The Contractor shall provide Materials for the Work from sources capable of producing and delivering uniformly acceptable Materials in accordance with 1503, “Conformity with Contract Documents,” and the Progress Schedule. The Contractor shall notify the Engineer of intended sources of supply after award of the Contract and before Material delivery or use for the Engineer to inspect and test the Materials before delivery or use. Unless otherwise specified, the Contractor shall provide new Materials of the specified grade and type or kind. The Contractor shall not use multiple Material sources to provide one kind or class of Material, unless otherwise approved in writing by the Engineer. If the Engineer approves the use of Material from more than once source, the Engineer will set the conditions for each source change. The Contractor shall provide Materials from alternative sources capable of producing uniformly acceptable Material as approved by the Engineer if, during production, the Engineer finds either of the following:
Materials
delivery of unacceptable Material
Get an email when 1601 changes
Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.