General Provisions (00100-00999)

106— MATERIAL QUALITY AND TESTING REQUIREMENTS ................................ .................... 51

DE · 2025 Standard SpecificationsBook pages 34View official source ↗

TABLE OF CONTENTS PAGE ii 104.2 Contract Changes. ................................ ................................ ................................ ..................... 104.3 Notification of Contract Changes. ................................ ................................ ............................. 104.4 Existing Signs. ................................ ................................ ................................ ............................ 104.5 Bus Stops. ................................ ................................ ................................ ................................ .. 104.6 Material Testing Certification. ................................ ................................ ................................ .. 104.7 Accident Notification. ................................ ................................ ................................ ............... 104.8 Maintaining Traffic. ................................ ................................ ................................ ................... 104.9 Rights In and Use of Materials Found in the Work. ................................ ................................ ..

104.10 Additional Utility Relocations Required by the Department; Restoration of Surfaces Opened

by Permit. ................................ ................................ ................................ ................................ ............

104.11 Value Engineering Proposals. ................................ ................................ ................................ ..

104.12 Final Cleaning of Project Site; Maintenance and Cleanup of Staging Areas. ..........................

104.13 Contractor's Responsibility for the Work. ................................ ................................ ...............

104.14 Required Notifications for Disturbing Property and Using Bridges. ................................ .......

104.15 E -Construction. ................................ ................................ ................................ .......................

SECTION 105 — RESPONSIBILITIES OF THE DEPARTMENT; INTERPRETATION OF THE CONTRACT DOCUMENTS; MAINTENANCE DURING CONSTRUCTION; CLAIMS; PROJECT ACCEPTANCE .................. 105.1 Authority of the engineer. ................................ ................................ ................................ ........ 105.2 Authority and Duties of Inspectors. ................................ ................................ .......................... 105.3 Inspection of the Work. ................................ ................................ ................................ ............ 105.4 Plans, Shop Drawings, and Working Drawings. ................................ ................................ ........ 105.5 Conformity with the Plans and Specifications. ................................ ................................ ......... 105.6 Coordination of the Contract Documents. ................................ ................................ ............... 105.7 Contractor’s Supervision. ................................ ................................ ................................ .......... 105.8 Cooperation Between Contractors. ................................ ................................ .......................... 105.9 Utilities within the Project Limits; Miss Utility One -Calls. ................................ ........................

105.10 Construction Stakes, Lines, and Grades Provided by the Department. ................................ ..

105.11 Removal of Defective and Unauthorized Work. ................................ ................................ .....

105.12 Load Restrictions. ................................ ................................ ................................ ....................

105.13 Maintenance During Construction. ................................ ................................ .........................

105.14 Opening Sections of the Project to Traffic. ................................ ................................ .............

105.15 Claims Resolution. ................................ ................................ ................................ ...................

105.16 Partial Acceptance; Project Acceptance; Final Acceptance; and Project Closeout. ...............

SECTION 106 — MATERIAL QUALITY AND TESTING REQUIREMENTS ................................ .................... 106.1 Source of Supply and Quality Requirements. ................................ ................................ ........... TABLE OF CONTENTS PAGE iii 106.2 Samples, Tests, and Referenced Specifications. ................................ ................................ ....... 106.3 Compliance Certification. ................................ ................................ ................................ .......... 106.4 Manufacturing Plant Inspection. ................................ ................................ .............................. 106.5 Field Laboratory. ................................ ................................ ................................ ....................... 106.6 Storage and Handling. ................................ ................................ ................................ ............... 106.7 Unacceptable Materials. ................................ ................................ ................................ ........... 106.8 Disposal of Unacceptable Materials. ................................ ................................ ........................ 106.9 Department -Provided Material. ................................ ................................ ............................... SECTION 107 — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ................................ ............. 107.1 Laws to be Observed. ................................ ................................ ................................ ................ 107.2 Permits, Licenses, and Taxes. ................................ ................................ ................................ .... 107.3 Patented Devices, Materials, and Processes. ................................ ................................ ........... 107.4 Contractor's Responsibility to Protect Utility Property and Services. ................................ ...... 107.5 Federal Aid Participation. ................................ ................................ ................................ .......... 107.6 Construction Safety, Health, and Sanitary Standards. ................................ .............................. 107.7 Public Convenience and Safety. ................................ ................................ ................................ 107.8 Use of Explosives. ................................ ................................ ................................ ...................... 107.9 Protection and Restoration of Property. ................................ ................................ ..................

107.10 Responsibility for Damage Claims. ................................ ................................ ..........................

107.11 Furnishing Right -Of-Way. ................................ ................................ ................................ ........

107.12 Personal Liability of Public Officials. ................................ ................................ .......................

107.13 Contractor’s Responsibility for the Work after Final Acceptance; No Waiver of Legal Rights.

................................ ................................ ................................ ................................ ............................

107.14 Hazardous Materials Discovered Within the Project Limits. ................................ ..................

107.15 Audits. ................................ ................................ ................................ ................................ .....

SECTION 108 — SUBCONTRACTING; NTP; PROGRESS SCHEDULES; TIME EXTENSIONS; LIQUIDATED DAMAGES; TERMINATION ................................ ................................ ................................ ...................... 108.1 Contract Subletting. ................................ ................................ ................................ .................. 108.2 Preconstruction Meeting; Submitting a Schedule; Notice to Proceed. ................................ .... 108.3 Commencement of Work; Counting Contract Time. ................................ ................................ 108.4 Progress Schedule. ................................ ................................ ................................ .................... 108.5 Traffic Requirements and Contractor's Operations; Completing Work. ................................ .. 108.6 Preference for Delaware Labor; Character of Workers and Equipment; Specified Construction Methods. ................................ ................................ ................................ ................................ ............. 108.7 Extensions of Contract Time. ................................ ................................ ................................ .... 108.8 Failure to Complete on Time. ................................ ................................ ................................ ...

Source: Delaware Standard Specifications for Road and Bridge Construction, 2025 Edition. Pages 34 of 779.