Control of Material

1607Handling Materials

MN · 2025 Standard Specifications✓ Full text on BuildSpecBook pages 73–0 Save this section

Ask about Section 1607

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

The Contractor shall handle Materials to preserve quality and fitness for the Work . The Contractor shall transport Materials in vehicles constructed to prevent loss of Material after loading and measuring. The Contractor shall ensure the quantities of Materials as loaded are the same as the quantities received on the Project. The Contractor shall use methods and Equipment to load and haul bulk Materials that prevent contamination or loss of Material after measurement and acceptance for the Work.

Get an email when 1607 changes

Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Minnesota Standard Specifications for Construction, 2025 Edition. Pages 73–0 of 1,081. View official source ↗

Ask about this section

Scoped to Minnesota 2025 Standard Specifications for Construction, Section 1607 — Handling Materials. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.