General Provisions (00100-00999)

806FINAL 20181218

KY · 2019 Standard SpecificationsBook pages 559565View official source ↗

SECTION 806  ASPHALT MATERIALS

806.01 DECRIPTION. The asphalt materials section covers performance-graded (PG)

binders, emulsified asphalts, cut-back emulsions, and liquid asphalt for cold-patching mixtures. Provide the specified grade of material conforming to the requirements in this section from suppliers listed in the Department ’s List of Approved Materials. Inclusion on the list of approved suppliers is obtained by following the guidelines of the Approved Supplier Certification (ASC) program contained in Kentucky Method (KM) 64-444, by following the guidelines of the Emulsified Asphalt Supplier Certification (EASC) program contained in KM 64-445, or by pretesting and approval. The Department may approve other types of asphalt materials provided they conform to the requirements of the type specified in the contract.

806.02 SAMPLING. The Department will sample all asphalt materials according to KM

64-404.

806.03 PG BINDERS. This subsection covers the requirements and pay schedules for PG

binders.

806.03.01 General Requirements. Provide PG binders conforming to AASHTO M

332 with any differences found in the PG Binder Requirements and Price Adjustment Schedule. Contrary to M 332, PG 76-22 must ha ve a minimum solubility of 97.0 percent. Do not use any form of recycled engine oil, including Recycled Engine Oil Bottoms (REOB), as a modifier in asphalt materials. PG BINDER REQUIREMENTS AND PRICE ADJUSTMENT SCHEDULE PG 58-28 (PG 58S-28) Test Specification 100% Pay 90% Pay 80% Pay 70% Pay 50% Pay(1) Original Binder Dynamic Shear, G*/sin δ 1.00 kPa Min. 1.00-0.95 0.94-0.90 0.89-0.85 0.84-0.80 < 0.80 Viscosity 3 Pa·s RTFO Residue Mass Loss, % 1.00 Max. 1.01-1.10 1.11-1.20 1.21-1.30 1.31-1.40 > 1.40 MSCR Jnr3.2, Max. 4.5 kPa-1 < 4.7 4.71-4.75 4.76-4.80 4.81-4.85 ≥ 4.86 Jnr_diff, Max 75 % PAV Aging BBR Creep Stiffness 300 MPa Max. 300-315 316-330 331-345 346-360 > 360 m-value 0.300 Min. 0.290-0.300 0.285-0.289 0.280-0.284 0.275-0.279 < 0.274 Dynamic Shear, G*sin δ @ 25 ˚C 5,000 kPa Max. 0-5,200 5,101-5,300 5,301-5,400 5,401-5,500 > 5,501 806-1 PG 64-22 (PG 64S-22) Test Specification 100% Pay 90% Pay 80% Pay 70% Pay 50% Pay(1) Original Binder Dynamic Shear, G*/sin δ 1.00 kPa Min. 1.00-0.95 0.94-0.90 0.89-0.85 0.84-0.80 < 0.80 Viscosity 3 Pa·s RTFO Residue Mass Loss, % 1.00 Max. 1.01-1.10 1.11-1.20 1.21-1.30 1.31-1.40 > 1.40 MSCR Jnr3.2, Max. 4.5 kPa-1 < 4.7 4.71-4.75 4.76-4.80 4.81-4.85 ≥ 4.86 Jnr_diff, Max. 75 % PAV Aging BBR Creep Stiffness 300 MPa Max. 300-315 316-330 331-345 346-360 > 360 m-value 0.300 Min. 0.290-0.300 0.285-0.289 0.280-0.284 0.275-0.279 < 0.274 Dynamic Shear, G*sin δ 5,000 kPa Max. 0-5,200 5,201-5,300 5,301-5,400 5,401-5,500 > 5,501 PG 76-22 (PG 64E-22) Test Specification 100% Pay 90% Pay 80% Pay 70% Pay 50% Pay(1) Original Binder Dynamic Shear, G*/sin δ 1.00 kPa Min. 1.00-0.95 0.94-0.90 0.89-0.85 0.84-0.80 < 0.80 Viscosity 3 Pa·s RTFO Residue Mass Loss, % 1.00 Max. 1.01-1.10 1.11-1.20 1.21-1.30 1.31-1.40 > 1.40 MSCR Jnr3.2, Max 0.5 kPa-1 < 4.7 4.71-4.75 4.76-4.80 4.81-4.85 ≥ 4.86 Jnr_diff, Max 75 % Recovery, 3.2 kPa, % 60 Min. ≥58 56 55 54 < 53 PAV Aging BBR Creep Stiffness 300 MPa Max. 300-315 316-330 331-345 346-360 > 360 m-value 0.300 Min. 0.290-0.300 0.285-0.289 0.280-0.284 0.275-0.279 < 0.274 Dynamic Shear, G*sin δ 6,000 kPa Max. 0-6,200 6,201-6,300 6,301-6,400 6,401-6,500 > 6,501

