207STRUCTURAL EXCAVATION AND BACKFILLING

DE · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 127–0 Save this section

Ask about Section 207

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

207.1Description.

This work consists of excavation and backfilling for placement of structures.

207.2Material.

Borrow Section 209 and Section 1001

207.3Construction.

A.Structural Excavation.
1.Handle excavated material in accordance with Section 202.3. Dispose of unsuitable material and

other obstructions in accordance with Section 106.8.

2.Remove unsuitable material below the foundation elevation as directed by the engineer, as

extra depth excavation.

a.The type of backfill material below the foundation elevation will be as directed by the

engineer.

3.The engineer will inspect the footing area after excavation is complete. Place concrete or

precast units after the engineer approves the stability of the foundation material.

B.Shoring.
1.Provide shoring in accordance with Section 604.3.6, Section 604.3.7, and when required by

OSHA standards.

2.Remove temporary shoring and bracing upon completion of the work, unless otherwise noted in

the contract.

C.Rock Excavation for Structures andTrenches.
1.The Department will consider all material the contractor cannot excavate without blasting or

using rippers, and all boulders and detached stones with a volume of 1/3 cubic yard or greater, as rock excavation. The classification "Rock Excavation" shall not apply to soft disintegrated rock, bituminous pavements, gravel, broken stone, or concrete pavements. These and other materials are classified as normal excavation and are included under Section 202.3.3. Drain pockets left in the surface of the rocks before backfilling.

2.Excavate material classified as rock as follows:
a.For structures, a width of 24-inches outside of the neat line and a depth of 12-inches below

the subgrade.

b.For pipe trenches, a width of 18-inches from each side of the outside wall of the pipe and a

depth of 12-inches below the pipe invert.

3.Complete required blasting in accordance with Section 202.3.10.C.
D.Backfilling
1.Backfilling is placing materials as defined in the contract above the foundation stabilization

material and below the subgrade of the pavement structure or the ground elevation.

2.Place and compact borrow in accordance with Section 202.3.8 and the following:
a.Place and spread backfill material in uniform horizontal lifts no greater than 8 inches loose

measurement. Compact to 95 percent or more of the maximum density, before placing the next lift. Maintain proper moisture content to achieve the required density.

b.Compact backfill material without causing damage or applying excessive pressure against

structures. Place fill adjacent to the end bent of a bridge only to the bottom of the backwall until the superstructure is in place. Place backfill on each side of the structural unit simultaneously to proposed grades so that compaction does not create unbalanced stresses on the structure.

c.When backfilling over structures, use heavy mechanical compacting equipment only after

placing a minimum of 24-inches of cover over the structural unit or in accordance with the structure manufacturer’s recommendations.

207.4Method of Measurement.

A.Structural Excavation
1.The Department will measure excavation in cubic yards of material excavated within the

payment limits as follows:

a.Excavation volume is limited by vertical planes located 24-inches outside of the neat line

perimeter of the vertical faces of the structural element.

b.The upper limit as the lowest combination of the following:
i.The existing ground surface;

ii. the bottom of roadway excavation; iii. the bottom of channel excavation; and iv. excavation incidental to removal of structures and obstructions.

2.The Department will not measure excavation of material outside the payment limits as defined

above, unless the engineer directed excavation beyond the specified limits.

3.The Department will measure extra depth excavation in linear feet below the bottom of the

structural foundation as shown on the plans.

B.Temporary Shoring and Bracing
1.The Department will not measure temporary shoring or bracing.
C.Rock Excavation for Structures andTrenches
1.The Department will measure the quantity of rock excavation for structures and trenches in

cubic yards.

a.The Department will measure the volume of rock excavation to the limits of excavation

required by the contract or as adjusted by the engineer based on exposing the rock to perform cross-sections before and after excavation.

b.The Department will not measure rock excavated from depths in excess of 12-inches below

the pipe invert or bottom of footing.

D.Providing Structural Backfill
1.Providing of structural backfill will be measured in cubic yards. Backfill will not exceed 1.3 times

the volume determined by the backfilling template.

E.Structural Backfilling
1.The Department will measure backfilling in cubic yards of material backfilled within the payment

limits as follows:

a.defined in 207.4.A.1.a, less the volume of any structures.
b.The upper limit will be finished grades minus depth of riprap or pavement.
c.The lower limit will be a combination of the top surface of the foundation stabilization and the

top surface of structures.

207.5Basis of Payment.

A.The Department will pay the quantity of:
1.Structural excavation at the contract unit price per cubic yard. Price and payment constitute full

compensation for:

a.Excavating, hauling, storage, stockpiling and reuse, and disposing of excavated materials;
b.placing and removing shoring or bracing;
c.material excavated or backfilled outside of the payment limits;
d.temporary shoring and bracing left in place; and
e.dewatering.
2.Rock excavation for structure and trench rock excavation at the contract unit price per cubic

yard. Price and payment will constitute full compensation for:

a.Drilling, blasting, and presplitting;
b.excavating, removing rock, and placing and compacting backfill materials within the template

area;

c.hauling and disposing of surplus material;
d.draining pockets in the surface of the rock; and
e.removing shattered or loosened material and replacing it with approved backfill material.
3.Providing structural backfill in accordance with section 209 at the contract unit price per cubic

yard. No payment will be made for backfill material generated under Section 207.

4.Structural backfilling at the contract unit price per cubic yard. The Department will consider that

price and payment as constituting full compensation for placing and compacting all approved backfill.

B.The Department will not pay for rock excavation that is more than 12-inches below the pipe

invert.

C.When the engineer requires extra depth excavation beyond the prescribed limits, the Department

will pay the unit price plus the additional percentage according to the pay limits provided in Table 207.5 -1 below.

Table 207.5 -1. Payment for Additional Excavation Depth Depth Lowered Additional Percent More Than (feet) Not Over (feet) 0 5 25 5 8 60 8 10 100

ITEM DESCRIPTION UNIT

207003 STRUCTURE BACKFILLING CY 207004 STRUCTURE EXCAVATION CY 207010 ROCK EXCAVATION FOR STRUCTURES AND TRENCHES CY 207011 ROCK EXCAVATION FOR STRUCTURES AND TRENCHES (FIXED PRICE) CY 207022 STRUCTURAL BACKFILL, BORROW TYPE B, PROVIDING ONLY CY 207023 STRUCTURAL BACKFILL, BORROW TYPE C, PROVIDING ONLY CY

Get an email when 207 changes

Delaware revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Delaware Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 127–0 of 786. View official source ↗

Ask about this section

Scoped to Delaware Standard Specifications for Road & Bridge Construction, Section 207 — STRUCTURAL EXCAVATION AND BACKFILLING. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.