The Contractor shall handle Materials to preserve quality and fitness for the Work . The Contractor shall transport Materials in vehicles constructed to prevent loss of Material after loading and measuring. The Contractor shall ensure the quantities of Materials as loaded are the same as the quantities received on the Project. The Contractor shall use methods and Equipment to load and haul bulk Materials that prevent contamination or loss of Material after measurement and acceptance for the Work.