1.If allowed to remain in place, the Department will review materials performing in this range on a project-by-project basis to determine if removal of the material is warranted.

806.03.02 Handling Requirements. Submit written instructions to the Division of

Materials for handling requirements. Submit the Supplier’s written instructions and requirements for the proper use and handling of the asphalt binder to the Engineer. Include tank requirements, construction equipment requirements, and storage and mixing temperature requirements. Submit material test data and a certification of conformance prior to shipping material.

806.03.03 Modification . Use only styrene-butadiene (SB) or styrene-butadiene-

806-2 styrene (SBS) modifiers. Poly-phosphoric acid may be added to modified binders to aid in cross-linking. Any use of recycled engine oil bottoms (REOB) or other engine oil derivatives in the manufacture or modification of a binder are strictly prohibited. All binders are to be homogeneous blends. Do not use in-line blending at the asphalt plant.

806.04 EMULSIFIED ASPHALTS. This subsection covers emulsified asphalts of the

following grades:  RS-2  SS-1  SS-1h ●CSS-1h  AE-200  HFRS-2  HFMS-2

806.04.01 General Requirements. Furnish emulsified asphalts that are homogeneous,

showing no separation of asphalt during normal handling or storage. The Engineer will reject emulsified asphalt that has been frozen.

806.04.02 Specific Requirements for Grades RS-2, SS-1, SS-1h, HFRS-2, HFMS-2 .

Conform to AASHTO M 140 with the following exceptions and requirements of the Emulsified Asphalt Requirements and Price adjustment Schedule except the cement-mixing test is not required.

806.04.03 Specific Requirements for Grade CSS-1h. Conform to AASHTO M 208

and requirements of the Emulsified Asphalt Requirements and Price adjustment Schedule except the cement-mixing test is not required.

