Control of Material

1605Substitute Materials

MN · 2025 Standard Specifications✓ Full text on BuildSpecBook pages 72–0 Save this section

Ask about Section 1605

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

When the Department classifies Material to be incorporated in the Work according to size, strength, type, or other design classification for separate units, courses, sections, or installations, the intent is to specify the acceptable level of compliance, quality, or service. The Contractor may provide Material exceeding the specified class, quality, service life, or other Contract requirements to facilitate the Work. The Contractor may use substitutions only as approved by the Engineer, at no additional cost to the Department. The Engineer will approve the substitution and establish the revised basis for acceptance in writing.

Get an email when 1605 changes

Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Minnesota Standard Specifications for Construction, 2025 Edition. Pages 72–0 of 1,081. View official source ↗

Ask about this section

Scoped to Minnesota 2025 Standard Specifications for Construction, Section 1605 — Substitute Materials. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.