full compensation for the work, complete in place, including manufacturing, delivery to the job site, erection and eventual removal. The price paid shall also include the cost of flags, ballasting, mountings, sign stands, and embedded posts as required. 701- 5.10 Temporary Removal or Covering of Signs: No payment will be made for Temporary Removal or Covering of Signs, including maintenance of storage facilities for the signs or sign legends and the maintenance of sign coverings, the cost being considered as included in the price of contract items. 701- 6 Basis of Payment for Elements of Work (In Use): 701- 6.01 Quantity Variances: Payment for variances in quantities shall be in accordance with Subsection 104.02 of the specifications, except that, for decreases in quantities, the following items will be considered as major items:

A.Temporary Concrete Barrier (In- Use);
B.Barricades; and
C.Temporary Signs. 701- 6.02 Temporary Concrete Barrier (In Use): The accepted quantities of Temporary Concrete Barrier, measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the use of the barrier installation(s), including glare screen, and for furnishing all material, equipment and labor and maintaining, realigning and adjusting the barri er installation(s), as specified herein and as shown on the plans. No payment will be made for barrier not in service, such as, barrier in stockpiled configuration awaiting phase construction change. There will be no payment for each day that the Engineer determines the barrier traffic reflectors are not in good reflective condition, or for each day that the Engineer determines the barrier is out of alignment. TABLE OF CONTENTS INDEX SECTION 701 701- 6.03 Channelization Devices:
A.Vertical Panels, Barricades (Type II), Traffic Cones (28-inch), and Tubular Markers: The accepted quantities of Vertical Panels, Barricades (Type II), Traffic Cones (28- inch), and Tubular Markers, measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the use and maintenance of each device (in- use), including labor and equipment. Type I barricades which are substituted for Type II barricades in accordance with Subsection 701- 2.08 of the specifications shall be paid for at the unit bid price for Type II barricades. The unit bid price for barricades includes the cost of ballasting as required.
B.Barricades (Type III) and High -Level Flag Trees: The accepted quantities of Barricades (Type III) and High- Level Flag Trees, measured as provided above will be paid for at the unit bid price, which price shall be full compensation for the use and maintenance of each device (in- use), including labor and equipment. The unit bid price for barricades includes the cost of ballasting and flags, as required. When signs are to be mounted on Barricades (Type III) or High- Level Flag Trees, the signs will be paid for as Temporary Signs, Section 701-6.04 of the specifications .
C.Drums: The accepted quantities of Drums, measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the use and maintenance of each device (in- use), including labor and equipment.
D.Warning Lights (Types A, B, and C): The accepted quantities of Warning Lights (Types A, B, and C), measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the use and maintenance of each device (in -use), including labor and equipment. TABLE OF CONTENTS INDEX SECTION 701
E.Embedded Sign Posts, Portable Sign Stands (Spring - Type or Rigid) and Portable Sign Posts -Barrier Mounted: The accepted quantities of Embedded Sign Post, Portable Sign Stands (Spring -Type and Rigid) and Portable Sign Posts -Barrier Mounted, measured as provided above will be paid for at the unit bid price, which price shall be full compensation for the use and maintenance of each device (in -use), including labor and equipment. The unit bid price for signs includes the cost of ballasting as required. 701- 6.04 Temporary Signs: The accepted quantities of Temporary Signs, measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the use and maintenance of each device (in- use), including labor and equipment. The unit bid price for signs includes the cost of flags and ballasting as required. No separate payment shall be made for speed plates, distance plates, or other minor sign message boards that are attached to a temporar y sign, or temporary sign post, as shown on the plans. If additional signs are attached to those shown on the plans or to existing temporary sign installations, payments will be made as additional temporary signs. 701- 6.05 Truck -Mounted Attenuators: The accepted quantities of truck- mounted attenuators or trailer -mounted attenuators, measured as provided above, will be paid for at the unit bid price for truck -mounted attenuators per day of work site protection, which rate shall be full compensation for the work, complete in place , including, but not limited to, furnishing all materials; equipment; attached arrow panel or changeable message board; and labor (including the operator); and maintaining and repairing the truck and truck- mounted attenuator, or trailer -mounted attenuator and host vehicle, as specified herein and on the project plans. No adjustment to the unit bid price for truck- mounted attenuators will be made when trailer -mounted attenuators are provided, such price being considered as full compensation for the work, as specified herein, regardless of which type of attenuator is used to protect the work site. It shall be the contractor's responsibility to replace any damaged or destroyed parts of the truck- mounted attenuator or trailer -mounted attenuator and host vehicle at no additional cost to the Department. TABLE OF CONTENTS INDEX SECTION 701 701- 6.06 Flashing -Arrow Panels , and Change able Message Boards: The accepted quantity of flashing -arrow panels, measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the work, complete in place, including furnishing, operating, maintaining, and relocating the panels on the work site, and providing all necessary labor and equipment. The accepted quantities of c hangeable message boards, measured as provided above, will be paid for at the unit bid price per day, which price shall be full compensation for the work, complete in place, including incidental grading; furnishing, operating, maintaining, and relocating the boards on the work site; and providing all necessary labor . Signs, sign stands, Type II barricades, or vertical panels and lights that are used to delineate changeable message boards shall be paid for at the respective unit bid prices. 701- 6.07 Pilot Services and Flagging Services: The accepted quantities of pilot vehicles, measured as provided above, will be paid for at the unit bid price for pilot vehicles with driver, which price shall be full compensation for the work, complete in place including, but not limited to, furnishing and maintaining the vehicle and furnishing the driver. Overtime hours for pilot vehicles will be paid for at the unit bid price for pilot vehicle with driver. No additional payment will be made for over time hours, the cost being considered as included in the unit bid price. The accepted quantities of flagging services provided by the local enforcement officers and civilian flaggers, measured as provided in Subsection 701- 4.04(F) of the specifications, w ill be paid for at the unit bid price, which price shall be full compensation for the work, complete in place, including all overhead costs and fringe benefits. Overtime hours for local enforcement officers and civilian flaggers will be paid for at the re spective unit bid prices. No additional payment will be made for overtime hours, the cost being considered as included in the unit bid price for local enforcement officers and civilian flaggers. The accepted quantities of flagging services provided by the DPS officers, measured as provided above, will be paid for at the contract unit price per hour, which price shall be full compensation for the work complete in place. If needed, travel time may be paid on a case by case basis, as evaluated by the Engineer in accordance with the requirements of Subsection 104.02 of the specifications. 701- 6.08 Temporary Impact Attenuators (In -Use): The accepted quantities of temporary impact attenuators, measured as provided above, will be paid for at the unit bid price, which price shall be full compensation for the use of the complete attenuating device and TABLE OF CONTENTS INDEX
Source: Arizona Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages of 1,296.