806.04.04 Specific Requi rements for Grade AE-200. Conform to the

Emulsified Asphalt Requirements Schedule

806.04.05 Testing of Grades RS-2, SS-1, SS-1h, CSS-1h, AE200, HFRS-2, and

HFMS-2. Perform tests according to AASHTO T 59. Use Tyrone Formation limestone as the reference aggregate for the coating test. EMULSIFIED ASPHALT REQUIREMENTS AND PRICE ADJUSTMENT SCHEDULE Test Grade Specification 100% Pa y 90% Pay 80% Pay 60% Pay 0% Pay Viscosity, 15-17 12-14 9-11  8 Saybolt Furol SS-1, SS-1h, CSS-1h 20-100 18-110 111-120 121-130 131-140  141 @ 77 ºF, s AE-200  50  45 40-44 35-39 30-34  29 Viscosity, RS-2, 60-64 55-59 50-54  49 Saybolt Furol HFRS-2 75-400 65-440 441-480 481-520 521-560  561 @ 122 ºF, s HFMS-2 ≥ 100 ≥ 90 80-89 70-79 60-69 ≤ 59 Residue by SS-1, SS-1h, CSS-1h  57  56 55 54 53  52 Distillation, % HFMS-2,  65  64 61-63 58-60 55-57  54 HFRS-2, RS-2 AE-200  60  59 56-58 53-55 50-52  49 Oil Distillates, % AE-200 0-6 0-7 8-10 11-13 14-16  17 Demulsibility, % RS-2  60  57 51-56 45-50 39-44  38 HFRS-2 ≥ 50 ≥ 47 41-46 35-40 29-34 ≤ 28 Residue 34-36 31-33 28-30  27 Penetration SS-1h, CSS-1h 40-90 37-98 99-108 109-120 121-130  131 806-3 85-88 80-84 77-79  76 SS-1, HFMS-2 90-250 89-251 252-255 256-258 259-262  263 85-88 80-84 77-79 ≥76 RS-2 90-150 89-151 152-155 156-158 159-162 ≥163 95-98 90-94 87-89 ≥ 86 HFRS-2 100-250 99-151 152-155 156-158 159-162 ≥163 Float Test AE-200, HFRS-2, @ 140 ºF, s HFMS-2  1,200  1,100 1000-1,099 900-999 800-899  799 Coating Test, % AE-200  95  90 85-89 80-84 75-79  74 Sieve, % RS-2, HFRS-2, HFMS-2, SS-1, SS-1h, CSS-1h  0.10  0.30 0.31-.45 0.46-0.60 0.61-0.75  0.76 Ductility, cm SS-1, SS-1h, CSS-1h @ 77 ºF RS-2, HFMS-2  40  38 35-37 32-34 29-31  28 HFRS-2, Storage SS-1, SS-1h, CSS-1h Stability, % (1) RS-2, HFRS-2,  1.0 AE-200, HFMS-2 Particle Charge CSS-1h Positive Ash Content, % (1) SS-1, SS-1h, CSS-1h HFRS-2, RS-2, ≤ 1.0 HFMS-2, AE-200

806.05 POLYMER ASPHALT EMULSIONS. . These materials are designed to be

used in microsurfacing, chipseals, and stre ss-absorbing membrane interlayers (SAMIs). Make the polymer modification to the base asphalt before the emulsification process. Ensure that polymer-modified asphalt emulsions conform to AASHTO M 316 and the following Polymer Asphalt Emulsion Requirements and Price Adjustment Schedule. POLYMER ASPHALT EMULSION REQUIREMENTS AND PRICE ADJUSTMENT SCHEDULE Test Grade Specification 100% Pay 90% Pay 80% Pay 60% Pay 0% Pay 80-89 70-79 60-69  59 Viscosity @ 122 ºF, SFS CRS-2P 100 - 400 90 - 440 441-480 481-520 521-560 ≥ 561 15-17 12-14 9-11 ≤ 8 Viscosity @ 77 ˚F, SFS CQS-1hP 20 - 100 18 - 110 111-120 121-130 130-140 ≥ 141 CRS-2P  65 64 61-63 58-60 55-57  54 Distillation Residue, % CQS-1hP ≥ 62 ≥ 61 58-61 55-57 53-54 ≤ 52 Sieve, % CRS-2P, CQS- 1hP ≤ 0.1  0.35 0.36-0.50 0.51-0.70 0.71-0.90  0.91 Softening Point, ˚F CQS-1hP ≥ 135 ≥ 134 132 130 128 ≤ 127 Residue Penetration 85-88 80-84 77-79  76 @ 77 ˚F CRS-2P 90 - 150 89-151 152-155 156-158 159-162  163 806-4 34-36 31-33 28-30 ≤ 27 CQS-1hP 40 - 90 37-98 99-108 109-120 121-130 ≥ 131 Residue Ductility @ 39 ºF, cm CRS-2P  30  28 25-27 22-24 20-21  19 Residue Ductility @ 77 ˚F, cm CQS-1hP ≥ 40 ≥ 38 35-37 35-34 30-31 ≤ 29 % Recovery @ 77 ºF CRS-2P  60  57 54-56 51-53 48-50  47 % Recovery @ 50 ˚F CQS-1hP ≥ 50 ≥ 47 44-46 41-43 38-40 ≤ 37 % Demulsibility CRS-2P ≥40 ≥35 32-34 29-31 26-28 ≤25 Particle Charge CRS-2P, CQS- 1hP Positive Storage Stability CRS-2P ≤ 1 Ash Content, % CRS-2P, CQS- 1hP ≤ 1.0

806.06 Asphalt Coating and Paving Fo R Metal Pipe, Pipe Arches,

AND ARCHES. These requirements apply to all corrugated metal pipe, pipe arches, and arches that are required to be asphalt-coated or coated and paved, except field-assembled structural plate pipe and pipe arches as specified in Section 612.

806.06.01 Asphalt Coating Material . Furnish asphalt coating material

conforming to AASHTO M 190. The Department will obtain random samples of the asphalt coating material for analysis. The Department will reject all material not conforming to AASHTO M 190.

806.07 LIQUID ASPHALT FOR COLD-PATCHING MIXTURES. Ensure that the

liquid asphalt material furnished under this subsection provides satisfactory coating properties, workability, and adherence characteristics for patching during cold and damp weather in either asphalt or concrete pavement surfaces. Furnish patching mixtures made with liquid asphalt or KP-6 that is capable of being stored for at least 6 months before being used and that is readily workable at all ambient temperatures above 25 F. With each shipment of material, provide test results certifying that the materials furnished conform to the following KP-6 Requirements table. Additionally, take a one- gallon sample from each transport as specified in the Materials Field Sampling and Testing Manual from the Department’s Division of Materials. Ship the sample to the Division of Materials by any expedient means of transport. Obtain the Division of Materials’ approval before using the liquid asphalt. 806-5 KP-6 REQUIREMENT S Property Test Method Specification 100% Pay 90% Pay 80% Pay 60% Pay 0% Pay Flash Point, ˚F AASHTO T 48 ≥ 200 ≥ 195 190 - 194 188-189 186 - 187 ≤ 185 Water, % AASHTO T 55 ≤ 0.2 ≤ 0.5 0.6 – 1.0 1.1 – 1.2 1.3 - 1.5 ≥ 1.6 680 ˚F Distillation AASHTO T 78 Temperature (F) Vol. of Total Distillate, % Vol. of Original Sample, % to 437 None None to 500 0 - 0.5 0 - 5 to 600 10 - 65 0 - 25 Residue From Distillation @ 680 ˚ F(% Volume by Difference) 72 - 95 76-96 Tests on Residue from Distillation Modified Penetration With Cone(1) ASTM D 5 180 min. Ductility, 39 ˚F, 1 cm/minute AASHTO T 51 100 min. Ash Content, % AASHTO T 111 ≤ 1.0

1.Ensure the cone conforms to ASTM D 217, except that the interior construction may be modified as necessary. Ensure the total moving weight of the cone and attachments is 150  0.1 g.

806.08 FIELD TOLERANCES. The Department, according to established criteria,

allows tolerance limits to be applied to field samples. These limits are incorporated into the price adjustment schedules. These tolerances are for field samples only and will not apply to certification samples.

806.09 ACCEPTANCE. The Department will normally perform field quality acceptance

testing on samples obtained at the project site or Contractor’s storage facility. When required by the Department, the asphalt supplier shall send, at his expense, representative samples of materials stored at the source terminal or refinery to the Department’s Division of Materials. When the Department accepts asphalt materials by pretesting and certification, provide two copies of the bill-of-lading/load ticket with each hauling unit. The bill-of-lading/load ticket will contain the material’s lot number, a statement of the quantity of materials within each load by weight and volume, and other information as required by KM 64-444 or KM 64-445. The Contractor and Department’s representative will each receive copies at the point of delivery. Do not use asphalt materials that are not properly covered by certification or otherwise tested and approved by the Department. When asphalt materials not of the specified grade, not appropriately certified, or not conforming to the applicable requirements when tested become incorporated into projects, the Engineer will, according to Section 105, evaluate the work affected and require adjustment of pay quantities or corrective work as deemed appropriate. 806-6

806.09.01 Acceptance of Non-Specification Asphalt Materials. Furnish asphalt

materials purchased for Department work conforming to the requirements of this section. The Department will apply the following procedures only when reasonably acceptable work has been produced using the material in quest ion, as provided in Subsection 105.04. When the use of non-specification material results in an inferior or unsatisfactory product, remove and replace the material at no expense to the Department, or at the Vendor’s expense when materials are purchased directly by the Cabinet. The Department may accept, at a reduced Contract price, asphalt materials not of the specified grade, not appropriately certified, or not conforming to the applicable requirements when check-tested after an evaluation of the work. However, the Department will not consider these procedures as a means to continue accepting non-specification material. The Department will determine the price adjustment based on the delivered cost of the material. If the liquid asphalt has been incorporated into the project as an asphalt mixture, the deduction will be applied to the posted price of asphalt item. When the material is not of the specified grade or not appropriately certified, the Department may deduct the full cost of the material. When the material fails to conform to the applicable requirements, the Department will normally make deductions according to the pay schedules in this section. As provided in Subsection 806.08, the Department has established field tolerances for determining the acceptability of failing material at no price deduction. The Department will determine the frequency of check-sampling and testing on pretested material. When available, the Department will make deductions for failing test results based on the average of two check samples representing the material in question. When a sample fails on two or more tests, the Department may add the deductions, but the total deduction will not exceed 100 percent.

806.10 TIME LIMITATION ON APPROVALS. The Department will test materials

in storage at the terminal as deemed necessary. Additionally, the Department will require the retesting, and re-approval, of materials not incorporated into the work within one month (2 months for PG binders) of the shipment date. 806-7 SECTION 807  JOINT MATERIALS

807.01 DESCRIPTION. This section covers joint sealers and joint fillers of various types.

The Department may approve other types of joint materials provided they conform to the requirements of the type specified in the Contract.

807.02 SAMPLING. The Department will sample all materials according to the Materials

Field Sampling and Testing Manual from the Department’s Division of Materials.

807.03 Joint Sealers.

807.03.01 Hot-Poured, Elastic Joint Sealers. Furnish hot-poured, elastic joint

sealers that meet or exceed the requirements of ASTM D 6690, Type II and the following table. Provide a certification of conformance with each lot of sealer. HOT-POURED, ELASTIC JOINT SEALER REQUIRMENTS AND PRICE ADJUSTMENT SCHEDULE Test S pecification 100% Pa y 90 % Pa y 80 % Pa y 60% Pa y 0% Pa y Cone Penetration 90 max. 91-92 93-94 95-96 97-98  99 Softening Point, °C 80 min. 79-79.9 78-78.9 77-77.9 76-76.9  76 Resilience, % 60 min. 59- 58 57-56 55- 54 53-52  51 Bond, Non-immersed Pass

807.03.02 Expansion Joint Seals

A.Seals. Expansion joint seals shall be “V Seal” type or “pre-compressed silicone and foam” type. Preformed neoprene compression joint seals are not acceptable. Approved expansion joint seals are listed on the Department’s List of Approved Materials. The size of each expansion joint seal shall be approved by either the Department’s Division of Structures or Division of Maintenance, Bridge Preservation Branch.
B.Adhesives. Seal adhesives shall be per manufacturer’s recommendations.

807.03.03 Preformed, Expansion Joint Strip Seals With Lubricant Adhesive.

Furnish preformed, expansion joint strip sealers of approved design for the applicable joints to be sealed. Furnish sealers and lubricant adhesives that conform to the following requirements as applicable.

A.Sealers . Furnish sealers that conform to ASTM D 5973 with the following exceptions and additions:
1.The Department’s Division of Materials and Division of Bridge Design will approve the design of the expansion joint strip sealers. Approved sealers will be placed on the Department’s List of Approved Materials. Obtain the Department’s approval for sealers not on the List of Approved Materials before shipping to the project.
2.Ensure that the manufacturer provide s sealers accurately marked at 12-inch intervals to determine elongation after installation.
3.Ensure that the sizes of sealers used in JPC pavement comply with the applicable Standard Drawings. 807-1
Source: Kentucky Standard Specifications for Road and Bridge Construction, 2019 Edition. Pages 559565 of 718.